2025 Pavement Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Eureka is initiating the 2025 Pavement Rehabilitation Project to improve vehicle and pedestrian travel paths across five specific locations: Fairfield Street, F Street, Henderson Street, McCullens Avenue, and Buhne Street. The primary objective is to repair damaged roadways and establish ADA accessible pedestrian pathways to enhance overall safety. The scope of work includes standard improvements at all sites, such as replacing striping, adding truncated domes, and raising valves, manholes, and survey monuments to grade. Depending on site needs, additional work may include replacing failed asphalt sections, applying new asphalt overlays, replacing traffic detector loops, and installing new curbs, sidewalks, and curb ramps. The project is scheduled to run from October 2025 through March 2026. The contractor is required to implement a City-approved Erosion Control Plan using Best Management Protocols to prevent offsite environmental impacts. Additionally, the contractor must ensure daily site cleanup for public safety and transport all project spoils to a City-approved permitted location. This project is classified as a Class I categorical exemption under CEQA as it involves repair and maintenance without expanding roadway capacity. Primary points of contact for the project include Assistant Planner Alexandra Gonzalez and Project Manager Jay Wortelboer.

General Info

Eureka to rehabilitate pavements Oct 2025–Mar 2026 with ADA upgrades, erosion control, and weekday-only construction.

Agency

California → City of Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Multiple Citywide Sites, Eureka, CA, 95501

Set-Aside

NONE

Documents

(1)

NOE 2025 Pavement Rehab CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Eureka
Office AddressN/A
Contacts
Alexandra GonzalezAssistant Planner
Jay WortelboerProject Manager

Full Description

Show more
The City of Eureka is proposing a pavement maintenance project to provide improvements to vehicle and pedestrian travel paths on a number of road sections in the City. At all locations, improvements will include replacing striping, adding truncated domes along main pedestrian paths, and raising valves, manholes, and survey monuments to grade where grinding, paving, or overlaying occurs. Additional improvements, as needed, include removing and replacing failed asphalt sections, overlaying with new layers of asphalt pavement, replacing traffic detector loops, and installing thermoplastic markings, truncated domes, new curb and sidewalk, and curb ramps in select locations. The project is intended to repair the quality of damaged roadways and enable ADA accessible pedestrian pathways to improve overall safety for vehicles and pedestrians.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS