Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Delaware was posted on November 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

202117; 16 North Separation Project Phase 1

Closed
43763State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 2 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves a significant infrastructure project in Newark, Ohio, with a total estimated cost ranging from approximately $55.7 million to $60 million, depending on the inclusion of all alternates. The project encompasses extensive sewer separation work, including the removal of about 20,000 linear feet of combined sewer and the installation of an equivalent length of new sanitary and storm sewers. Additionally, it involves installing approximately 18,000 linear feet of waterlines, constructing a levee filter diaphragm and headwall for a storm relief sewer along the North Fork Licking Valley River, and reconnecting numerous water service lines and sanitary sewer laterals. The scope also includes disconnecting residential roof downspouts, replacing roadways, and upgrading streetscaping features to improve urban infrastructure and stormwater management. A mandatory pre-bid conference is scheduled for December 2, 2025, at Newark’s Water Office, with options for virtual participation via Microsoft Teams or audio call-in. An optional site tour will follow the conference. The project is solicited by the City of Newark under solicitation number 43763, with a response deadline of December 12, 2025. The work is categorized under NAICS code 237310, indicating heavy and civil engineering construction, and the project aims to enhance water and sewer systems, flood control, and urban streetscape improvements within the city. Interested parties can access further details and submit bids through the provided online link.

General Info

Place of Performance

OH, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDelaware → City of Newark
ContactsNo contacts available
OfficeN/A
Organization / AgencyDelaware → City of Newark
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
A mandatory pre-bid conference will be held on December 2, 2025 at 9:00AM local time, at Newark’s Water Office, 34 South 5th Street, Newark, Ohio 43055. Attendees may also join via Microsoft Teams at https://tinyurl.com/Newarkconstruction, or call in (audio only) at +1 (555) 000-0000, Conference ID 231 759 649#. An optional site tour will be conducted after the pre-bid conference.
Engineer's estimate of probable cost without alternates is $55,680,000.
Engineer's estimate of probable cost with all alternates selected is $59,920,000.
Major items of work include the following:
• Separation of approximately 20,000 LF of combined sewer and installation of approximately 20,000 LF of new sanitary sewer and installation of approximately 20,000 LF of new storm sewer.
• Installation of approximately 18,000 LF of new waterline.
• Levee filter diaphragm and new headwall for 48-inch storm relief sewer and outfall along North Fork Licking Valley River.
• Reconnection of 381 water service lines.
• Reconnection of 381 sanitary sewer laterals.
• Disconnection of 287 residential roof downspouts.
• Roadway replacement. • Streetscaping upgrades.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS