Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

0H240 HUM 254 Culvert Rehab Project Initial Study Negative Declaration

Forecast
EPIMS-HUM-62196-R1CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 1, is executing a project to rehabilitate drainage systems and improve fish passage along State Route 254 in Humboldt County, specifically from Redcrest to Phillipsville between Post Miles 0.0 and 43.0 within the Humboldt Redwoods State Park. This effort involves the replacement of culverts at 43 locations, with 32 of those sites situated within riparian habitats or protected waters. A primary objective of the work is the remediation of a fish passage barrier located at Post Mile 8.13 to benefit tributaries of the South Fork Eel River, including Chadd and Mowry Creeks. The project is authorized under Lake and Streambed Alteration Agreements EPIMS-HUM-62193-R1C and EPIMS-HUM-62196-R1C, pursuant to Fish and Game Code section 1602. The California Department of Fish and Wildlife, acting as a Responsible Agency, issued Notices of Determination on June 5, 2026, concluding that the project would not have a significant environmental effect within its jurisdiction based on a Negative Declaration. While specific mitigation measures have been imposed to protect the environment, no formal Mitigation Reporting or Monitoring Plan or Statement of Overriding Considerations was adopted.

General Info

Caltrans District 1 will rehabilitate drainage and improve fish passage on State Route 254.

Place of Performance

Post Mile 15.04, Post Mile 40.81, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Michael van HattemEnvironmental Scientist
Morgan KipfEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-HUM-62193-R1C), pursuant to Fish and Game Code section 1602, the project Applicant is the California Department of Transportation. This Agreement authorizes the California Department of Transportation’s project is to rehabilitate existing drainage systems and improve fish passage for two tributaries to the South Fork Eel River.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237310
New
SLED
Bridge Front Upgrade Project (Re-Bid)
Solicitation # ITB27-6310-01B
The City of Lauderdale Lakes is soliciting bids for the Bridge Front Upgrade Project (ITB27-6310-01B) through its Public Works Administration. The scope of work involves the installation of decorative walls and pavers, swale regrading, minor drainage modifications, curb and pavement restoration, and signing and marking. All work must adhere to applicable building codes, City standards for dust nuisance abatement, and ADA guidelines for detectable warnings. Bids must be submitted via the City's eProcurement portal by December 9, 2026, at 3:00 PM. Qualified firms must demonstrate a track record of completing at least two similar projects in Florida and provide necessary licensing, certificates of competency, and a federal tax ID. Required submission documents include a bid bond, certificates and affidavits for bonds, and forms for subcontractors and principal materials manufacturers. The City evaluates respondents based on the licensing of supervising personnel, owned equipment, and confirmation of a drug-free workplace. The contract includes strict compliance requirements, including the Florida Trench Safety Act, E-Verify for employment eligibility, and certifications regarding scrutinized companies and foreign concerns. The successful contractor must provide performance and payment bonds in accordance with Florida Statutes and maintain all required insurance, submitting renewals 30 days prior to expiration. Payments are processed through the City's Accounts Payable Department within 30 days of invoice receipt, with a 15-day window for the City to notify the contractor of any disputed amounts.
Public Works Administration

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Caltrans, District 1 - Eureka

Same awarding agency

NAICS: 237310
SLED
Wilson Creek Restoration and SPGA Wall ProjectThe Wilson Creek Restoration and SPGA Wall Project, managed by Caltrans District 1, focuses on restoring US Highway 101 in Del Norte County to pre-storm conditions between post miles 12.6 and 13.2. The primary scope of work involves stabilizing the roadway through a modified alignment and the construction of two significant retaining walls: a 695-foot-long by 55-foot-high soldier pile ground anchor wall on the western shoulder and a 595-foot-long by 19-foot-high soil nail wall on the eastern shoulder. Additional technical requirements include the excavation of approximately 44,000 cubic yards of roadway, drainage replacement and realignment, the installation of rumble strips, and the application of Hot Mix Asphalt Type A over a Class 2 Aggregate Base. The final infrastructure will feature a 4-foot-wide median, an 8-foot-wide southbound shoulder, and a 10-foot-wide northbound shoulder, with aesthetic treatments such as tribal patterns applied to guardrails and walls. From a regulatory and environmental standpoint, the project has been issued a Negative Declaration under CEQA, determining that it will not have a significant effect on the environment. Key compliance measures include adhering to a Stormwater Pollution Prevention Plan, following Caltrans Temporary Pedestrian Access Routes Handbook guidelines, and implementing a Revegetation Plan. Strict biological constraints are in place to protect migratory birds, limiting vegetation removal to the period between September 16 and January 31, or requiring qualified biologist surveys if work occurs during breeding seasons. The project is also subject to Title VI non-discrimination policies and requires all equipment to be inspected for invasive species in accordance with Executive Order 13112. Terra McAuliffe serves as the primary lead agency contact for the project.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS