Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

1666 North Vermont Ave (ENV-2024-359-CE)

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Los Angeles

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Vermont Ave & Prospect Ave, Los Angeles, CA, 90027

Set-Aside

NONE

Documents

(2)

1666 N. Vermont Avenue Project Class 32 Categorical Exemption April 2024

PDFjustification-and-authorization

ENV-2024-359-CE-1A Notice of Exemption for 1666 North Vermont Avenue

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Yamillet BrizuelaCity Planning Associate

Full Description

Show more
The Project Site occupies 28,006 square feet of lot area (0.64 acres) with approximately 1,412 square feet of street vacation area, resulting in 29,418 square feet of gross lot area (0.68 acres) and is currently developed with two commercial structures and a surface parking lot. The Proposed Project includes demolition of the existing two commercial structures and site clearing of the surface parking lot for the construction, use, and maintenance of an 86-foot-tall, seven-story mixed-use residential and commercial building with a total of 139 residential dwelling units and up to 20,240 square feet of ground-floor commercial space (“Proposed Project”). The Proposed Project would include 59 studio units, 61 one-bedroom units, and 19 two-bedroom units, 12 percent (17 units) of which would be reserved as On-Site Restricted Affordable Units: 16 units would be reserved at the Extremely Low Income level and one unit would be reserved at the Moderate Income level. The Proposed Project has a total combined floor area of 126,770 square feet, consisting of 106,530 square feet of residential floor area and 20,240 square feet of ground-floor commercial space, resulting in a floor area ratio of 4.31:1. Three levels of subterranean parking would be provided in a parking garage underneath the mixed-use building. The Proposed Project would provide a total of 145 vehicle parking spaces and 130 bicycle parking spaces. The Proposed Project would provide 11,070 square feet of total open space (with 7,170 square feet of common open space and 3,900 square feet of private open space). The Proposed Project would require a total of approximately 35,950 cubic yards of soil export to be hauled off-site for the building foundations and subterranean levels. The proposed haul route for transporting soil to the Azusa Land Reclamation facility would travel north on N. Vermont Avenue to Los Feliz Boulevard, east on Los Feliz Boulevard to the I-5 Freeway on-ramp. Inbound haul trips would exit the I-5 Freeway at Los Feliz Boulevard, proceed west on Los Feliz Boulevard to N. Vermont Avenue, southbound to the Project Site. The Proposed Project assumes a worst-case scenario of removing all four (4) street trees, in the event of changes to the right-of-way improvement plans after approval of the environmental clearance. However, this environmental analysis does not authorize the removal of any street trees without prior approval of Urban Forestry, in compliance with LAMC Sections 62.169 and 62.170 and their applicable findings.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS