Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Commissioning & Closeout Services

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Commissioning and Closeout Services involves performing final testing and system verification for prime contractors on facility projects at the Allegany College of Maryland. The selected provider will conduct system commissioning to verify a 190.5 kW DC capacity utilizing IV curve tracers and power quality analyzers. Additionally, the contractor is responsible for developing operating instructions and conducting necessary staff training, with NABCEP certification recommended for the performing personnel. Key deliverables for this engagement include the submission of as-built drawings, a comprehensive commissioning report, and detailed training logs. Interested parties must submit their responses by November 23, 2026, in accordance with the solicitation posted on November 4, 2026. The project falls under NAICS code 541330 and is managed through the state of Maryland.

General Info

Commissioning and closeout services for Allegany College of Maryland solar project by November 2026.

Agency

Maryland

Place of Performance

MD, USA

Set-Aside

NONE

Documents

This scope was carved out of BPM059617.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ACM Turnkey Solar Photovoltaic Solar System- Western MD Works

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMaryland
ContactsNo contacts available
OfficeN/A
Organization / Agency
Maryland
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs final testing and system verification for prime contractors on Allegany College of Maryland facility projects. Conducts system commissioning to verify 190.5 kW DC capacity using power quality analyzers and IV curve tracers. Develops operating instructions and provides staff training. NABCEP certification recommended. Delivers as-built drawings, commissioning report, and training logs.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Malibu Canyon - Las Virgenes Road Pipeline and Pump Station Conceptual Engineering Feasibility and Fatal Flaw Analysis Study
Solicitation # 2026-RFP-051
The Las Virgenes Municipal Water District is soliciting proposals under solicitation 2026-RFP-051 for a Conceptual Engineering Feasibility and Fatal Flaw Analysis Study. The project involves evaluating the technical feasibility, constructability, and permissibility of a treated water transmission pipeline and pump station connecting the Pacific Coast Highway area to Agoura Road via Malibu Canyon and Las Virgenes Road. This infrastructure is intended to potentially support the conveyance of desalinated ocean water or provide an interconnection with Los Angeles County Waterworks District 29. The study must objectively identify fatal flaws that could impair the project, specifically addressing challenges such as shallow hard bedrock, narrow roadways, and high traffic volumes. Key deliverables include draft and final feasibility reports, capital and operational cost estimates, a project schedule, and a risk register, with analysis covering pipeline diameters from 16 to 54 inches. Proposals are due by December 4, 2026, and will be evaluated based on a weighted system: proposal cost (30%), design expertise (15%), personnel experience and qualifications (15%), and project schedule and management (15%). The selected consultant must provide a Project Manager registered as a Professional Engineer in the State of California and maintain 1 million dollars in professional liability insurance. Contractual requirements include compliance with California prevailing wage laws and equal opportunity employment standards. Payment will be made within 45 days of receiving monthly itemized statements. The District will utilize TIFF and PDF files for the study as AutoCAD drawings for the area are unavailable.
Engineering & Facilities

POSTED

about 11 hours ago

DEADLINE

in 30 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS