Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Pennsylvania was posted on June 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Upper Southampton Township Paving Project

Closed
Upper Southampton Township, Bucks CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. This heavy civil infrastructure project encompasses a broad scope of work, including site preparation, earthwork, asbestos abatement, tunneling, utility installation, paving, and electrical systems. The solicitation specifically targets qualified Small Business Enterprises, Veteran-Owned Small Business Enterprises, and Disadvantaged Business Enterprises, requiring SBE and VSBE firms to provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to the California Labor Code, prevailing wage rates, and a Project Labor Agreement. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades or demonstrate the ability to maintain labor harmony. Funding is provided through multiple grants, including FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Responsive bidders must hold a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must coordinate through the BuildingConnected system by the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The 2026 Upper Southampton Township Paving Project is a public procurement by Bucks County, Pennsylvania, solicited under NAICS code 237310 with a submission deadline of July 7, 2026, and is restricted to pre-qualified PADOT prime contractors. The contract encompasses a base bid and twelve alternates covering pavement rehabilitation across multiple roadways and facilities within Upper Southampton Township. The base scope includes full-depth 1½-inch milling, base repair, leveling, line striping, and a 1½-inch WMA wearing course overlay on Grove Ave, Buckhill Drive, and Grave Hill Road, along with traffic loop sensor installation and joint sealing. Alternates one through ten provide similar milling and overlay services on Jason Drive, Nicolas Drive, Gregory Drive, Stahl Road, Provident Road, Melrose Ave, Harding Ave, Willopenn Drive, Buckhill Drive, and Davisville Road. Alternate eleven extends the scope to include line striping at the Willi Schaefer Athletic Complex, while alternate twelve adds grading, base course installation, and milling to the Tamanend Park bathroom facility. The work must comply with Pennsylvania Department of Transportation Publication 408 Specifications and ASTM standards, with all materials required to be new and of good quality. Performance and payment bonds equal to the contract price are mandatory, with sureties licensed in Pennsylvania, and insurance certificates must name the Owner and Engineer as additional insureds under occurrence-based policies covering ongoing operations. The contract enforces strict timelines, with substantial completion within 30 days and final completion within 45 days of the Notice to Proceed, subject to $200 per day liquidated damages for delay. The lowest responsible bidder will be selected for the combined base bid and any combination of selected alternates, with award contingent upon compliance with bid requirements, past performance, financial responsibility, and qualification of subcontractors. Bids must be submitted electronically through the PennBid platform, accompanied by a bid bond, non-collusion affidavit, agreement of surety, public works employment verification, and a list of proposed subcontractors and suppliers. All work must adhere to OSHA standards, the Pennsylvania Prevailing Wage Act, and safety protocols, with full responsibility placed on the contractor for mobilization, labor, equipment, and site facilities. Payment is issued monthly on or about the 30th day based on EJCDC Form C-620 applications, supported by a schedule of values, payroll certifications, progress schedules, and affidav

General Info

2026 Upper Southampton Township paving project includes milling, overlay, line striping, and repairs.

Agency

Pennsylvania → Bucks CountyView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Bucks County, PA, USA

Set-Aside

NONE

Documents

(9)

Appendix A - Prevailing Minimum Wage Determination for 2026 Upper Southampton Township Paving Project

PDFwage-determination

2026 Upper Southampton Road Paving Project Bid Set Contract 26-01007

PDFrfp

Section 32 01 16.71 Milling of Asphalt Pavement Surface

PDFspecifications

Contract 26-01007 2026 Upper Southampton Road Paving Project Manual

PDFproject-manual

Appendix B Public Works Employment Verification Form

PDFpublic-works-employment-verification-form

Appendix B - Asphalt Milling and Joint Sealing Specifications

PDFspecifications

2026 UST PAVING PROJECT BID SET.pdf

PDF

2025 Upper Southampton Road Paving Project Summary of Work and Measurement and Payment

PDFspecifications

2025 Upper Southampton Road Paving Project Summary of Work and Measurement

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Bucks County
Contacts1 person available
OfficeBucks County, PA, USA
Organization / Agency
Pennsylvania → Bucks County
View Agency Profile
Office AddressBucks County, PA, USA
Contacts
CODY SPADACCINO

Interested Companies (42)

Show more
ConstructConnect
Cincinnati, OH
DevCare Solutions
COLUMBUS, Ohio
Landaq Global Group

See All 42 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
This contract consists of a base bid and twelve (12) alternates in Upper Southampton Township. The base bid includes full depth 1 ½ inch milling, base repair, leveling, line striping and wearing course overlay on three (3) roadways.
Alternate(s) #1, through #10 includes full depth 1 ½ inch milling, leveling, and wearing course overlay on Jason Drive, Nicolas Drive, Gregory Drive, Stahl Road, Provident Road, Melrose Ave, Harding Ave, Willopenn Drive, Buckhill Drive & Davisville Road. Alternate #11 includes full depth 1 ½ inch milling, leveling, wearing course overlay and miscellaneous line striping at the Upper Southampton Township Willi Schaefer Athletic Complex. Alternate #12 includes grading, leveling, base course installation full depth 1 ½ inch milling, wearing course overlay and miscellaneous line striping at the Tamanend Park bathroom facility.

More opportunities from Pennsylvania → Bucks County

Same awarding agency

NAICS: 237310
SLED
W. Maple Ave. & Green St. Crosswalk Improvements
Solicitation # 13712
Contract No. 13712 is a solicitation by Langhorne Borough in Bucks County, Pennsylvania, for pedestrian safety and crosswalk improvements at the intersection of West Maple Avenue (PA Route 213) and Green Street. The scope of work includes the installation of Rectangular Rapid Flashing Beacon (RRFB) assemblies with pedestal posts, pushbuttons, and signage, as well as the installation of PVC conduit via moling. Additional infrastructure work involves modifying stormwater inlets with steel frames and bicycle-safe grates, constructing concrete ADA curb ramps, sidewalks, and cheek walls, performing tree removal and stump grinding, and applying thermoplastic pavement markings. The project also requires erosion and sediment control and comprehensive site restoration. Sealed bids must be submitted via the PennBID Electronic Bid Management System by September 17, 2026, at 11:00 AM. The contract will be awarded to the lowest responsible bidder. Bidders must provide a bid bond, certified check, or bank draft for at least 10% of the total bid amount. The successful contractor is required to furnish performance and payment bonds equal to 100% of the contract amount and must comply with the Pennsylvania Prevailing Wage Act and the Public Works Employment Verification Act for projects exceeding $25,000. Performance is subject to two possible schedules: a pre-Halloween completion by October 30, 2026, or a post-Halloween window starting November 2 and ending November 19, 2026. All work must adhere to the Occupational Safety and Health Act and EJCDC C-700 Standard General Conditions.
Highway, Street, and Bridge Construction

POSTED

22 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS