Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-RFP-051.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering & Facilities
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs feasibility analysis for pump station power requirements for prime contractors on Las Virgenes Municipal Water District projects. Evaluates Southern California Edison (SCE) power availability and capacity for proposed pump stations and analyzes electrical infrastructure needs using load calculation software. Requires California PE license (Electrical). Delivers Pump Station and SCE Power Feasibility Evaluation.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study
Solicitation # 2026-RFP-051
The Las Virgenes Municipal Water District is soliciting proposals under solicitation 2026-RFP-051 for a Conceptual Engineering Feasibility and Fatal Flaw Analysis Study. The project involves evaluating the technical feasibility, constructability, and permissibility of a treated water transmission pipeline and pump station connecting the Pacific Coast Highway area to Agoura Road via Malibu Canyon and Las Virgenes Road. This infrastructure is intended to potentially support the conveyance of desalinated ocean water or provide an interconnection with Los Angeles County Waterworks District 29. The study must objectively identify fatal flaws that could impair the project, specifically addressing challenges such as shallow hard bedrock, narrow roadways, and high traffic volumes. Key deliverables include draft and final feasibility reports, capital and operational cost estimates, a project schedule, and a risk register, with analysis covering pipeline diameters from 16 to 54 inches. Proposals are due by December 4, 2026, and will be evaluated based on a weighted system: proposal cost (30%), design expertise (15%), personnel experience and qualifications (15%), and project schedule and management (15%). The selected consultant must provide a Project Manager registered as a Professional Engineer in the State of California and maintain 1 million dollars in professional liability insurance. Contractual requirements include compliance with California prevailing wage laws and equal opportunity employment standards. Payment will be made within 45 days of receiving monthly itemized statements. The District will utilize TIFF and PDF files for the study as AutoCAD drawings for the area are unavailable.
Engineering & Facilities

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details
NAICS: 541330
New
SLED
Cooper City Stormwater Master Plan (H1470 | 4673-305-P14)
Solicitation # RFQ2026-2
The City of Cooper City, Florida, issued solicitation RFQ2026-2 to secure a consultant for the development of a comprehensive, grant-compliant Stormwater Master Plan (SWMP). Funded through the FEMA Hazard Mitigation Grant Program (HMGP), the project aims to improve the understanding of existing infrastructure, identify high-risk flooding areas, and assess water-quality practices to inform long-term capital improvement planning and increase flood resiliency. The scope is divided into two primary tasks: the creation of a preliminary SWMP based on initial flood modeling and the finalization of a completed SWMP for adoption into the Local Mitigation Strategy, with a total project fee of 281,000 dollars. Proposals must be submitted via the OpenGov Procurement Portal by November 30, 2026. The selection process is points-based, evaluating team qualifications, past experience, methodology, and staffing availability, with a potential second tier involving oral presentations. Awarded consultants must adhere to strict federal and state requirements, including the Davis-Bacon Act for prevailing wages, E-Verify, and certifications regarding scrutinized companies. The contract includes mandatory compliance with FEMA and FDEM regulations, and payments are processed within 45 days of receiving a proper invoice in accordance with the Florida Local Government Prompt Payment Act.
Utilities

POSTED

about 13 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → Engineering & Facilities

Same awarding agency

NAICS: 325120
SLED
Liquid Oxygen Equipment Prepurchase
Solicitation # 2026-RFB-049
The Las Virgenes-Triunfo Joint Powers Authority is soliciting bids under solicitation 2026-RFB-049 for the procurement and delivery of a Liquid Oxygen (LOX) storage and vaporization system. The scope of work includes the supply of a storage tank, ambient air vaporizers, a remote fill station, and all necessary connecting piping, valves, sensors, and controls. This equipment is intended for the Westlake Filtration Plant in Westlake Village, California, and will be installed by others under a separate contract. The award will be granted to the lowest responsible responsive bidder based on the total estimated cost. Bids must be submitted exclusively through the procurement portal by December 2, 2026. Key performance milestones include coordinating design requirements within 30 days of the Notice to Proceed, delivering the system to the project site by November 1, 2027, and achieving substantial project completion by December 31, 2027. The contract requires the submission of bid, performance, and payment bonds, as well as general liability insurance. Additionally, the seller must provide seismic certification, a manufacturer's certificate of proper installation, and a minimum of two person-days of on-site installation assistance. The contract is subject to various regulatory and legal requirements, including the Davis-Bacon Act, the State Fair Employment and Housing Act, and federal non-discrimination mandates such as Executive Order 11246 and the Civil Rights Act of 1964. Furthermore, the seller must certify that all iron and steel products are produced in the United States. Goods are delivered FOB Destination, and the District may withhold 10 percent of the price until the equipment is installed, tested, and operating. All packages must be marked with specific details, including the purchase order number, bill of lading, and equipment weight.
Industrial Gas Manufacturing

POSTED

15 days ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS