Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 NEIGHBORHOOD TRAFFIC MANAGEMENT PROJECTS

Closed
4704State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract pertains to the 2026 Neighborhood Traffic Management Projects, overseen by the California Department of General Services, specifically CAPSD - Construction, with work to be performed within California. The scope of the project includes providing all necessary labor, materials, equipment, and related tasks required to complete the work in accordance with detailed specifications and regulatory permits. The quantities listed in the contract are estimates provided primarily to assist in bid comparisons, with actual work volumes subject to adjustment by the County at its discretion. Bidders must comply strictly with the outlined project specifications and applicable regulations. The solicitation was posted on May 14, 2026, with a response deadline of June 11, 2026. The primary contact for this project is Associate Civil Engineer Noel Pacheco, and the secondary contact is Senior Contract Services Officer Jesse Sanchez, both reachable via provided phone numbers and emails. The project is managed out of Sacramento, California, and potential contractors can access further details and bid submission guidelines through the designated online procurement portal.

General Info

2026 California Neighborhood Traffic Management project by DGS, labor, materials, compliance required.

Documents

6

2026 Neighborhood Traffic Management Projects - Sacramento County Bid 4704

PDF, High priority: read this first10 pages · rfb
High

Contract 4704: 2026 Neighborhood Traffic Management Projects

PDF, High priority: read this firstifb
High

Contract 4704 2026 Neighborhood Traffic Management Project Special Provisions

PDF, High priority: read this first46 pages · specifications
High

FHWA-1273 Required Contract Provisions for Federal-Aid Construction Contracts 10.2023

PDF, High priority: read this first14 pages · contract-document
High

4704 AdTech Advertising System

PDF, Low priority1 page · other
Low

Attachment 2 Title VI Assurances

PDF, Low priority4 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → DGS: CAPSD - Construction
Contacts2 people available
OfficeSacramento, CA, 95827, USA
Office AddressSacramento, CA, 95827, USA
Contacts
Noel PachecoAssociate Civil Engineer
Jesse SanchezSr. Contract Services Officer

Interested Companies (29)

AP Traffic ServicesMather, CA
ConstructConnectCincinnati, OH

See All 29 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.

More opportunities from California → DGS: CAPSD - Construction

Same awarding agency

New
SLED
Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project
Solicitation # 41022
The Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project, solicitation number 41022, is a construction contract issued by the County of Sacramento's Department of Transportation. The project involves providing all labor, materials, and equipment for tree removal, with stumps remaining two feet above grade, the implementation of traffic control, and the installation of ESA fencing. The estimated construction cost is 150,000.00 dollars, and the contract will be awarded to the lowest responsible and responsive bidder. Key requirements for award include a valid California contractor's license, registration with the Department of Industrial Relations, and compliance with CARB Advanced Clean Fleets regulations. The project must be completed within twenty working days, subject to a holiday moratorium from December 18 through January 1 and the Thanksgiving weekend. The contractor is required to obtain a Caltrans Encroachment Permit and adhere to strict ADA compliance and federal access laws. Quality assurance is managed through the Sacramento County Materials Test Lab, and the contractor is responsible for all quality control testing and the maintenance of water pollution control best management practices. Bids must be submitted electronically via the SacCountyEbids portal by November 12, 2026, and must include a bid security of at least ten percent of the aggregate bid. Payment processing is handled through the County's PaymentWorks portal.

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 238210
SLED
Main Jail – Hall of Justice – Refurbish Existing Pipe Chase Leak Detection System
Solicitation # 41010
The County of Sacramento is soliciting bids for solicitation number 41010 to refurbish the non-functional Raychem Tracetek leak detection system for sanitary and pressure water lines at the Main Jail facility located at 651 I Street. The project involves replacing the leak detection panel in the basement and refurbishing water sensing cables, zone connectors, leader cables, and control modules within pipe chases. The system must be integrated with the facility's building management system for alarm and fault monitoring. The estimated construction cost is 148,590.00 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. The period of performance is 90 calendar days. Qualified contractors must hold a C-7 Low Voltage Systems Contractor license and utilize technicians certified by the system manufacturer. Due to the secure nature of the correctional environment, all personnel must pass background checks, adhere to strict security protocols, and be escorted while onsite. Work on the second and third floors is restricted to the hours of 12pm to 4pm. Safety requirements include the use of N95 or P-100 respirators in designated pipe chases. Bidders must submit their proposals electronically via OpenGov by November 5, 2026, at 2:00 pm, and must provide a bid guarantee along with proof of DIR registration. Final acceptance of work is contingent upon the submission of record drawings and successful insulation resistance testing.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

14 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS