Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

THOMAS J. GERARD & ASSOCIATES, INC

UEI: RESJKKNCXLY3

THOMAS J. GERARD & ASSOCIATES, INC is a federal contractor, registered under UEI RESJKKNCXLY3. It has been awarded $135,604 in federal contracts. Primary work spans Unknown NAICS, Remediation Services, and Architectural Services. Top awarding agencies include Department Of Agriculture and Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

RESJKKNCXLY3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

5

All time

Active

0

Currently performing

Completed

5

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with THOMAS J. GERARD & ASSOCIATES, INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for THOMAS J. GERARD & ASSOCIATES, INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in THOMAS J. GERARD & ASSOCIATES, INC's top NAICS codes and agencies

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 10 days
View Details
NAICS: 541310
New
SLED
Architectural And Engineering (A&E) Services For A Recreation Center Lighting Upgrade
Solicitation # 26-085-RFP
The City of West Sacramento is soliciting proposals for architectural and engineering design services to modernize the lighting and controls in Buildings KA and KB of its recreation center. This project, identified as CIP-60021, focuses on upgrading infrastructure to meet current energy standards, specifically Title 24, and improving overall aesthetics. The scope of work includes surveying existing conditions, designing LED fixture replacements with occupancy sensing and daylight dimming, and producing a permitted, biddable set of construction documents. The selected consultant will be responsible for managing the Division of the State Architect review process across structural safety, fire and life safety, and access compliance, as well as providing construction-phase administration through project certification. Proposals must be submitted via the City's e-Procurement Portal by December 11, 2026. The evaluation process is qualifications-based, prioritizing the best combination of attributes over the lowest price. Awarded contractors must comply with California Labor Code section 1720 regarding prevailing wages and adhere to strict insurance requirements, including Commercial General Liability and Professional Liability coverage. The project is subject to federal award requirements, including mandatory non-discrimination clauses and SAM.GOV verification for debarment. Deliverables are structured across four phases: assessment and basis of design, construction documents, permitting and DSA coordination, and bid support.
Capital Projects - Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541310
New
SLED
Public Library Facilities Master Plan
Solicitation # 27-277
Frederick County, Maryland, is soliciting proposals from qualified consultants to develop a comprehensive Public Library Facilities Master Plan with an estimated maximum contract value of 120,000 US Dollars. The selected contractor will conduct demographic research, community growth projections, and service analysis to identify emerging needs and recommend strategies for optimizing existing and planned library spaces. The scope of work includes evaluating population projections over a 20-year horizon, assessing the ability of facilities to support services such as digital literacy and workforce development, and analyzing alternatives for deficient facilities, ranging from renovation to new construction. The procurement follows a best value process, evaluating technical proposals and price proposals separately. Technical submissions must include a detailed work proposal, a completion schedule, and references from similar projects completed within the last five years. Awardees must maintain active System for Award Management registration and comply with various federal and state regulations, including the 1964 Civil Rights Act and FERPA. The contract includes an initial term with the possibility of one-year renewal increments at the County's discretion. Invoices must be submitted in duplicate to the Frederick County Public Libraries, and all work remains at the contractor's risk until written acceptance by the County.
Frederick County Public Libraries

POSTED

about 19 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

about 23 hours ago

DEADLINE

in 4 days
View Details