This Solicitation opportunity from Wisconsin was posted on May 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 PPII Reduction Project - Bay Point/Hermitage, Village of Bayside

Closed
9138004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

1 day ago

DEADLINE

in 18 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The project involves the rehabilitation and disconnection of sanitary sewer laterals across nine properties, with specific focus on eight properties requiring lateral rehabilitation, six needing foundation drain disconnections, two with downspout disconnections, and one involving underground downspout installation. The contractor will coordinate preconstruction meetings with district representatives and homeowners to confirm the approach and assess existing conditions, ensuring proper scheduling at least two weeks prior to work. The scope includes replacing sanitary sewer laterals from the wye connection to a district-approved point, utilizing open cut or pipe bursting methods, and conducting post-construction televising for documentation. Additionally, the contractor will disconnect foundation drains by abandoning Palmer Valves, installing sump pumps with electrical outlets, and disconnecting downspouts from the sewer system, replacing them with underground downspouts where necessary. The work also encompasses traffic control, permitting, waste disposal, and restoring turf and pavement areas after construction. The project, titled "2024 PPII Reduction Project - Bay Point/Hermitage, Village of Bayside," is managed by the Milwaukee Metropolitan Sewerage District in Wisconsin, with a contract value estimated between $100,000 and $300,000, and responses are due by June 11, 2024. The primary point of contact is Nathan Churchill, reachable via email or phone for further details.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Milwaukee Metropolitan Sewerage District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The project contemplated consists of the following Quantities: Properties Participating 9 Properties with Lateral Rehabilitation 8 Properties with Foundation Drain Disconnection 6 Properties with Downspout Disconnections 2 Properties with Underground Downspout Installation 1
The Contractor shall be responsible for: 1. The scheduling and occurrence of a preconstruction meeting with a District’s representative and the homeowner to confirm the lateral replacement approach and assessment of existing conditions. 2. The scheduling of construction work with each homeowner at least two weeks prior to construction occurring. 3. The sanitary sewer lateral replacement from the wye connection to a District-approved location, either using open cut or pipe bursting. This may include tree and pavement removal to facilitate construction. Post construction televising of the lateral shall be recorded and uploaded to t4Vault. 4. The Foundation drain disconnection of all identified properties with the abandonment of a Palmer Valve and installation of a sump pump. This process will also include electrical outlet installation to power the sump pump. 5. The abandonment of downspout connections that connect to the sanitary sewer and underground placement of a downspout at identified properties. 6. Any traffic control, permitting, and waste disposal requirements. 7. Restoration of all turf & pavement areas post construction.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS