Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

10-1U080-Merced SR-33 Pavement Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 10 – Stockton, is undertaking a pavement rehabilitation project on State Route 33 in Merced County, California, between 0.75 miles north of the SR-33 and Interstate 5 separation and the SR-140 and Sullivan Road intersection. The work includes a 0.15-foot mill and fill overlay, spot digouts up to 0.25 feet in depth to address subgrade failures, and the installation of crash barriers on the southbound SR-33 at Post Mile 21.47 and 23.35. All activities are confined within the Caltrans right-of-way and are intended to repair degraded pavement sections, halt further deterioration, and extend the functional lifespan of the highway. The project is identified by EA number 10-1U080 and is classified as a forecasted procurement with no established contract value or formal solicitation number. Environmental compliance is governed by Caltrans Standard Special Provisions, including requirements for lead-contaminated soil management, which mandates onsite containment and prohibits offsite disposal, and biological protections tied to the migratory bird nesting season from February 1 to September 30, with mandatory pre-construction surveys and buffer zones ranging from 100 to 600 feet depending on species. Cultural resource protocols require immediate work stoppage if artifacts or human remains are encountered, with notification of the County Coroner and the Native American Heritage Commission, and no movement of materials until authorized. A Certified Industrial Hygienist must prepare a Lead Compliance Plan, and all work must adhere to CEQA categorical exemption 14 CCR 15301 and NEPA 23 CFR 771.117. No formal contract type, pricing data, or evaluation factors are provided; the primary contact for environmental coordination is Ishnav Guleria, Associate Environmental Planner, reachable at 209-986-1231. Payment systems, accounting codes, invoicing methods, and designated contracting officers or technical representatives are not specified in the documentation.

General Info

Caltrans rehabilitating SR-33 pavement with mill-and-fill, crash barriers, and strict environmental and cultural compliance.

Agency

California → Caltrans, District 10 - Stockton

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

10-1U080 CEQA NEPA Categorical Exclusion Determination Form

PDFcategorical-exclusion-form

Caltrans Merced SR-33 Pavement Rehabilitation Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 10 - Stockton
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 10 - Stockton
Office AddressN/A
Contacts
Ishnav GuleriaAssociate Environmental Planner (Generalist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes a maintenance project in Merced County near Santa Nella from 0.75 north of the State Route (SR) 33 and Interstate 5 separation to the intersection of SR 140 and Sullivan Road. The project consists of 0.15’ Mill and Fill. Prior to the overlay placement there will also be spot location digouts with a maximum depth of 0.25’. Crash Barriers will be installed on the southbound SR 33 in front of the bridge railing at Post Mile (PM) 21.47 and PM 23.35. All work will be done within the Caltrans Right of Way. The purpose of the project is to repair areas of failing or damaged pavement and facilities. The project is needed to prevent further deterioration of the paved highway surface and extend the service life of SR 33.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details