Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

NELCO CONSTRUCTION 403 W. DR. MARTIN LUTHER KING JR. BLVD. TAMPA FL 33603 USA

UEI: SLED_EF0B67247310F66A

NELCO CONSTRUCTION 403 W. DR. MARTIN LUTHER KING JR. BLVD. TAMPA FL 33603 USA is a federal contractor, registered under UEI SLED_EF0B67247310F66A. It has been awarded $973,923 in federal contracts. Primary work spans Industrial Building Construction. Top awarding agencies include Ceu MIAMI(00082).

Contact Information

Registration and classification details

Registration

UEI Code

SLED_EF0B67247310F66A

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with NELCO CONSTRUCTION 403 W. DR. MARTIN LUTHER KING JR. BLVD. TAMPA FL 33603 USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for NELCO CONSTRUCTION 403 W. DR. MARTIN LUTHER KING JR. BLVD. TAMPA FL 33603 USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in NELCO CONSTRUCTION 403 W. DR. MARTIN LUTHER KING JR. BLVD. TAMPA FL 33603 USA's top NAICS codes and agencies

NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) vehicle for general construction services at Tinker AFB, Oklahoma. The contract encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Work is categorized into three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC consists of a five-year base period with one five-year option, totaling a ten-year period of performance. The total aggregate maximum contract value is estimated at 950 million dollars, with a minimum guarantee of 500 dollars per awarded contract. The procurement is divided into a Small Business Pool, with a 50 percent set-aside, and a Full and Open Pool. Award is based on the Highest Technically Rated Offeror (HTRO) methodology, focusing solely on technical experience through a self-rated scoring validation process; there is no cost or price evaluation at the IDIQ level. Offerors must meet a Minimum Technical Threshold Rating of 8,190 points for Appendix C and 7,140 points for Appendix D to be eligible. Proposals are due by October 13, 2026, and must be submitted electronically. Contractors are required to maintain CMMC Level 1 certification and adhere to strict base standards, including the TAFB Facility Standard and various safety and environmental regulations.
FA8137 Afsc Pzioc

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236210
New
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
Fermi Forward Discovery Group, LLC is soliciting proposals for a firm-fixed-price subcontract to build an addition and renovate the Central Utility Building (CUB) at the Fermi National Accelerator Laboratory in Batavia, Illinois. The CUB is a critical facility providing chilled, hot, low conductivity, and makeup water to various lab systems. The scope of work includes demolition, building expansion for new chillers, exterior shell and roof renovations, civil utility upgrades, and the installation of fire protection, HVAC, and medium-voltage electrical systems. All work must comply with the 2010 ADA Standards for Accessible Design, the Buy American Act, and the Build America Buy America Act. The project is governed by a critical schedule tied to the Fermilab accelerator shutdown, with an anticipated performance window from January 1, 2028, to January 1, 2030. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, the start of construction on January 3, 2028, and final completion of all CUB work by September 28, 2029. Award will be based on a best-value tradeoff method, where technical factors—including organizational structure, safety compliance, and past performance on projects up to 50 million dollars—are significantly more important than price. Contractors must meet strict pass/fail financial and safety requirements, including a current ratio of 1.20 or greater and an aggregate bonding capacity of at least 100 million dollars. Required bonds include bid, performance, and payment bonds. Labor standards are governed by the Davis-Bacon Act. Proposals must be submitted in two separate volumes: a technical proposal and a business management and price proposal. Invoicing is handled through the FNAL Accounts Payable Office with standard thirty-day payment terms and a 10 percent retention policy.
Fermilab - DOE Contractor

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 236210
New
International
Engineering and Construction Services Production Way Operations Center Renovation
Solicitation # 26-0244
Metro Vancouver is seeking a Design-Builder for the renovation of the Production Way Operations Center through a progressive design-build delivery model. The project is divided into two distinct stages: Phase 1, which focuses on design and pre-construction services including project definition, preliminary and detailed design, and project management; and Phase 2, which covers construction and commissioning. The scope of work includes structural and seismic upgrades to meet building codes, interior renovations for operational use, parking lot paving coordinated with a retaining wall project, and the installation of 26 EV charging stations. The estimated budget for direct construction costs in Phase 2 is 33 million dollars. Eligible proponents include Bird Construction Group, Canadian Turner Construction, Chandos Construction LP, and Ledcor Construction Limited. Proposals are due by December 18, 2026, and will be evaluated based on technical and qualitative factors, such as the qualifications of key individuals and the proposed approach, as well as the Phase 1 fee. The successful contractor will be required to provide performance and labor and materials payment bonds, each valued at 50 percent of the Phase 2 price. All work must adhere to the National Building Code of Canada, WorkSafeBC regulations, and the Corporation's specific engineering and safety standards.
Metro Vancouver

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 236210
New
SLED
E & P Technology Way, Buildings A & B – Use Permits #P22-00307 & #P22-00308The E and P Technology Way project involves the development of two industrial buildings on approximately 20.07 acres within the Napa Valley Business Park in southern unincorporated Napa County, California. Building A is a 143,312-square-foot wine production facility designed for processing, storage, bottling, and accessory office use with an annual capacity of 450,000 gallons. Building B is a 66,915-square-foot warehouse and distribution center with accessory office space. The project includes the construction of truck loading areas, 211 parking spaces with electric vehicle charging, truck trailer parking, and internal circulation improvements. Infrastructure upgrades will include new driveways from Technology Way and Morris Court, as well as new sidewalks, curb and gutter improvements, and pavement upgrades along the project frontages. Managed by the County of Napa as the lead agency with FCS International, Inc. serving as the consulting firm, the project is currently in the environmental review phase. A Notice of Preparation was issued on October 1, 2026, to initiate a Draft Environmental Impact Report, with a public scoping meeting scheduled for October 21, 2026. The site will be supported by water services from the City of American Canyon and wastewater services from the Napa Sanitation District. Environmental and sustainability features include water-efficient landscaping and bioretention stormwater treatment facilities.
Napa County

POSTED

7 days ago

DEADLINE

N/A
View Details