Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

117th Alert Pad Crack Repair

Active
W50S6M26Q1BX8Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alabama Air National Guard's 117th Air Refueling Wing in Birmingham is conducting a Sources Sought Notice to gather market research information for a potential contract involving pavement repair on the Alert Pad apron. The scope includes repairing approximately 300 linear feet of concrete cracking and removing and replacing 5,000 linear feet of existing expansion joints in the apron. The required work involves precise cutting, cleaning, sealing of cracks with FAA-approved, fuel-resistant sealants, as well as removing and replacing deteriorated joint materials and ensuring the finished pavement meets FAA specifications and can withstand aircraft operations. This notice is intended to identify qualified small businesses capable of performing this work and is not a request for quotations or proposals, nor should pricing information be provided at this stage. Interested companies are asked to submit their basic company information, including name, CAGE code or Unique Entity Identification, contact details, and a capability statement or relevant work history demonstrating proficiency in similar pavement repair tasks. The response deadline is June 22, 2026, with the opportunity restricted to small businesses under a total small business set-aside. The engagement will be performed in Birmingham, Alabama, under NAICS code 236220. The primary points of contact for further information are William K. Hall and Joshua Waters, both affiliated with the Department of Defense office overseeing this acquisition.

General Info

Alabama Air National Guard seeks small businesses for concrete and joint repair, Birmingham, deadline June 22, 2026.

Agency

Department Of Defense → W7MT Uspfo Activity Alang 117

NAICS

236220 - Commercial and Institutional Building Construction View NAICS

Place of Performance

Birmingham, AL, 35217, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MT Uspfo Activity Alang 117
Contacts2 people available
OfficeBIRMINGHAM, AL, 35217-3595, USA
Organization / Agency
Department Of Defense → W7MT Uspfo Activity Alang 117
Office AddressBIRMINGHAM, AL, 35217-3595, USA

Full Description

Show more

This notice is not a request for quote or proposals. Please do not provide pricing data in response to this notice.


This is a Sources Sought Notice. It is posted for the purpose of gathering market research information, responses to which will be used to assist the Government in forming its approach to the potential acquisition.


The Alabama Air National Guard, the 117th Air Refueling Wing in Birmgingham, is looking for information on interested sources for the requirement described later in this notice.


Please furnish the following information:


  1. Company name.
  2. CAGE code or Unique Entity Identification
  3. Contact information (names, email addresses, phone, website, etc...)
  4. Capability statement or work history demonstrating proficiency in the type of work described.

This is a draft description of the potential work. Details of the requirement are subject to change:


Repair of approximately 300 linear feet of concrete cracking at the “Alert Pad” apron pavement. Removal and replacement of 5,000 linear feet of existing apron expansion joint.


• Identify and mark all cracks designated for repair.
• Clean the cracks using a handheld cutting saw—making precise cuts that follow the crack line and avoid unnecessary cutting—then route, blow out with compressed air, and vacuum to remove debris, vegetation, and loose material. Ensure cracks are dry and free of contaminants prior to sealing.
• Fill cracks with a PCC compatible, FAA approved sealant suitable for aircraft pavement loading and fuel resistant environments.
• Tool or level sealant to achieve a smooth, flush finish with adjacent pavement.
• Allow proper curing time before reopening the area to aircraft traffic.
• Saw cut and remove existing joint filler, sealant, and any deteriorated concrete along joint edges.
• Clean and prepare joint surfaces to ensure proper adhesion.
• Install new joint filler material meeting FAA specifications (e.g., Dow Corning 890 SL Self Leveling Silicone Joint Sealant).
• Apply a fuel resistant, FAA approved joint sealant.
• Ensure joint width, depth, and profile meet design requirements.
• Finish joints flush with surrounding pavement and verify proper movement capability.


This is not a request for quote or proposals. Please do not submit pricing data in response to this notice.

Similar Contracts

NAICS: 236220
New
SLED
Swinerton Invitation for Prequalification of Qualified Subcontractors and Suppliers: Lockers, Signage, Final CleanSwinerton is inviting qualified subcontractors and suppliers to prequalify for a collaborative design-build project at the California State University Bakersfield campus. The project involves the design and construction of a new 56,500 gross square feet Energy and Innovation Building, which will feature offices, research and teaching laboratories, a capstone design lab, an event space with flexible design, and outdoor engagement areas. This public works project is subject to prevailing wage requirements and includes specific trade bid packages such as signage, final cleaning, and solid phenolic core lockers. There is a required Disabled Veteran Business Enterprise (DVBE) participation goal of 6%. Interested subcontractors must submit completed prequalification forms by July 2, 2026, with trade bid packages expected to be posted on June 12, 2026. Construction is anticipated to start on January 1, 2026, and is scheduled for completion by June 16, 2027. Required submittals include the Swinerton Builders Prequalification form and the Master Service Agreement. For further information or to prequalify, subcontractors are directed to contact the Swinerton Prequalification Team via the provided email. Relevant documents and updates can be accessed through Swinerton’s subcontractor prequalification portal.
CSU, Bakersfield

POSTED

about 23 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
SLED
Lake Mountain School District Design-Build Services Centralized District Operations & Institutional FacilityThis contract involves awarding a single Design-Build team a turnkey project to provide comprehensive services including civil engineering, architectural and structural design, utility extension, permitting, procurement, and full construction for a new approximately 25,000 square foot pre-engineered steel institutional facility. The facility will be located on a seven-acre site owned by the Lake Mountain School District in Utah County and is intended to consolidate the district's centralized operations, administrative functions, public assembly spaces, technical departments, and specialized student services into one integrated campus. The successful offeror will hold single-point responsibility for all design and construction phases, ensuring coordination and completion under one contract. The procurement is managed by Alpine School District's Department of Purchasing on behalf of Lake Mountain School District, with the solicitation number LMSD06292026. Proposals must be submitted by 4:00 PM Mountain Time on June 29, 2026. The contract duration is project-based, with construction expected to begin on October 15, 2026, and substantial completion targeted for June 2027. The selection will be made based on the highest score that meets the procurement code criteria, emphasizing responsiveness and responsibility of the proposing Design-Build teams.
Utah

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details