MIKE HOOKS, LLC

UEI: F5UYXMGLZWK3CAGE: 0CUN7

MIKE HOOKS, LLC is a federal contractor, registered under UEI F5UYXMGLZWK3 and CAGE code 0CUN7. It has been awarded $1,391,211,900 across 286 federal contracts. Primary work spans Other Heavy and Civil Engineering Construction, Unknown NAICS, and Unknown NAICS. Top awarding agencies include Department Of Defense and W076 Endist Galveston.

Contact Information

Registration and classification details

Registration

UEI Code

F5UYXMGLZWK3

CAGE Code

0CUN7

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit OrganizationLimited Liability CompanyWoman-Owned Business

NAICS Codes

237990Other Heavy and Civil Engineering Construction(Primary)

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

MIKE HOOKS, LLC specializes in maintenance dredging and heavy civil engineering operations for critical maritime navigation channels, primarily serving U.S. military infrastructure. The contractor delivers precision dredging services using cutterhead pipeline dredges to remove sediment buildup from ...

MIKE HOOKS, LLC specializes in maintenance dredging and heavy civil engineering operations for critical maritime navigation channels, primarily serving U.S. military infrastructure. The contractor delivers precision dredging services using cutterhead pipeline dredges to remove sediment buildup from harbor channels, passes, and inland waterways, ensuring uninterrupted naval and commercial vessel transit. Their technical expertise includes hydrographic survey coordination, sediment management, environmental compliance, and the operation of 27–30-inch pipeline dredging systems in complex coastal environments across the Gulf Coast. Key differentiators include proven proficiency in executing high-frequency, low-downtime maintenance dredging under stringent Department of Defense operational requirements, with demonstrated success in dynamic environments such as Mobile Harbor, Gulfport, Biloxi, and Perdido Pass. The company maintains a consistent, long-term relationship with the Department of Defense, delivering mission-critical dredging services to support U.S. Navy and Army Corps of Engineers navigation priorities. Their work directly enables port readiness and strategic access for defense logistics, with recurring contracts focused on maintaining navigable depths in high-traffic coastal waterways of Alabama, Mississippi, and Florida. MIKE HOOKS, LLC operates primarily under NAICS 237990, focusing on other heavy and civil engineering construction, with a narrow but deep specialization in aquatic infrastructure maintenance. Their market positioning centers on niche, high-reliability dredging services for federal maritime assets, distinguishing them through operational agility and regional familiarity with Gulf Coast hydrology. As a woman-owned business headquartered in Westlake, Louisiana, the company leverages its local presence and specialized equipment to deliver responsive, compliant services across federal waterways. The entity is certified as a Woman-Owned Business, enhancing its eligibility for targeted federal contracting programs while reinforcing its commitment to diversity in federal infrastructure contracting.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
237990 - Other Heavy and Civil Engineering Construction$1.3B95.4%234990 - Unknown NAICS$41.0M3%
- Unknown NAICS$19.7M1.5%
Others - Other NAICS codes (1 codes, <0.5% each)$2.0M0.2%
Awards by Agency Over Time
Awards by Place of Performance

Compete with MIKE HOOKS, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for MIKE HOOKS, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in MIKE HOOKS, LLC's top NAICS codes and agencies

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

about 17 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

about 20 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. Managed by the US Army Corps of Engineers New York District, the project focuses on the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The scope includes restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands to complement broader flood risk management and shore protection efforts. The project magnitude is estimated between $15 million and $30 million, and the resulting award will be a firm fixed-price contract. The procurement follows a best-value trade-off process conducted in accordance with FAR 36.3. Phase One focuses on qualifying offerors based on relevant specialized experience and past performance to shortlist up to five firms for Phase Two. Evaluation factors for the final award include relevant specialized experience, technical approach, past performance, management approach, and a small business participation plan, with non-price factors combined being approximately equal in importance to price. Phase One proposals were due by October 19, 2026. Technical requirements are guided by 30% design documentation and include strict adherence to New Jersey Department of Environmental Protection standards for waste disposal and plant quality. The contractor must provide an aggressive project schedule, with an initial schedule due within 42 days of the notice to proceed. Key deliverables include the restoration of tidal and freshwater wetlands, and the government will perform inspections at substantial completion to ensure full compliance with specifications and the viability of all planted materials.
W2SD Endist New York

POSTED

about 21 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build procurement issued by the Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Folsom, California. The project scope encompasses the removal and disposal of the existing crane, including the abatement of asbestos and other hazardous materials, and the design, fabrication, and installation of a new 30-ton bridge crane and its associated power supply. Additional requirements include performing a rail system survey with optional repairs or replacement, executing commissioning and load tests, and providing operation and maintenance training. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated value between 1 million and 5 million dollars. The period of performance is 600 calendar days from the notice to proceed. Technical requirements are governed by Specifications No. 20-C0942, which detail standards for automation control systems, programmable logic controllers, and electrical components. Award evaluation is based on a technical approach narrative, past performance from the last six years, and price reasonableness. Offerors must provide a 100 percent performance bond and adhere to Davis-Bacon Act wage determinations. Proposals are submitted in three volumes covering business, technical, and pricing details, with a final response deadline of October 8, 2026.
Mp-Regional Office

POSTED

about 21 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
HALEIWA SMALL BOAT HARBOR MAINTENANCE DREDGING AND REVETTED MOLE REPAIR, HALEIWA, OAHU, HAWAII
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers, Honolulu District, is soliciting sealed bids for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Haleiwa, Oahu, Hawaii. This firm-fixed-price construction contract, under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The project is scheduled for completion within 200 to 240 calendar days from the notice to proceed, though specific exclusionary periods for tree cutting and in-water work during coral spawning and full moons in June and July are enforced. Bidders must provide a bid guarantee and are required to submit a comprehensive offer package including SF 1442, the CLIN schedule, and representations and certifications. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. The government provides a 10 percent price evaluation preference for HUBZone small business concerns. Compliance with the Davis-Bacon Act, EM 385-1-1 safety standards, and various ASTM specifications for aggregate and rock testing is mandatory. Bids must be submitted in sealed physical packages to the contracting office at Fort Shafter, Hawaii, as electronic submissions are not permitted.
W2SN Endist Honolulu

POSTED

about 21 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237990
New
Federal
Z--Bradbury Dam Outlet Valve Replacement
Solicitation # 140R2026R0018
Solicitation 140R2026R0018 is a firm-fixed-price construction contract issued by the Bureau of Reclamation for the replacement of two 30-inch fixed-cone valves at the Bradbury Dam Outlet Works in Santa Barbara County, California. The project aims to enhance the operation and efficiency of water releases and includes the removal of existing valves and actuators, electrical design and installation, the provision of a temporary pumping system, and the design of valve supports. The estimated project value ranges from 1 million to 5 million dollars, and the procurement is set aside for total small businesses under NAICS code 237990. The period of performance is 450 days, with a critical milestone requiring the facility to be capable of controlling and releasing water through the new valves by December 15, 2027. Work must commence within seven calendar days of the notice to proceed. Award is based on a Lowest Price Technically Acceptable process, evaluating offerors on their coordinated construction schedule, relevant experience, and past performance. Key contract requirements include the provision of 100 percent performance and payment bonds, adherence to union prevailing wage rates, and strict electronic invoicing through the Invoice Processing Platform. Liquidated damages for delays are set at 2,200 dollars per calendar day.
Mp-Regional Office

POSTED

about 21 hours ago

DEADLINE

in 3 days