115 Hawthorne Drive – Murderer’s Creek Bank Stabilization Project (Notification of Lake or Streambed Alteration, No. EPIMS-CCA-55135-R3)

Forecast
EPIMS-CCA-55135-R3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-CCA-55135-R3 with Richard Davies for the Murderer's Creek Bank Stabilization Project located at 115 Hawthorne Drive in Pleasant Hill, Contra Costa County. Pursuant to Section 1602 of the Fish and Game Code, the project is authorized to replace three deteriorating wooden retaining walls and install a new stormwater outlet. The scope of work includes limited vegetation removal and grading, the installation of new wooden walls with waterproof membranes and gravel back drains, the use of cofferdam water diversions, and the placement of boulder revetments. Following construction, the affected areas will be revegetated. Project activities are constrained to ensure minimal environmental impact, with materials moved primarily by hand, wheelbarrows, or a small skidsteer, and a bucket excavator with an articulated thumb used specifically for boulder placement. No trees will be removed during the process. The project is classified as a forecast under NAICS code 237990 and has been granted statutory and categorical exemptions under California Code of Regulations title 14, sections 15302 and 15303, as it replaces existing structures with the same purpose and capacity. Environmental oversight is managed by the Fish and Wildlife Region 3 Bay Delta office in Fairfield.

General Info

Richard Davies to stabilize Murderer’s Creek banks with new wooden walls and stormwater outfall under state environmental permit.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-CCA-55135-R3, pursuant to Section 1602 of the Fish and Game Code to Richard Davies. The proposed project is limited to the replacement of three deteriorating wooden retaining walls and the installation of a new stormwater outlet at the Project Location mentioned above. Project activities will be limited to vegetation removal and grading within the work area; the removal of the existing retaining walls; the installation of new wooden retaining walls, including new lateral and vertical supports, waterproof membranes, and gravel back drains; installation and removal of cofferdam water diversions; installation of boulder revetments and a new stormwater outfall; and the revegetation of the retaining wall areas and areas disturbed by construction. The majority of project materials will be moved by hand, with wheelbarrows, or with a small skidsteer, and a bucket excavator with an articulated thumb will be used to place boulders within the storm drain outfall zone. No trees will be removed during project activities.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 21 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS