Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on July 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

100712 - Scoggins Valley Road MP 3.7 Slide Stabilization

Closed
2024.101-ITBState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 561730
New
MJCC LAND MAINTENANCE RFQ
Solicitation # mjcc-land-maintenance-rfq
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes for comprehensive ground maintenance services at its campus in Greenville, Kentucky. The scope of work covers approximately 50 acres and 35 or more buildings, requiring mowing to a height of 3 to 4 inches, string trimming, edging, and general cleanup. The contract is for an initial one-year term with four optional one-year renewals. The award will be granted to a responsible offeror whose quote is technically acceptable and represents the lowest price. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. To be considered technically acceptable, offerors must be registered in the State of Kentucky and verified through the SAM portal. Required submission documents include a technical and price proposal, a staffing plan, a safety program, proof of insurance, a description of available equipment, and three references for similar contracts. The contract mandates strict adherence to the Davis-Bacon Act and Contractor Wage Rate Requirements, specifically Wage Determination Number KY20210041. Consequently, contractors must submit weekly certified payroll and a signed Statement of Compliance with every invoice to receive payment. All work is subject to inspection by the Center, and any identified deficiencies must be corrected within 48 hours at no additional cost. Quotes are due by October 30, 2026.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 6 hours ago

DEADLINE

in about 20 hours

AI Contract Overview

Show more

The contract for the 100712 - Scoggins Valley Road MP 3.7 Slide Stabilization project involves comprehensive roadway reconstruction and stabilization activities in Washington County, Oregon. The scope includes reconstructing the roadway, installing guardrails, excavating and stabilizing failing embankments, and constructing various drainage systems such as stormwater pipes, catch basins, and subsurface drains. Additionally, the project entails building a stone embankment, installing MSE granular backfill with geogrid, and performing asphalt paving with aggregate base, along with revegetation and storm drainage replacement. The work emphasizes open excavation techniques and requires careful traffic and environmental management, including erosion control and protection of local wildlife and waterways. All construction activities, except seed establishment, are expected to be completed by November 30, 2024, with no full road closures permitted during the project. The solicitation, posted on July 29, 2024, with a response deadline of August 14, 2024, is open to qualified contractors under the NAICS code 561730. The project is estimated to cost between $500,000 and $1,500,000. The primary point of contact is Kiersten Vanderhoof, reachable via email or phone, and the project details can be accessed through the provided online portal. This contract aims to enhance roadway stability and safety while adhering to environmental and safety standards throughout the construction process.

General Info

Place of Performance

OR, USA

Set-Aside

NONE

Documents

8

Construction General Terms and Conditions

PDF, High priority: read this first31 pages · contract-document
High

ITB 2024.101 - Scoggins Valley Road MP 3.7 Slide Stabilization

PDF, High priority: read this firstitb
High

ITB 2024.101 - Scoggins Valley Road MP 3.7 Slide Stabilization Project

PDF, High priority: read this firstitb
High

ITB 2024.101 - Scoggins Valley Road MP 3.7 Slide Stabilization Project

PDF, High priority: read this firstitb
High

Scoggins Valley Road MP3.7 Slide Stabilization Plans

PDF, High priority: read this firstspecifications
High

Scoggins Valley Slide Repair - Signature Page

PDF, High priority: read this firstrfb
High

Washington County Construction Agreement

PDF, High priority: read this first3 pages · contract-document
High

Washington County Insurance Requirements Summary Form 2022

PDF, High priority: read this first3 pages · insurance-requirements
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → LUT
Contacts1 person available
OfficeN/A
Organization / AgencyOregon → LUT
Office AddressN/A
Contacts

Full Description

Show more
The project name is: 100712 - Scoggins Valley Road MP 3.7 Slide Stabilization.This project consists of reconstructing the roadway, guardrail, excavating failing embankment, constructing MSE granular backfill with geogrid, subsurface drain, stone embankment, and adding and replacing existing storm drainage on Scoggins Valley Road in Washington County. This project will utilize open excavation techniques for removal and installation.  Associated activities include traffic control, protection of fish, wildlife, plants, and waterways, earthwork, ACP paving, and revegetation.Full road closures will not be allowed on this project. All work except for seed establishment is to be complete by November 30, 2024.The work to be done under this contract consists of the following in Washington County, Oregon:  Install, maintain, and remove temporary traffic control and erosion control measures.  Perform all removal of storm drainage, structures, and obstructions.  Install 12” stormwater pipes and catch basins.  Install drainage curb and subsurface drain line.  Construct stone embankment.  Construct MSE granular backfill with geogrid.  Construct roadway improvements including aggregate base and ACP asphalt.  Install weatherized guardrail.  Install permanent striping.  Perform additional and Incidental Work as called for by the Specifications and Plans.

More opportunities from Oregon → LUT

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS