Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

SC SOLUTIONS, INC.

UEI: MGPZGMNLJ8R9CAGE: 1DCK3

SC SOLUTIONS, INC. is a federal contractor, registered under UEI MGPZGMNLJ8R9 and CAGE code 1DCK3. It has been awarded $11,248,826 in federal contracts. Primary work spans Unknown NAICS, Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology), and Engineering Services. Top awarding agencies include Department Of Defense, Department Of Energy, and National Science Foundation.

Contact Information

Registration and classification details

Registration

UEI Code

MGPZGMNLJ8R9

CAGE Code

1DCK3

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit Organization

NAICS Codes

541330Engineering Services(Primary)
541511Custom Computer Programming Services
541512Computer Systems Design Services
541519Other Computer Related Services

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

SC SOLUTIONS, INC. specializes in advanced engineering services focused on geophysical modeling and seismic simulation, particularly in the development and application of non-ergodic ground motion models and three-dimensional seismic simulations. Their technical expertise centers on high-fidelity co...

SC SOLUTIONS, INC. specializes in advanced engineering services focused on geophysical modeling and seismic simulation, particularly in the development and application of non-ergodic ground motion models and three-dimensional seismic simulations. Their technical expertise centers on high-fidelity computational modeling of earthquake dynamics, incorporating site-specific geological data to enhance predictive accuracy for seismic hazard assessment. This work supports critical infrastructure resilience planning and risk-informed design, leveraging numerical methods, wave propagation algorithms, and geospatial data integration to deliver scientifically rigorous outputs for government stakeholders. The firm’s differentiation lies in its precision-driven approach to non-ergodic systems, which account for spatial variability in seismic sources and propagation paths—offering a more nuanced alternative to traditional ergodic models used in national seismic hazard maps. The contractor has demonstrated direct engagement with the Department of the Interior, providing specialized engineering support for seismic modeling initiatives that inform land management, resource protection, and infrastructure safety decisions on federal lands. This relationship suggests a focused partnership in applying advanced geotechnical analysis to natural hazard mitigation within public land stewardship programs. SC SOLUTIONS, INC. operates primarily within NAICS 541330, which encompasses engineering services requiring deep technical specialization in physical modeling and computational analysis. Their market positioning is niche but critical, serving federal agencies that require scientifically validated seismic risk assessments beyond standard industry practices. They are not a generalist engineering firm but a technical specialist in high-complexity geophysical simulation. As a small business structured as a 2L entity based in Sunnyvale, California, SC SOLUTIONS, INC. maintains a focused, expertise-driven presence in the federal technical services market. While no formal government certifications are listed, their work reflects adherence to rigorous scientific and engineering standards required for federal geospatial and hazard modeling contracts.

Key Performance Metrics

Awards Count

33

All time

Active

2

Currently performing

Completed

31

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Export
Awards by Agency Over Time
Awards by Place of Performance

Compete with SC SOLUTIONS, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for SC SOLUTIONS, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in SC SOLUTIONS, INC.'s top NAICS codes and agencies

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
SLED
CITY OF ALAMO FY27 CDBG SEWERAGE
Solicitation # PE-66394-NONST-2027-000000011
The City of Alamo is soliciting statements of qualifications and proposals from engineering firms licensed in the State of Georgia to provide professional services for the improvement of the city's sewerage system. The scope of work involves providing preliminary design services for a potential FY27 Community Development Block Grant (CDBG) project, with the requirement that a draft Preliminary Engineering Report be submitted by January 15, 2027. If funding is secured, the selected firm will also be responsible for the subsequent design and construction management services. Proposals are due by November 30, 2026, and must include the firm's history, CDBG/EIP/RDF experience, key personnel qualifications, current workload, proposed scope of service, references, and associated fees or percentages. Evaluation of respondents is based on a point system assessing the firm's ability to provide necessary disciplines, experience with similar projects, quality of references, and price competitiveness. Additionally, firms must confirm they possess Errors and Omissions insurance and can meet the PER deadline. All contracts are subject to the provisions of the Georgia Department of Community Affairs and must comply with various federal and state laws regarding HUD Assisted Projects, including the Build America, Buy America Act, the Americans with Disabilities Act, and the Civil Rights Act of 1964. The primary point of contact for this solicitation is Bethany Newby.
City of Alamo

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details