Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

17th St N Over Booker Creek Bridge No. 157126 Replacement (Project No. 23125-100)

Closed
IFB- 24 - 285State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project entails the demolition of an existing bridge culvert (bridge no. 157126) and the construction of a new bridge culvert (bridge no. 157409) along with adjacent canal walls within the right-of-way limits. The new structure will be built at the same location as the existing one, designed to support two lanes of traffic and two raised sidewalks. During construction, the roadway will be temporarily closed, but vehicular and pedestrian traffic will be maintained through designated detours and temporary lanes as specified in the project plans. The contract is managed by the City of St. Petersburg, Florida, with a project size estimated between two and five million dollars. The solicitation was posted on April 7, 2025, with a response deadline of May 8, 2025. The project falls under NAICS code 812990 and is organized by the State and Local Government Education (SLED). The primary point of contact is Victoria Amerson, reachable via email at [email hidden] or by phone at [phone hidden]. More details about the project can be accessed through the official procurement portal.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of St. Petersburg
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The project involves the removal of an existing bridge culvert (bridge no. 157126) and the subsequent construction of a new bridge culvert (bridge no. 157409) along with adjacent canal walls within the limits of the right-of-way. The new bridge culvert will be constructed in the same location as the existing, accommodating two lanes of traffic and two raised sidewalks. During construction, the roadway will be closed whereby vehicular and pedestrian traffic shall be maintained with a detour on temporary lanes as outlined in the plans. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS