19--VIRGINIA CLASS SUBMARINE LONG LEAD TIME MATERIAL

Active
N0002403C2101Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Naval Sea Systems Command plans to modify an existing contract with Electric Boat Corporation to include the procurement of Long Lead Time Material (LLTM) specifically for the Fiscal Year 2009 VIRGINIA Class submarine program. This action involves adding a line item to the current contract to support advanced procurement needs, ensuring timely availability of critical components required for the submarine’s construction. The contract modification is aimed at sustaining the production schedule and maintaining the program’s overall timeline. This announcement serves primarily as an informational notice to industry, indicating that Electric Boat Corporation will be handling the primary contract modifications and associated procurement activities. Businesses interested in subcontracting opportunities related to this work are directed to reach out to Electric Boat Corporation directly. The solicitation, identified by N00024-03-C-2101, was posted in October 2007, and no specific set-aside or NAICS code details were provided within this announcement.

General Info

Electric Boat Corporation contract modified for FY2009 Virginia Class submarine material procurement.

Agency

N/A

NAICS

336611 - Ship Building and Repairing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Naval Sea Systems Command has a requirement for Long Lead Time Material (LLTM) to support the VIRGINIA Class Submarine Program. The Naval Sea Systems Command intends to modify Contract N00024-03-C-2101 with Electric Boat Corporation (75 Eastern Point Road, Groton, CT 06340-4989) to add a line item for Advanced Procurement of LLTM for the FY 09 VIRGINIA Class submarine. This announcement is for information purposes only. Companies interested in subcontracting opportunities should contact Electric Boat Corporation directly.

Similar Contracts

Same NAICS industry code

NAICS: 336611
New
Federal
USCGC DOLPHIN FUEL TANK CLEANING
Solicitation # 52000QR270000488
The U.S. Coast Guard Surface Force Logistics Center is soliciting quotations for the cleaning and inspection of two diesel fuel service tanks (3-9-1-F and 3-9-2-F), each with a 1,450-gallon capacity, aboard the USCGC Dolphin (WPB-87354) in Mobile, Alabama. This total small business set-aside is being processed as a firm-fixed price contract using simplified acquisition procedures under FAR Part 13 and FAR Subpart 12.6. The scope of work includes the removal and legal disposal of 1,400 gallons of contaminated diesel fuel, comprehensive interior cleaning of tank surfaces, atmospheric testing by a competent person, and detailed visual inspections of structural conditions and coating systems. The contractor is also responsible for maintaining a plug log, providing a chain of custody for waste, and implementing a Quality Control Program to ensure compliance with SFLC Standard Specifications 0000 and 0740. The period of performance is not to exceed five days, with a requested work window between November 15, 2026, and December 15, 2026. Key deliverables include the successful execution of initial and post-service operational tests on tank level indicators and vent check valves, witnessed by the Engineer Petty Officer. The government will provide new gaskets and stainless steel hardware for tank closure. Interested vendors must be registered in SAM.gov and submit a detailed cost breakdown, including unit and total pricing, by November 9, 2026, at 0900 A.M. EST. Award will be based on the best value to the government, considering price, specifications, quality, and past performance.
CG-SEA-C21

POSTED

about 16 hours ago

DEADLINE

in 10 days
View Details
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

about 16 hours ago

DEADLINE

in 25 days
View Details
NAICS: 336611
New
Federal
USCG STA COOS BAY (47302-47242) FY27 DD REPAIR
Solicitation # 70z04027SSBPL28928
The Department of Homeland Security, through the U.S. Coast Guard SEA-C office in Norfolk, Virginia, has issued a Sources Sought Notice for dry dock repair services for two vessels, USCG STA COOS BAY (47302) and CG STA COOS BAY (47242). The anticipated work is scheduled to begin on March 2, 2027, in Charleston, Oregon, with an estimated period of performance of 121 calendar days per vessel. The scope of work requires the contractor to provide all necessary personnel, equipment, materials, and facilities to perform comprehensive repairs, including underwater body preservation, hull plating inspections, propulsion shaft and rudder assembly services, and the provision of marine chemist and sea trial support. The government intends to award a single firm-fixed-price contract, with the final competition and set-aside decisions based on market research conducted under NAICS code 336611. Interested sources must submit their capabilities, including company identification, UEI number, and business size certifications, to Troy Elliott by November 12, 2026. Evaluation of capabilities will include a review of past performance on projects of similar scope and a commitment to submit a proposal as a prime contractor. Economic considerations for the future award will include foreseeable costs such as crew lodging, messing, and travel in accordance with Joint Travel Regulations.
CG-SEA-C23

POSTED

about 16 hours ago

DEADLINE

in 14 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS