2026-066-CQ Logie Street and Ridout Street SPS Construction

Active
2026-066-CQInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Kawartha Lakes is soliciting quotations for solicitation number 2026-066-CQ to provide all labor, fuel, equipment, and materials for construction and rehabilitation work at the Logie Street and Ridout Street Sewage Pumping Stations in Lindsay, Ontario. The scope of work includes the construction, installation, and commissioning of a new station and the decommissioning of the existing facility at Logie Street, as well as the rehabilitation of the existing station at Ridout Street. Key technical requirements involve the installation of VFD-controlled pumps, pressure transducers, backup floats, automatic transfer switches, and pre-stressed precast concrete buildings. Specific electrical components in the Logie Street valve chamber and Ridout Street building must meet Class 1 Division 2 Explosion Proof Requirements. The project also includes site works such as demolition, excavation, dewatering, and the installation of generators and gas services. This is a stipulated contract based on CCDC 2, with a proposed start date of November 16, 2026, and an anticipated completion date of November 16, 2027. Bids must be submitted via the designated bidding system by October 29, 2026. The evaluation process consists of three stages: submission requirement compliance, technical qualification, and pricing. A 10 percent price advantage is offered to bidders with the highest proportion of Ontario and Canadian-made goods and services. Award will be granted to the compliant respondent with the lowest pricing. Successful contractors must provide a performance bond and a labor and material payment bond for 100 percent of the total submission price, adhere to the Occupational Health and Safety Act, and comply with the Municipal Freedom of Information and Protection of Privacy Act.

General Info

Construction and rehabilitation of Logie and Ridout sewage pumping stations in Lindsay, Ontario.

Documents

12

Automatic Transfer Switches Specification

PDF, High priority: read this firstsow
High

Logie and Ridout SPS Pump Control Narrative

PDF, High priority: read this firstsow
High

Logie & Ridout Sewage Pumping Stations Special Provisions

PDF, High priority: read this firstsow
High

Logie St & Ridout St Pump Station Issued for Tender

PDF, High priority: read this firstrfp
High

Logie St. SPS - Issued for Tender Drawings

PDF, High priority: read this firstifb
High

Request for Quotations 2026-066-CQ - Sewage Pumping Station Construction

PDF, High priority: read this firstrfq
High

Schedule B Customer Obligations Letter - Hydro One

PDF, High priority: read this firstsow
High

Schedule B Customer Obligations Letter - Hydro One

PDF, High priority: read this firstcontract-document
High

Technical Specifications - Logie and Ridout Street Sewage Pumping Stations

PDF, High priority: read this firstsow
High

Thermowall Pre-Stressed Precast Concrete Building Specifications

PDF, High priority: read this firstspecifications
High

Water Taking Plan - 75 Logie Street SPS Dewatering

PDF, High priority: read this firstsow
High

Zoeller Sump Pump Technical Data Sheet

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Kawartha Lakes
ContactsNo contacts available
OfficeCAN
Organization / AgencyCity of Kawartha Lakes
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
The City of Kawartha Lakes is requesting quotations for all labour, fuel, equipment and materials necessary to perform the work for the Logie Street Sewage Pumping Station (SPS) and the Ridout Street Sewage Pumping Station (SPS), in accordance with the request for quotation documents.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a comprehensive irrigation system. A significant portion of the project is a design-build effort for site electrical infrastructure, encompassing the electrical service, associated conductors, light pole bases, and signal equipment. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. This is a unit price bid solicitation requiring electronic submission via Bid Express by October 13, 2026. Bidders must provide a bid bond for the full amount or a certified check for 10 percent of the bid, and the successful awardee must post a 100 percent performance bond. Evaluation for the lowest and best bid considers prior experience with similar work, financial stability, workforce adequacy, and compliance with OSHA and Ohio Prevailing Wage laws. Insurance requirements include general liability coverage of at least $2,000,000 per occurrence, with auto and workers compensation coverage of at least $1,000,000 per accident. Contract administration is managed by the City of Centerville Public Works and Oberer Construction Managers Ltd.
City of Centerville

POSTED

about 15 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

about 17 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. Managed by the US Army Corps of Engineers New York District, the project focuses on the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The scope includes restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands to complement broader flood risk management and shore protection efforts. The project magnitude is estimated between $15 million and $30 million, and the resulting award will be a firm fixed-price contract. The procurement follows a best-value trade-off process conducted in accordance with FAR 36.3. Phase One focuses on qualifying offerors based on relevant specialized experience and past performance to shortlist up to five firms for Phase Two. Evaluation factors for the final award include relevant specialized experience, technical approach, past performance, management approach, and a small business participation plan, with non-price factors combined being approximately equal in importance to price. Phase One proposals were due by October 19, 2026. Technical requirements are guided by 30% design documentation and include strict adherence to New Jersey Department of Environmental Protection standards for waste disposal and plant quality. The contractor must provide an aggressive project schedule, with an initial schedule due within 42 days of the notice to proceed. Key deliverables include the restoration of tidal and freshwater wetlands, and the government will perform inspections at substantial completion to ensure full compliance with specifications and the viability of all planted materials.
W2SD Endist New York

POSTED

about 18 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
Federal
Z--Folsom Warehouse Bridge Crane Replacement
Solicitation # 140R2026R0017
Solicitation 140R2026R0017 is a firm-fixed-price, one-phase design-build procurement issued by the Department of the Interior, Bureau of Reclamation, for the replacement of a 30-ton bridge crane at the Folsom Dam Warehouse in Folsom, California. The project scope encompasses the removal and disposal of the existing crane, including the abatement of asbestos and other hazardous materials, and the design, fabrication, and installation of a new 30-ton bridge crane and its associated power supply. Additional requirements include performing a rail system survey with optional repairs or replacement, executing commissioning and load tests, and providing operation and maintenance training. The contract is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an estimated value between 1 million and 5 million dollars. The period of performance is 600 calendar days from the notice to proceed. Technical requirements are governed by Specifications No. 20-C0942, which detail standards for automation control systems, programmable logic controllers, and electrical components. Award evaluation is based on a technical approach narrative, past performance from the last six years, and price reasonableness. Offerors must provide a 100 percent performance bond and adhere to Davis-Bacon Act wage determinations. Proposals are submitted in three volumes covering business, technical, and pricing details, with a final response deadline of October 8, 2026.
Mp-Regional Office

POSTED

about 18 hours ago

DEADLINE

in 6 days
View Details

More opportunities from City of Kawartha Lakes

Same awarding agency

NAICS: 541320
International
Official Plan Review
Solicitation # 2026-088-CP
The Corporation of the City of Kawartha Lakes is soliciting proposals under RFP 2026-088-CP for a qualified consulting team to prepare a new Official Plan. The project requires comprehensive technical analysis, policy development, and stakeholder engagement to create a customized plan that reflects the municipality's unique rural, environmental, and community context, including areas subject to the Oak Ridges Moraine Conservation Plan. The scope of work is designed to align with the City's Strategic Plan and coordinate physical development components such as housing, transportation, and the environment. The project is estimated to take between 18 and 24 months, with a maximum duration of 30 months, and will be considered complete upon Council adoption and submission to the Minister of Municipal Affairs and Housing. The procurement process utilizes a multi-stage evaluation of technical requirements, rated non-price criteria, and pricing, with the top-ranked proponent entering direct contract negotiations. Proposals must be submitted electronically by November 5, 2026, and must include a detailed fee proposal broken down into four project phases as stipulated lump sums. Key deliverables include thematic policy briefs, engagement materials, and a final adopted Official Plan. The selected consultant must demonstrate expertise in Ontario planning legislation and policy, and comply with the City's Vendor Management Program and the Occupational Health and Safety Act. Payment is contingent upon the completion of deliverables to the City's satisfaction and the meeting of accessibility requirements.
Landscape Architectural Services

POSTED

11 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS