Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

OTAK, INC.

UEI: M2F7G6H73FL3CAGE: 0YDY4

OTAK, INC. is a federal contractor, registered under UEI M2F7G6H73FL3 and CAGE code 0YDY4. It has been awarded $118,771,630 across 606 federal contracts. Primary work spans Architectural Services, Engineering Services, and All Other Professional, Scientific, and Technical Services. Top awarding agencies include Department Of The Interior, Dsc Contracting Services Division, and Department Of Agriculture.

Contact Information

Registration and classification details

Registration

UEI Code

M2F7G6H73FL3

CAGE Code

0YDY4

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

OTAK, INC. specializes in engineering and professional technical services for federal land and resource management agencies, with a strong focus on infrastructure rehabilitation, landscape recovery, and visitor facility modernization. Their core capabilities include preliminary and schematic design,...

OTAK, INC. specializes in engineering and professional technical services for federal land and resource management agencies, with a strong focus on infrastructure rehabilitation, landscape recovery, and visitor facility modernization. Their core capabilities include preliminary and schematic design, geotechnical and topographic surveying, deferred maintenance assessment, and disaster recovery planning for national parks and public lands. The firm delivers comprehensive civil, structural, and environmental engineering solutions tailored to sensitive natural environments, often supporting complex projects such as visitor center rehabilitation, parking infrastructure reconstruction, and hazard mitigation in high-traffic recreational areas. Their technical expertise spans ADA-compliant accessibility upgrades, stormwater management, historic preservation compliance, and integrated landscape restoration techniques, positioning them as a trusted partner for mission-critical infrastructure resilience in protected areas. The contractor maintains a deep, sustained relationship with the Department of the Interior, providing engineering and professional services across its bureaus, including the National Park Service and U.S. Fish and Wildlife Service. Work consistently supports park infrastructure modernization, safety improvements, and visitor experience enhancements, indicating a long-standing role in operational support for federal land management missions. Their engagements reflect a pattern of repeat, mission-aligned contract awards, suggesting established trust and institutional familiarity within Interior’s technical procurement ecosystem. OTAK’s primary industry focus is engineering services (NAICS 541330), complemented by broader professional, scientific, and technical services (541990) such as visitor market research and resource management planning. This dual focus enables end-to-end support—from site assessment and design through stakeholder analysis and implementation—for federal land-use projects. Their market positioning centers on niche, high-compliance environments where engineering solutions must align with environmental regulations, cultural resource protections, and public safety standards. As a small business structured as a 2L entity based in Portland, Oregon, OTAK operates with agility and local regional knowledge, serving federal clients nationwide without formal government certifications. Their geographic proximity to key federal land management hubs enhances responsiveness to field-based project needs.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Department Of The Interior$113.7M95.7%
Dsc Contracting Services Division$2.5M2.1%
Department Of Agriculture$1.0M0.9%
Department Of Defense$697.8K0.6%
Other agencies (9 agencies, <0.5% each)$832.9K0.7%
Awards by NAICS
Export
541310 - Architectural Services$50.7M42.7%
541330 - Engineering Services$41.6M35%
541990 - All Other Professional, Scientific, and Technical Services$23.4M19.7%
541620 - Environmental Consulting Services$1.3M1.1%
- Unknown NAICS$815.1K0.7%
Others - Other NAICS codes (7 codes, <0.5% each)$1.0M0.9%
Awards by Agency Over Time
Awards by Place of Performance

Compete with OTAK, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for OTAK, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in OTAK, INC.'s top NAICS codes and agencies

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 14 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541620
New
SLED
Monroe Area Recharge Project
Solicitation # RFP-2026-0001
The Lower Loup Natural Resources District is seeking a qualified professional engineering consultant for the Monroe Area Recharge Project in southwestern Platte County, Nebraska. The project aims to design and implement a system to divert water from the Loup Power Canal into identified wetlands and drainages to facilitate groundwater recharge and baseflow retiming. The scope of work includes an existing conditions assessment, site identification and prioritization, conceptual and final design, permitting support, and the development of a final hydrologic modeling report and an operations and maintenance plan. All designs must adhere to Federal Energy Regulatory Commission requirements, including specific mandates for minimum flow in bypass reaches, run-of-canal operations, water temperature limits of 93 degrees Fahrenheit, and a maximum diversion of 2,000 cfs between March 1 and June 30. Proposals are due by 5:00 pm on October 2, 2026, and must consist of four hard copies and one digital version delivered to the district office in Ord, Nebraska. Selection will be based on technical qualifications, a proven track record with similar water retiming projects, the proposed approach, and cost effectiveness. Work is scheduled to commence by December 1, 2026, with a timeline to be mutually agreed upon following the award. The contract requires the consultant to be fully insured for general liability and workers compensation. Payment will be processed on a monthly basis, subject to a 10 percent retainage that will be released upon project completion.
Lower Loup Natural Resources District

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details