Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WILLIS, J., CO.

UEI: XM3LWFA14Q61

WILLIS, J., CO. is a federal contractor, registered under UEI XM3LWFA14Q61. It has been awarded $7,260 in federal contracts. Primary work spans Commercial and Institutional Building Construction. Top awarding agencies include National Archives And Records Administration.

Contact Information

Registration and classification details

Registration

UEI Code

XM3LWFA14Q61

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WILLIS, J., CO.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WILLIS, J., CO.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WILLIS, J., CO.'s top NAICS codes and agencies

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project, estimated between 1 million and 5 million dollars, involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. All work must comply with JBLM Department of Public Works requirements and various technical standards, including NFPA 13 for fire protection and IBC 2021 for structural design. The contract is a Firm Fixed Price task order to be awarded based on a balanced evaluation of technical capability and price. Technical evaluations will focus on the proposed project schedule, which must show completion within 360 to 365 calendar days of the Notice to Proceed, and the qualifications of key personnel. Performance requires adherence to Davis-Bacon prevailing wage rates for Pierce County and strict quality control standards, including USACE validation of testing laboratories. Awarded contractors must provide payment and performance bonds for projects exceeding 150,000 dollars and submit all invoicing via Wide Area Workflow. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 16, 2026, with a response deadline of November 4, 2026. The primary point of contact for this effort is Richie Tran. To ensure project financing and bid responsiveness, contractors must strictly adhere to comprehensive Good Faith Effort (GFE) requirements. Mandatory requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening, as well as providing proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the bid closing, failure to include proof of publicity and agency assistance within the initial bid package will result in the proposal being deemed non-responsive. The project area for subcontracting opportunities is designated as Riverside or Los Angeles.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. Managed by C. Overaa & Co., the project has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant's operation and regulatory compliance throughout the first two phases of construction. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on participation from small and disadvantaged businesses, including DBE, DVBE, WOSB, and SDVOSB entities. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Bidders must attend a mandatory pre-bid meeting on October 5, 2026, and submit bids by the deadline, noted as November 10, 2026. Subcontractors are required to accept the Overaa standard agreement without modification, provide a 100 percent performance and labor bond if requested, and utilize the Textura electronic system for invoicing and payments.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation, issued by J & J Contractors, Inc., seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The contract encompasses a wide range of trades, including demolition of 18 existing magazines and two buildings, structural steel, concrete, masonry, roofing, and full MEP and fire protection systems. Additional site improvements involve the installation of access roads, paved loading areas, landscaping, and a complete electrical utility infrastructure featuring primary and secondary distribution and telecommunications. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 9 hours ago

DEADLINE

in 14 days
View Details
NAICS: 236220
New
International
Stotfold Cemetery - Toilet and Storage
Solicitation # STC003
Stotfold Town Council is seeking experienced contractors for the renovation of the Cemetery Toilet Block, a project with an estimated budget of 190,000 to 210,000 GBP including VAT. The scope of work involves addressing structural defects identified in a building condition survey, creating two unisex WCs with one being DDA compliant, and installing a DDA compliant access path. Additionally, the project requires the installation of solar panels, a battery, and trace heating. Because the facility is a non-designated heritage asset, the contractor must use appropriate lime mortar and matching bricks for all masonry work. The successful bidder will serve as the Principal Designer and Principal Contractor, managing the necessary planning applications and building regulations submissions. The project involves significant environmental and safety considerations, including the management of asbestos-containing materials and the protection of bat roosts, as identified in ecological and asbestos surveys. Tenders must be submitted by November 2, 2026, and will be evaluated based on price, experience, methodology, submission quality, and the proposed programme. Mandatory requirements for award include evidence of public liability insurance of at least 10 million GBP, proof of asbestos handling competence, and confirmation of a site visit. The anticipated period of performance is from January 1, 2027, to December 31, 2027, with a 10 percent retention held for 12 months following completion and a 10-year guarantee against structural defects.
Stotfold Town Council

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details