This Solicitation opportunity from Wisconsin was posted on May 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2024 PPII Reduction Project - Bay Point/Hermitage, Village of Bayside
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The project involves the rehabilitation and disconnection of sanitary sewer laterals across nine properties, with specific focus on eight properties requiring lateral rehabilitation, six needing foundation drain disconnections, two with downspout disconnections, and one involving underground downspout installation. The contractor will coordinate preconstruction meetings with district representatives and homeowners to confirm the approach and assess existing conditions, ensuring proper scheduling at least two weeks prior to work. The scope includes replacing sanitary sewer laterals from the wye connection to a district-approved point, utilizing open cut or pipe bursting methods, and conducting post-construction televising for documentation. Additionally, the contractor will disconnect foundation drains by abandoning Palmer Valves, installing sump pumps with electrical outlets, and disconnecting downspouts from the sewer system, replacing them with underground downspouts where necessary. The work also encompasses traffic control, permitting, waste disposal, and restoring turf and pavement areas after construction. The project, titled "2024 PPII Reduction Project - Bay Point/Hermitage, Village of Bayside," is managed by the Milwaukee Metropolitan Sewerage District in Wisconsin, with a contract value estimated between $100,000 and $300,000, and responses are due by June 11, 2024. The primary point of contact is Nathan Churchill, reachable via email or phone for further details.
General Info
Place of Performance
WI, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The Contractor shall be responsible for: 1. The scheduling and occurrence of a preconstruction meeting with a District’s representative and the homeowner to confirm the lateral replacement approach and assessment of existing conditions. 2. The scheduling of construction work with each homeowner at least two weeks prior to construction occurring. 3. The sanitary sewer lateral replacement from the wye connection to a District-approved location, either using open cut or pipe bursting. This may include tree and pavement removal to facilitate construction. Post construction televising of the lateral shall be recorded and uploaded to t4Vault. 4. The Foundation drain disconnection of all identified properties with the abandonment of a Palmer Valve and installation of a sump pump. This process will also include electrical outlet installation to power the sump pump. 5. The abandonment of downspout connections that connect to the sanitary sewer and underground placement of a downspout at identified properties. 6. Any traffic control, permitting, and waste disposal requirements. 7. Restoration of all turf & pavement areas post construction.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
