Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Paving Improvements

Closed
2026-GEN-010State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 20 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 12 hours ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 14 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The City of Washougal, Washington, is soliciting bids for the 2026 Paving Improvements project under solicitation number 2026-GEN-010, with proposals due by June 3, 2026. The scope of work includes pavement milling and inlay/overlay, preparation of existing subgrade for asphalt placement, utility adjustments and modifications, pavement striping, and ADA-compliant ramp retrofits, all in accordance with WSDOT Standard Specifications, the MUTCD with Washington State modifications, and the City’s own engineering standards. The project is classified under NAICS code 237310 and is being procured by the Public Works department as a SLED entity. Bids must be submitted using the prescribed Bid Proposal Form, accompanied by a non-collusion declaration, E-Verify certification, wage law compliance statement, bid bond of at least five percent of the total bid amount, and qualification documentation. The award will be made to the lowest responsive, responsible, and qualified bidder, with preference given to the lowest combined bid including the base schedule and Additive Alternative A1 for 32nd Street Improvements, followed by the lowest base bid alone. The estimated value of the base bid is $651,067, and a performance bond and payment bond for the full contract amount are required, compliant with Washington State RCW Chapter 39.08 and naming the City of Washougal and Wallis Engineering PLLC as additional insureds. The contractor must comply with Washington prevailing wage laws, submit sworn certification of wage compliance, and adhere to federal debarment rules. Work must commence within ten days of the Notice to Proceed and be fully completed within ninety calendar days. All materials and construction must meet contract documents, with the Engineer responsible for inspection, testing, and acceptance—particularly for HMA density, concrete ramp samples, and traffic control installations. Insurance requirements extend to subcontractors, who must carry coverage at the same limits as the prime contractor and use specific ISO endorsements. The contractor is responsible for public safety during construction under traffic, and all ADA ramps must be approved by the Engineer. Bidders must thoroughly examine all contract documents, including plans, special provisions, and addenda, which are incorporated into the contract. The City retains the right to terminate the contract for convenience at any time without cause. All materials on site may be paid for at 100% of invoiced cost, and final payment requires submission of

General Info

City of Washougal 2026 paving project includes milling, overlays, utility adjustments, and ADA ramps.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

3

2026 Paving Improvements Final Engineer's Opinion of Cost

PDF, High priority: read this firstopinion-of-cost
High

2026 Paving Improvements - Notice to Bidders and Bid Form

PDF, High priority: read this firstrfb
High

City of Washougal 2026 Paving Improvements Final Plans

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts2 people available
OfficeCity of Washougal, WA, 98671, USA
Organization / AgencyWashington → Public Works
Office AddressCity of Washougal, WA, 98671, USA
Contacts
Ryan BakerPublic Works Operations Superintendent
Kelly BrownProgram Procurement Specialist

Interested Companies (27)

Advanced Government ServicesTacoma, WA
United traffic control solutionsMaple Valley, WA
Southwest Washington Contractors AssociationVancouver, WA

See All 27 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
General work description: Pavement mill and inlay/overlay, preparing existing subgrade for asphalt pavement construction, utility adjustments and modifications, pavement striping, and ADA ramp retrofits.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
1st Ave NE Shared Use Path - N 120th to N 130th
Solicitation # PW#2026-005
The City of Seattle Public Works department is soliciting bids for the 1st Ave NE Shared Use Path project, located between N 120th and N 130th Streets, adjacent to North Acres Park and near James Baldwin Elementary School. The scope of work is divided into a base bid, which includes pavement removal, roadway paving, sidewalks, curb ramps, storm drains, landscaping, channelization, and signage, and additive work consisting of electrical installations, foundations, and pedestrian lighting. The project requires a performance period of 120 working days for the base bid or 140 working days if additive work is included. Bids must be submitted electronically via the OpenGov portal by October 28, 2026. The contract will be awarded to the apparent low bidder who meets strict responsibility criteria, including possession of a Seattle Business License, registration on the OpenGov portal, and compliance with fair labor standards and social equity requirements. Bidders must provide a bid guaranty of five percent of the total bid and are required to submit a WMBE Inclusion Plan and a Social Equity Plan. Post-award performance will be evaluated based on workforce requirements, priority hire projections, and apprenticeship utilization. The contractor is responsible for all labor, materials, and equipment, ensuring all work meets City of Seattle Standard Specifications and ADA compliance for curb ramps. Payment is contingent upon the submission of signed statements certifying that prevailing wages have been paid.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 9 hours
View Details
NAICS: 236220
New
SLED
Dahl Restroom Renovation
Solicitation # 2025-068
The Dahl Restroom Renovation project, identified as PW#2025-068 and Contract PRK730308-98, involves the comprehensive restoration of a fire-damaged storage and restroom building at Dahl Playfield, located at 7700 25th Ave NE, Seattle, WA. The scope of work includes renovating the facility into two single-occupancy restrooms, replacing fire-damaged structural timber frames, adding shear walls, replacing the roof, removing a stone chimney, and installing a completely new electrical system. Additionally, the project requires accessibility improvements, including the revision of accessible parking stalls, sidewalks, and the pathway leading to the restrooms. The engineer's estimate for the project is $968,676.00. Administered by the City of Seattle Department of Parks and Recreation through the Department of Finance and Administrative Services, the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via OpenGov by November 4, 2026, at 2:00 PM. Requirements for bidders include a bid guaranty of five percent of the total bid, proof of insurance, and the submission of an Inclusion Plan. Awardees must provide a Social Equity Plan and list a designated Project Manager and Superintendent. The project is governed by the laws of the State of Washington and City of Seattle regulations, with strict adherence to ADA standards and prevailing wage requirements.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 7 days
View Details
NAICS: 562991
New
SLED
Stormwater Filter Facility Maintenance
Solicitation # 2026-GEN-013
The City of Washougal Public Works Department is soliciting bids for solicitation number 2026-GEN-013 to provide inspection and maintenance of stormwater filter cartridge facilities, including filter catch basins, manholes, and vaults. The scope of work involves facility and cartridge inspections, replacement of cartridges as needed, vacuum cleaning of facility floors, traffic control, and the proper disposal of sediment and debris. Documentation of all work must be provided via Survey123. The base bid covers 23 City facilities with up to 134 cartridges, while optional pricing is requested for up to 10 privately maintained facilities containing up to 63 cartridges. The project must be completed within 90 calendar days of the notice to proceed and no later than March 15, 2027. Bids are due by November 5, 2026, at 2:00 p.m. Pacific Time via the OpenGov portal. Requirements for the selected contractor include the payment of prevailing wages, completion of LNI Public Works training, and registration with the DHS E-Verify Program. Additionally, the contractor must provide a bid bond with the proposal and subsequently file performance and payment bonds for the full contract price. Payment will be made via checks within 30 days of approved progress payment requests, with a 5 percent retainage held during the progress of work.
Septic Tank and Related Services

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project is a federally funded infrastructure solicitation issued by the City of Seattle Public Works. The project scope focuses on roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. Key work elements include planing asphalt overlay, removing and replacing concrete panels and base repair, intersection realignment at NE 113th Street, and the installation of curb bulbs at NE 114th and NE 115th Streets. Additional requirements encompass ADA compliant curb ramps, sidewalk restoration, channelization, signing, concrete bike barriers, traffic signals, landscaping, and storm drainage. The engineer's estimate for the project is between $12,500,000 and $12,800,000. Bids for the project are due by November 4, 2026, with the award based on the lowest responsive bid total. The project incorporates a Federal Small Business Enterprise goal of 13% and requires strict adherence to Buy America provisions and 2010 ADA Standards. Bidders must be registered under RCW 18.27 and provide a bid guaranty of five percent of the total bid. Contract administration includes progress payments via warrants based on engineer estimates, and the contractor must provide federal payment and performance bonds. In the event of a tie in bid totals, the award will be determined by the highest percentage of recycled materials proposed, followed by a random drawing if necessary.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 7 days
View Details
NAICS: 541330
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Engineering Services

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS