Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

ELECTRIC COIL SERVICE INC

UEI: HFJ3QNLE92Y7

ELECTRIC COIL SERVICE INC is a federal contractor, registered under UEI HFJ3QNLE92Y7. It has been awarded $1,019,858 in federal contracts. Primary work spans Motor and Generator Manufacturing, Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing, and Unknown NAICS. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

HFJ3QNLE92Y7

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

87

All time

Active

0

Currently performing

Completed

87

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with ELECTRIC COIL SERVICE INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for ELECTRIC COIL SERVICE INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in ELECTRIC COIL SERVICE INC's top NAICS codes and agencies

NAICS: 335311
New
SLED
THREE PHASE 23KV PADMOUNT TRANSFORMERS
Solicitation # BD-27-2082-PMLP-PMLP-134598
The Peabody Municipal Light Plant (PMLP) is soliciting bids for three-phase 23kV padmount transformers, specifically 60HZ, mineral oil immersed, class OA rated self-cooled, compartmental-type distribution transformers rated 3000KVA and smaller. The requirements include units with a primary voltage of 22,860 GRD Y / 13,200 volts and 125KV BIL insulation. Specific line items include 750 KVA, 1000 KVA, and 2000 KVA transformers with 480 Y / 277 secondary voltages and loop switches. All equipment must comply with the latest IEEE standard C57.12.34. The award process heavily weights transformer efficiency, requiring bidders to provide guaranteed maximum no-load and full-load losses, percent impedance, and detailed construction drawings. Bidders must provide firm pricing valid for 60 days, and those without upward escalator clauses are preferred. Deliveries must be made to the Peabody, Massachusetts jobsite between 08:00am and 03:00pm, with 72 hours' advance notice and packaging that allows for fork truck offloading from the rear. Payment is set at 100% of the quoted price within 30 days of delivery and inspection. Compliance requirements include adherence to the Occupational Safety and Health Act of 1970, PMLP safety rules, and Massachusetts tax laws under MGL c. 62C, §49A. Submissions must include a Certificate of Non-Collusion, tax compliance certification, and PCB certification prior to shipment.
PMLP - Peabody Municipal Light Plant

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 332812
New
Federal
Area of Interest (AoI) – Metal Cleaning and Finishing Services
Solicitation # W911KF25SC002-AoI0016
The Army Contracting Command Anniston Army Depot is seeking innovative commercial solutions for depot-level metal cleaning, surface preparation, and finishing services for combat vehicle components. This requirement, issued under solicitation W911KF25SC002-AoI0016, encompasses chemical stripping, alkaline immersion cleaning, and abrasive media cleaning to remove paint, corrosion, scale, and carbon. The scope includes a wide array of plating and coating processes such as anodizing, chromate conversion, black oxide, electroless nickel, hard chrome, zinc, tin, copper, and phosphate. The government anticipates utilizing a Multiple Award Task Order Contract structure to ensure technical redundancy and coverage. Key performance requirements include a strict seven-working-day turnaround time and the contractor's responsibility for the secure pick-up and delivery of parts to and from the depot in Alabama. Offerors must demonstrate significant facility capabilities, including specific tank and oven dimensions, crane clearances, and the capacity to handle high-volume part streams of varying sizes. A rigorous quality assurance approach is mandatory, requiring the ability to perform various ASTM and MIL-SPEC tests, such as salt spray, adhesion, and hydrogen embrittlement, either in-house or through certified laboratories. Evaluation will be based on technical feasibility, the safety and efficiency of cleaning methods, innovation in eco-friendly processing, and the robustness of quality control systems. Additionally, the government will assess the offeror's track record with hazardous material management and compliance with environmental regulations. Interested parties must submit a written Solution Brief by October 28, 2026, including a Rough Order of Magnitude or unit pricing structure for evaluation.
Department Of Defense

POSTED

about 15 hours ago

DEADLINE

in 8 days
View Details
NAICS: 335311
New
International
Design, Supply and Installation of the STATCOM
Solicitation # 25065
The British Columbia Hydro and Power Authority is conducting a Request for Information under solicitation number 25065 for the design, supply, and installation of a Static Synchronous Compensator (STATCOM) solution. This initiative is intended to support a major load project for a large industrial customer located within the North Thompson and Nicola regions of British Columbia. The project scope involves the design, factory simulation testing, supply, and installation of four STATCOMs at both new and existing substations. Technical requirements specify that equipment must be 24 MVAR or above with a base voltage of 138kV, and the STATCOM controller must be fully compatible with an existing 20-year-old ABB controller for a coordinated operation period of six to eight months. The procurement requires adherence to North American Standards, specifically IEEE C57.12.00 and CSA C88, with seismic qualification according to IEEE 693. Key deliverables include testing and commissioning, on-site training with manuals, and the provision of spare parts and special tools. This current process is for information gathering only and does not constitute a pre-qualification or shortlisting event. BC Hydro intends to issue a formal Request for Proposal in the second quarter of 2027, with a target contract award in the fourth quarter of 2027. Responses must be submitted electronically via BC Bid or to the designated contact, Man Kit Suen, by the deadline of November 17, 2026.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 28 days
View Details