This Solicitation opportunity from Illinois was posted on February 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2024 Row Accessibility Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The 2024 Right of Way Accessibility Improvement project for the Village of Downers in Illinois involves upgrading pedestrian infrastructure at multiple intersections, including Lyman and 72nd, Chicago and Northcott, Chicago and Wallbank, Chicago and Seeley, Chicago and Middaugh Forest, Maple and Cumnor, 35th and Pomeroy, Venard and Hickory, Venard and Acorn, Venard and Oak Hill, Grant and Highland, and Grant and Washington. The scope includes installing approximately 6,000 square feet of 5-inch thick Portland Cement Concrete (P.C.C.) sidewalk, along with earth excavation, removal and replacement of concrete curb and gutter, installation of concrete barrier curbs, modular block retaining walls, and necessary tree removal. The work also encompasses grading, parkway, and road restoration, ensuring the improvements meet all relevant standards. All construction activities must adhere to the latest standards set forth by the Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), Illinois Accessibility Code (IAC), and the Manual on Uniform Traffic Control Devices (MUTCD). The project solicitation was posted on February 28, 2024, with a response deadline of March 13, 2024. The contract is managed under NAICS code 423860 and is organized by the Village of Downers, Illinois. Interested parties can find additional details and submit responses through the provided DemandStar link.
General Info
Agency
Place of Performance
IL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
1. Sidewalk ramp upgrades at Lyman and 72nd 2. Sidewalk ramp upgrades at Chicago and Northcott 3. Sidewalk ramp upgrades at Chicago and Wallbank 4. Sidewalk ramp upgrades at Chicago and Seeley 5. Sidewalk ramp upgrades at Chicago and Middaugh Forest 6. Sidewalk ramp upgrades at Maple and Cumnor 7. Sidewalk ramp upgrades at 35th and Pomeroy 8. Sidewalk ramp upgrades at Venard and Hickory 9. Sidewalk ramp upgrades at Venard and Acorn 10. Sidewalk ramp upgrades at Venard and Oak Hill 11. Sidewalk ramp upgrades at Grant and Highland 12. Sidewalk ramp upgrades at Grant and Washington The project generally consists of the installation of approximately 6,000 square feet of 5” thick P.C.C. sidewalk, earth excavation, combination concrete curb and gutter removal and replacement, concrete barrier curb installation, modular block retaining wall installation, tree removal, all collateral work, and related grading and parkway and road restoration.
All work must comply with the latest requirements of the Americans with Disabilities Act (ADA), Public Right-of-Way Accessibility Guidelines (PROWAG), the Illinois Accessibility Code (IAC) and Manual on Uniform Traffic Control Devices (MUTCD).
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
