Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

03-4J550 Truckee Wash Rack Sewer Connection

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation (Caltrans), District 3, is undertaking a project at the Truckee Maintenance Station in Nevada County to connect the existing wash rack to the municipal sewer system, ensuring compliance with environmental regulations. The scope includes constructing a trench drain to capture wash water, installing an electrical three-way diversion valve to route discharge appropriately, and integrating a certified sand-oil separator to treat wash water before it enters the sewer system. During vehicle washing operations, the valve directs water to the separator and then to the sewer; when not in use, it diverts stormwater to the storm drain to prevent contamination. A sampling port will be added to allow staff to monitor water quality entering the sewer. The project is governed by the California Environmental Quality Act (CEQA), with a Negative Declaration approved and the required environmental filing fee of $2,968.75 paid. All work is to be performed on-site at the Truckee Maintenance Station, and acceptance is managed by Caltrans as the lead agency under state regulatory protocols. There is no formal contract value, line-item pricing, or detailed performance schedule publicly available, as the available documentation reflects a pre-award forecast with administrative and environmental compliance details rather than a finalized procurement. No contract clauses, special requirements, or evaluation factors have been issued, and no federal acquisition regulation provisions are referenced. The project relies on state-level environmental approvals, including a Notice of Determination filed with the Office of Planning and Research, and submission of supporting documents such as a cash receipt and CDFW No Effect Determination. Payments for fees are directed to the California Department of Fish and Wildlife, while all project inquiries should be directed to Caltrans Environmental Scientist Tracy Robinson. The work must comply with CEQA mitigation measures and local sewer authority standards, though no specific technical specifications, inspection criteria, or packaging requirements are detailed beyond environmental compliance obligations. The procurement remains in a forecast stage without solicitation numbers, contract type, or award methodology defined.

General Info

Caltrans to connect wash rack to sewer with separator and diversion valve for CEQA-compliant environmental compliance.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Keiser Avenue, CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for Truckee Wash Rack Sewer Connection

PDFnotice-of-determination

2025 Environmental Document Filing Fee Cash Receipt - Truckee Wash Rack Sewer Connection

PDFreceipt

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Tracy RobinsonEnvironmental Scientist

Full Description

Show more
The California Department of Transportation (Caltrans) proposes a maintenance project at the Truckee Maintenance Station (MS) in Nevada County. The project proposes to connect the existing wash rack to the municipal sewer system. The scope of work includes creating a trench drain to collect wash water and installing an electrical diversion valve and a sand-oil separator. The three way valve would be installed at the outlet of the trench drain and would determine whether the discharge from the wash rack goes to the storm drain or the sand-oil separator. When the wash rack is in use for a vehicle wash, the valve would divert the wash water to the sand-oil separator and then to the sewer system. When the wash rack is not in use, the valve would direct stormwater to the storm drain. Additionally, a sampling port would be installed so maintenance staff can collect samples of the wash water entering the sewer system.

Similar Contracts

Same NAICS industry code