Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

LK TECH CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SI

UEI: SLED_83438AC776A8315C

LK TECH CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SI is a federal contractor, registered under UEI SLED_83438AC776A8315C. It has been awarded $53,690,000 across 1 federal contract. Primary work spans Water and Sewer Line and Related Structures Construction. Top awarding agencies include 0906 Aq Co Det B Contracti.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_83438AC776A8315C

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
0906 Aq Co Det B Contracti$53.7M100%
Awards by NAICS
237110 - Water and Sewer Line and Related Structures Construction$53.7M100%
Awards by Agency Over Time
Export
Awards by Place of Performance

Open opportunities in LK TECH CO., LTD. 18, NAMSURA 1-GIL, OKSEO-MYEON GUNSAN-SI's top NAICS codes and agencies

NAICS: 237110
New
SLED
SAMISH WAY UTILITY REPLACEMENTSThe City of Bellingham is inviting sealed bids for the SAMISH WAY UTILITY REPLACEMENTS project under solicitation number 44B-2026, with proposals due by August 12, 2026, at 11:00 a.m. The project involves significant infrastructure upgrades along Samish Way and G Street, including the replacement of approximately 935 feet of 8-inch concrete sanitary sewer main with a 12-inch PVC SDR35 line from Consolidation Ave to Abbott St, installation of about 2,190 feet of 12-inch water main between Bill McDonald Pkwy and Otis St, and replacement of 540 feet of 8-inch water main along portions of Abbott St and E Laurel St. Work on G Street includes 3,230 feet of CIPP rehabilitation and 791 feet of new 8-inch sanitary sewer main from Halleck St to North St, with additional piping in adjacent alleys. Night work will be required on Samish Way. The estimated project value ranges between $4.6 million and $5.5 million. All bids must use the City’s official form and include bid security equal to at least five percent of the total bid amount in the form of a certified check, cashier’s check, cash, money order, or bid bond payable to the Finance Director. A full performance and payment bond is mandatory, although retainage may be substituted for smaller projects. Bid documents are available online through the City’s procurement portal or at the Purchasing Office, and inquiries can be directed to bids@cob.org. The bid window opens on July 22, 2026, with a clarification deadline of August 5, 2026. The City reserves the right to postpone the award, reject any or all bids, or waive minor irregularities that do not affect substantial rights.
City of Bellingham

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
Federal
Well 4 PFAS/PFOA UpgradeThis solicitation seeks the design and construction of an Ion Exchange Resin System and associated upgrades to Base Well 4 for the removal of PFAS and PFOA contaminants, with all work to be performed in accordance with the Statement of Work dated 10 July 2026. The total performance period is 360 calendar days, divided into a 120-day design phase, a 210-day construction phase, and a 30-day contract closeout period. All bids must be submitted as hardcopy sealed proposals exclusively, with no electronic submissions accepted, and are due no later than 10:00 A.M. local time on Tuesday, 8 September 2026. The requirement is a 100% Small Business Set-Aside under NAICS code 237110, with an estimated value between $5 million and $10 million, and is subject to the Federal Acquisition Regulation’s overhaul provisions for small business contracting. Attendance at the mandatory site visit on Wednesday, 29 July 2026, at Shaw Air Force Base in South Carolina is required for all prime contractors; failure to attend will result in disqualification. Offerors must submit completed base pass request forms by 1:00 P.M. EDT on Friday, 24 July 2026, and arrive 30 to 45 minutes early for installation access processing, as no escorts will be provided and retired military IDs are not valid for contractor access. All inquiries must be submitted to the Contract Specialist and Contracting Officer no later than 9:00 A.M. local time on Wednesday, 5 August 2026. No funds are currently available, and no legal obligation or reimbursement will arise until funds are appropriated and formally confirmed in writing by the Contracting Officer. The government reserves the right to cancel the solicitation at any time without liability for offeror costs. Additional technical drawings in .dwg format, referenced in attachments 17 through 23, are available only upon direct request.
FA4803 20 Cons Lgca

POSTED

about 22 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237110
New
SLED
Florence Lane Pump Station & Piping UpgradesSealed bids for the Florence Lane Pump Station & Piping Upgrades, Project No. C12831, are due electronically via Bid Locker by 2:00 p.m. local time on August 12, 2026; no late submissions will be accepted. Bidders must first register with Bid Locker, complete a Confidentiality Agreement, and wait for manual approval, which may take up to one business day, with a recommendation to complete this process at least three business days prior to the deadline. The project involves replacing three pumps and motors, upgrading approximately 34 feet of steel discharge piping, installing new valves, sensing equipment, and air release valves, replacing an exhaust fan and louvers, modifying pressure transducer assemblies, excavating and tapping into a 36-inch water line to install a 24-inch valve with associated fittings and trench repair, and coordinating with the District’s system integrator and electricians for SCADA and electrical work. The District will supply major components, while the contractor must procure additional equipment and ensure all work complies with the contract schedule, with a Notice to Proceed targeted for no later than August 31, 2026. The Engineer’s estimate ranges from $550,000 to $650,000. All bids must include a certified check or bid bond equal to five percent of the bid amount, a completed Statement of Bidder’s Qualifications, and a declaration affirming compliance with prevailing wage laws under ORS 279C.800 through 279C.870, as well as a statement regarding resident bidder status and Oregon Construction Contractors Board registration. Contractors must hold a license under ORS 468A.720 for asbestos abatement. A mandatory pre-bid conference is required on July 28, 2026, at the project site; failure to attend renders a bid non-responsive. Bidders must also submit a First Tier Subcontractor Disclosure Form to Bid Locker within two hours of the deadline or face disqualification. Original bid security must be mailed to the District within five business days after bidding closes. Bid documents are available through Bid Locker or Plan Center Northwest, and bidders must sign a confidentiality agreement regardless of their document source. Addenda are issued electronically, and bidders are responsible for monitoring and downloading all updates. The project involves critical infrastructure information protected under federal and state law, and no part of the bid documents
Tualatin Valley Water District

POSTED

1 day ago

DEADLINE

in 20 days