Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Rice-Kilroy Construction Company Inc.5048 Highway 26 West, P.O. Box 1548 Dubois, Wyoming 82513

UEI: SLED_A8C782DD60683FFC

Rice-Kilroy Construction Company Inc.5048 Highway 26 West, P.O. Box 1548 Dubois, Wyoming 82513 is a federal contractor, registered under UEI SLED_A8C782DD60683FFC. It has been awarded $4,851,904 in federal contracts. Primary work spans Unknown NAICS. Top awarding agencies include Department Of Transportation.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_A8C782DD60683FFC

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Rice-Kilroy Construction Company Inc. has experience providing services to the Department of Transportation.

Key performance metrics

Award counts and award dollars by type, as prime and as subcontractor.

Awards Count

1

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award analytics

Awards by agency, industry, year, award type, size, and place of performance.

Awards by Agency

Department Of Transportation is the largest, at $4.9M, 100.0% of the total.

Awards by NAICS

Unknown NAICS is the largest, at $4.9M, 100.0% of the total.

Awards by Agency Over Time
Awards by Type Over Time
Award Size Distribution
Awards by Place of Performance

Compete with Rice-Kilroy Construction Company Inc.5048 Highway 26 West, P.O. Box 1548 Dubois, Wyoming 82513

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for Rice-Kilroy Construction Company Inc.5048 Highway 26 West, P.O. Box 1548 Dubois, Wyoming 82513

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS

Open opportunities in Rice-Kilroy Construction Company Inc.5048 Highway 26 West, P.O. Box 1548 Dubois, Wyoming 82513's top NAICS codes and agencies

NAICS: 237310
New
Federal
UT NP ARCH 100(2) Bridges on Delicate Arch Road
Solicitation # 6982AF27B000005
The Bridges on Delicate Arch Road project (UT NP ARCH 100(2)) is a construction effort within Arches National Park designed to replace inadequate culverts at Salt Valley Wash, Salt Wash, and Winter Camp Wash with 100-foot span concrete bridges. The project aims to mitigate flooding and sediment deposition that currently create unsafe conditions for visitors and high operational costs. The scope of work includes the design and construction of these bridges, roadway realignment at Salt Valley Wash, and the rehabilitation of roadway sections and parking areas through full depth reclamation and a 4-inch pavement overlay. Key work items include embankment construction, structural concrete, epoxy-coated reinforcing steel, and drilled shafts. This solicitation is a full and open competition with a HUBZone price preference, with an estimated cost range between $10,000,000 and $20,000,000. The project is structured with a base requirement (Schedule A) covering 0.99 miles of roadway and two parking lots, with additional options for further roadway (Option X) and one parking lot (Option Y). The anticipated schedule begins with an award in November 2026 and a notice to proceed in December 2026, with a target completion date of December 2028. Award will be granted to the lowest responsive, responsible bidder. All work must adhere to the FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
6982AF Central Federal Lands Divisi

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 237310
Federal
CO OMAD 300(71) Minuteman Missile Access
Solicitation # 6982AF27B000010
The Office of Missile Air Defense Program (OMAD) is seeking a contractor for the maintenance and improvement of Minuteman Missile Access Roads located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado. The scope of work involves roadway reconditioning, the addition of a four-inch aggregate surface course with a maximum width of 24 feet and a 4% crown, and the replacement of culverts. All work must remain on the existing roadway bench and conform to the FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. The project encompasses approximately 114 miles of road across three schedules and includes deliverables such as construction schedules, drainage structures, and soil erosion and sediment control. This is a Total Small Business Set Aside procurement under NAICS code 237310, with an estimated project value between $5,000,000 and $10,000,000. The contract will be awarded to the lowest responsive and responsible bidder, with the government evaluating schedules in the priority order of Schedule C, then B, and finally A. Requirements include the submission of bid, performance, and payment bonds, as well as resumes for key personnel and on-site managers. The project is subject to the Davis-Bacon Act and the Buy American Act, and payments will be made via monthly progress invoices.
6982AF Central Federal Lands Divisi

POSTED

9 days ago

DEADLINE

in 5 days
View Details
NAICS: 237310
Federal
ND OMAD 2025(1) Minuteman Missile Access Road
Solicitation # 6982AF27B000011
The ND OMAD 2025(1) Minuteman Missile Access Road project, solicitation 6982AF27B000011, is a total small business set-aside managed by the FHWA Central Federal Lands Highway Division. The project focuses on the annual maintenance and improvement of certified gravel roads across six counties in North Dakota, specifically within Bottineau, McHenry, McLean, and Ward counties. The scope of work includes roadway reconditioning, the installation of a four-inch aggregate surface course with a maximum width of 24 feet, drainage improvements, and the replacement of culverts. The project is divided into three schedules (A, B, and C) covering approximately 40.84 to 44.84 miles of road work, with an estimated contract value between $2,000,000 and $5,000,000. Technical requirements are governed by the FP-24 Standard Specifications for Construction of Roads and Bridges. Contractors must adhere to strict grading tolerances, provide a baseline construction schedule, and comply with the Davis-Bacon Act and the Buy American Act. Bidders are required to submit sealed physical bids and provide performance and payment bonds. The government will evaluate the schedules in order of priority, starting with Schedule C, then B, and finally A, based on available funding. Performance must commence within 10 calendar days of the notice to proceed.
6982AF Central Federal Lands Divisi

POSTED

9 days ago

DEADLINE

in 5 days
View Details
NAICS: 237310
Federal
HI FLAP CR562(1) Kilauea Point
Solicitation # 6982AF27B000008
The Kilauea Point Access Improvements project, managed by the Federal Highway Administration Central Federal Lands Highway Division, focuses on enhancing pedestrian and bicycle access at the Kilauea Point National Wildlife Refuge on the island of Kaua'i. The scope of work involves the installation of a sidewalk from the Kuhio Highway intersection to the KPNWR Overlook, covering approximately 1.70 miles, divided into Schedule A (1.47 miles) and Option X (0.24 miles). Key construction activities include pavement rehabilitation, roadway widening with full depth pavement on aggregate base course, the reconstruction of a turnaround, and the installation of two mini-roundabouts, guardrails, curbs, gutters, and pedestrian crossings. The project also includes minor utility adjustments and is governed by the FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects. This firm fixed price solicitation, under NAICS 237310, is open for full and open competition. Award will be granted to the lowest responsible bidder, with a 10 percent price evaluation preference applied to all offers except those from HUBZone small business concerns and other successful small business concerns. Bidders must submit prices for all items in Schedule A and Option X. Performance requirements include a strict schedule for shutdown connections, which are limited to Tuesdays through Thursdays and prohibited during specific holiday windows. The contractor is required to submit a construction schedule within 15 to 45 days of the notice to proceed. All materials must be approved by the engineer prior to the commencement date.
6982AF Central Federal Lands Divisi

POSTED

10 days ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
CO BR UCPO Blue Mesa Road(1) Blue Mesa Road
Solicitation # 6982AF27B000009
The CO BR UCPO Blue Mesa Road project is a pre-solicitation effort by the Department of Transportation's Central Federal Lands Division to rehabilitate a 1.44-mile corridor in Gunnison County, Colorado. This corridor provides critical access to the Bureau of Reclamation Power Plant and Pine Creek Trailhead within the Curecanti National Recreational Area. The project is designated as a total small business set-aside under NAICS code 237310, with an estimated cost range between 2,000,000 and 5,000,000 dollars. The scope of work is divided into three primary components. Schedule A involves the rehabilitation of 0.86 miles of gravel road into asphalt concrete pavement, the reconstruction of 0.24 miles of existing asphalt to raise the roadway profile at the US 50 intersection, and various drainage, signing, and rockfall mitigation improvements. Option X includes the paving of an additional 0.34 miles of gravel road from the BOR gate to the power plant, along with conduit installation for a future automatic gate. Option Y focuses specifically on the installation of 2,215 linear feet of 6-inch HDPE electric conduit and associated utility trenching to provide power to the security gate. The anticipated project timeline begins with advertisement in November 2026, followed by an award in January 2027 and a notice to proceed in April 2027. Construction is scheduled to take place from May 2027 through October 2027. A non-mandatory pre-bid site visit is scheduled for November 4, 2026.
6982AF Central Federal Lands Divisi

POSTED

21 days ago

DEADLINE

N/A
View Details