Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

King General Contractors, Inc 307 Bonham Road BRISTOL VA 24201 USA

UEI: SLED_560F4CF0A8CD4E6D

King General Contractors, Inc 307 Bonham Road BRISTOL VA 24201 USA is a federal contractor, registered under UEI SLED_560F4CF0A8CD4E6D. It has been awarded $185,300 across 1 federal contract. Primary work spans Roofing Contractors. Top awarding agencies include George Washington/jefferson National Forest.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_560F4CF0A8CD4E6D

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
George Washington/jefferson National Forest$185.3K100%
Awards by NAICS
238160 - Roofing Contractors$185.3K100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in King General Contractors, Inc 307 Bonham Road BRISTOL VA 24201 USA's top NAICS codes and agencies

NAICS: 238160
New
Dormitory Roof Replacement in Iowa
Solicitation # dormitory-roof-replacement-iowa
The Ottumwa Job Corps Center is soliciting bids for a comprehensive roofing system replacement for the Building 7 Dormitory in Ottumwa, Iowa. The project encompasses approximately 16,250 square feet of roofing and 1,600 square feet of parapet wall assemblies. Qualified contractors must evaluate the existing mechanically attached TPO system and propose either a complete tear-off and replacement or a recover roofing system using a fully adhered single-ply EPDM or TPO membrane. The scope of work includes steel roof deck preparation, installation of polyisocyanurate and tapered insulation for positive drainage, high-density cover boards, and the installation of new perimeter edge securement, metal flashing, and coping systems. Additionally, the contractor is responsible for repairing deteriorated sealants and masonry on parapet walls and modifying roof drains, overflow drains, and scuppers as needed to ensure a watertight system. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Award requirements include the use of manufacturer-certified installers and the provision of a minimum 20-year Manufacturer No Dollar Limit (NDL) warranty and a 2-year contractor workmanship warranty. All work must comply with current IBC and ASCE 7 wind design requirements and ANSI/SPRI ES-1 edge securement standards. This project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage determinations and the submission of certified payroll reporting. Proposals must include a detailed construction schedule and an itemized breakdown of labor and materials.
Ottumwa Job Corps

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238160
New
SLED
Digester 4 Roof Repair Project
Solicitation # 20260814015
The Digester 4 Roof Repair Project, solicitation number 20260814015, is a lump-sum fixed-price contract issued by the Sacramento Area Sewer District (EchoWater) for the cleaning, preparation, and repair of the floating cover of Digester 4 at the EchoWater Facility in Elk Grove, California. The scope of work includes repairing deteriorated areas where coatings have been compromised or foam exposed, followed by the application of a spray polyurethane foam and cold fluid applied roof system. The contractor is responsible for all labor, abatement, disposal, equipment, and materials. The contract includes a base bid and a 20,000 dollar allowance for unanticipated site conditions and spare parts. Performance is subject to strict technical and safety standards, including compliance with CalOSHA, UFC, and various ASTM and SMAQMD environmental regulations. Key requirements include maintaining valid California State License Board and DIR registrations, providing a noncollusion declaration, and adhering to CARB regulations for diesel equipment. Materials must be delivered in original manufacturer packaging and stored in enclosed structures. Award decisions are based on price, fitness, quality, and a preference for California-made materials. All project administration, including progress payment requests and technical submittals, is managed electronically through the District's Project Controls System.
Sacramento Area Sewer District

POSTED

1 day ago

DEADLINE

in 4 days
View Details