Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Washington was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2101 HQ Building A Rehabilitation, Covington Water District, Covington, WA

Closed
BXWA-2026-002504State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 12 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Covington Water District is soliciting bids for the rehabilitation of HQ Building A in Covington, Washington, under solicitation number BXWA-2026-002504. The project involves a comprehensive renovation of the administration building to be completed within 120 calendar days from the commencement date. Key scope items include selective demolition, the replacement of interior finishes in public restrooms, the women's locker room, the lunchroom, and second-floor offices, as well as the installation of LED lighting and skylights. Additionally, the project requires the creation of an ADA-compliant kitchen layout in the lunchroom, the addition of a urinal in the men's restroom, and various modifications to non-load-bearing walls along with associated mechanical, electrical, and plumbing work. Potential bidders should note that the response deadline is August 31, 2026, at 5:00 pm. The contract also includes bid alternates for the refinishing of existing stairs, the procurement of mobile kitchen islands, and new window blinds for the second floor. All work must be performed in accordance with the provided contract documents for the facility located at 18631 SE 300th Place.

General Info

Covington Water District seeks bids for HQ Building A renovation by August 31, 2026.

Agency

Washington → Covington Water DistrictView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Covington, WA, 98042, USA

Set-Aside

NONE

Documents

(298)

Specs - Page 11.jpg

JPG

Specs - Page 79.jpg

JPG

Specs - Page 146.jpg

JPG

Specs - Page 162.jpg

JPG

Addendum #1 - Page 3.jpg

JPG

Specs - Page 44.jpg

JPG

Specs - Page 180.jpg

JPG

Plans - Page 13.jpg

JPG

Specs - Page 55.jpg

JPG

Specs - Page 163.jpg

JPG

Specs - Page 201.jpg

JPG

Specs - Page 24.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 17.jpg

JPG

Specs - Page 198.jpg

JPG

Specs - Page 69.jpg

JPG

Plans - Page 16.jpg

JPG

Specs - Page 8.jpg

JPG

Specs - Page 186.jpg

JPG

Specs - Page 71.jpg

JPG

Plans - Page 24.jpg

JPG

Plans - Page 33.jpg

JPG

Specs - Page 195.jpg

JPG

Plans - Page 7.jpg

JPG

Specs - Page 80.jpg

JPG

Specs - Page 232.jpg

JPG

Specs - Page 34.jpg

JPG

Addendum #2 - Page 8.jpg

JPG

Addendum #1 Sprinkler System As-Built Plans - Page 2.jpg

JPG

Specs - Page 134.jpg

JPG

Specs - Page 59.jpg

JPG

Plans - Page 44.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 205.jpg

JPG

Plans - Page 21.jpg

JPG

Specs - Page 83.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 70.jpg

JPG

Specs - Page 212.jpg

JPG

Specs - Page 161.jpg

JPG

Specs - Page 172.jpg

JPG

Specs - Page 88.jpg

JPG

Plans - Page 31.jpg

JPG

Specs - Page 94.jpg

JPG

Specs - Page 190.jpg

JPG

Specs - Page 215.jpg

JPG

Specs - Page 145.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 152.jpg

JPG

Specs - Page 221.jpg

JPG

Specs - Page 200.jpg

JPG

Specs - Page 5.jpg

JPG

Specs - Page 203.jpg

JPG

Specs - Page 58.jpg

JPG

Addendum #2 - Page 7.jpg

JPG

Specs - Page 174.jpg

JPG

Specs - Page 114.jpg

JPG

Addendum #1 Sprinkler System As-Built Plans - Page 1.jpg

JPG

Specs - Page 9.jpg

JPG

Specs - Page 98.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 49.jpg

JPG

Specs - Page 2.jpg

JPG

Specs - Page 183.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 138.jpg

JPG

Plans - Page 18.jpg

JPG

Plans - Page 5.jpg

JPG

Specs - Page 199.jpg

JPG

Specs - Page 29.jpg

JPG

Specs - Page 136.jpg

JPG

Specs - Page 214.jpg

JPG

Plans - Page 45.jpg

JPG

Specs - Page 213.jpg

JPG

Specs - Page 60.jpg

JPG

Plans - Page 27.jpg

JPG

Specs - Page 38.jpg

JPG

Specs - Page 27.jpg

JPG

Specs - Page 133.jpg

JPG

Plans - Page 23.jpg

JPG

Specs - Page 157.jpg

JPG

Specs - Page 4.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 209.jpg

JPG

Specs - Page 166.jpg

JPG

Specs - Page 81.jpg

JPG

Specs - Page 43.jpg

JPG

Specs - Page 7.jpg

JPG

Plans - Page 20.jpg

JPG

Specs - Page 151.jpg

JPG

Specs - Page 229.jpg

JPG

Specs - Page 177.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 141.jpg

JPG

Plans - Page 22.jpg

JPG

Specs - Page 154.jpg

JPG

Addendum #1 - Page 2.jpg

JPG

Specs - Page 222.jpg

JPG

Plans - Page 15.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 14.jpg

JPG

Plans - Page 46.jpg

JPG

Specs - Page 230.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 228.jpg

JPG

Specs - Page 220.jpg

JPG

Specs - Page 159.jpg

JPG

Addendum #2 - Page 6.jpg

JPG

Specs - Page 20.jpg

JPG

Specs - Page 61.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 207.jpg

JPG

Specs - Page 47.jpg

JPG

Specs - Page 72.jpg

JPG

Specs - Page 211.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 135.jpg

JPG

Addendum #2 - Page 4.jpg

JPG

Specs - Page 26.jpg

JPG

Specs - Page 45.jpg

JPG

Specs - Page 130.jpg

JPG

Plans - Page 6.jpg

JPG

Specs - Page 189.jpg

JPG

Plans - Page 12.jpg

JPG

Specs - Page 184.jpg

JPG

Specs - Page 57.jpg

JPG

Specs - Page 15.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 91.jpg

JPG

Plans - Page 50.jpg

JPG

Specs - Page 93.jpg

JPG

Specs - Page 181.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 52.jpg

JPG

Specs - Page 179.jpg

JPG

Specs - Page 149.jpg

JPG

Specs - Page 107.jpg

JPG

Plans - Page 35.jpg

JPG

Specs - Page 227.jpg

JPG

Specs - Page 206.jpg

JPG

Specs - Page 30.jpg

JPG

Specs - Page 168.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 74.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 194.jpg

JPG

Specs - Page 16.jpg

JPG

Specs - Page 73.jpg

JPG

Specs - Page 31.jpg

JPG

Specs - Page 153.jpg

JPG

Specs - Page 41.jpg

JPG

Addendum #1 - Page 1.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 53.jpg

JPG

Specs - Page 75.jpg

JPG

Specs - Page 13.jpg

JPG

Specs - Page 208.jpg

JPG

Specs - Page 144.jpg

JPG

Specs - Page 87.jpg

JPG

Addendum #2 - Page 9.jpg

JPG

Specs - Page 231.jpg

JPG

Specs - Page 77.jpg

JPG

Plans - Page 28.jpg

JPG

Specs - Page 62.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 187.jpg

JPG

Plans - Page 49.jpg

JPG

Plans - Page 41.jpg

JPG

Specs - Page 147.jpg

JPG

Specs - Page 188.jpg

JPG

Specs - Page 131.jpg

JPG

Plans - Page 11.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 216.jpg

JPG

Specs - Page 150.jpg

JPG

Specs - Page 6.jpg

JPG

Specs - Page 99.jpg

JPG

Specs - Page 224.jpg

JPG

Specs - Page 217.jpg

JPG

Specs - Page 82.jpg

JPG

Addendum #2 - Page 5.jpg

JPG

Specs - Page 164.jpg

JPG

Specs - Page 92.jpg

JPG

Specs - Page 160.jpg

JPG

Specs - Page 23.jpg

JPG

Specs - Page 156.jpg

JPG

Specs - Page 148.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 173.jpg

JPG

Specs - Page 1.jpg

JPG

Plans - Page 38.jpg

JPG

Specs - Page 40.jpg

JPG

Specs - Page 65.jpg

JPG

Specs - Page 3.jpg

JPG

Specs - Page 223.jpg

JPG

Plans - Page 47.jpg

JPG

Specs - Page 19.jpg

JPG

Specs - Page 90.jpg

JPG

Specs - Page 226.jpg

JPG

Specs - Page 176.jpg

JPG

Specs - Page 171.jpg

JPG

Specs - Page 97.jpg

JPG

Specs - Page 225.jpg

JPG

Specs - Page 158.jpg

JPG

Specs - Page 67.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 18.jpg

JPG

Specs - Page 35.jpg

JPG

Plans - Page 36.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 202.jpg

JPG

Specs - Page 89.jpg

JPG

Specs - Page 178.jpg

JPG

Specs - Page 169.jpg

JPG

Plans - Page 10.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 218.jpg

JPG

Specs - Page 84.jpg

JPG

Specs - Page 140.jpg

JPG

Specs - Page 50.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 139.jpg

JPG

Plans - Page 40.jpg

JPG

Specs - Page 191.jpg

JPG

Plans - Page 30.jpg

JPG

Specs - Page 76.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 29.jpg

JPG

Specs - Page 197.jpg

JPG

Plans - Page 48.jpg

JPG

Specs - Page 219.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 85.jpg

JPG

Specs - Page 95.jpg

JPG

Plans - Page 25.jpg

JPG

Specs - Page 155.jpg

JPG

Specs - Page 86.jpg

JPG

Specs - Page 54.jpg

JPG

Specs - Page 56.jpg

JPG

Plans - Page 3.jpg

JPG

Specs - Page 36.jpg

JPG

Plans - Page 19.jpg

JPG

Specs - Page 28.jpg

JPG

Specs - Page 137.jpg

JPG

Specs - Page 25.jpg

JPG

Specs - Page 193.jpg

JPG

Plans - Page 32.jpg

JPG

Specs - Page 170.jpg

JPG

Specs - Page 32.jpg

JPG

Plans - Page 43.jpg

JPG

Specs - Page 42.jpg

JPG

Addendum #1 - Page 4.jpg

JPG

Specs - Page 143.jpg

JPG

Specs - Page 96.jpg

JPG

Specs - Page 64.jpg

JPG

Plans - Page 17.jpg

JPG

Specs - Page 22.jpg

JPG

Plans - Page 26.jpg

JPG

Specs - Page 126.jpg

JPG

Plans - Page 4.jpg

JPG

Addendum #2 - Page 3.jpg

JPG

Specs - Page 122.jpg

JPG

Plans - Page 14.jpg

JPG

Plans - Page 42.jpg

JPG

Specs - Page 182.jpg

JPG

Specs - Page 132.jpg

JPG

Addendum #1 - Page 5.jpg

JPG

Plans - Page 8.jpg

JPG

Specs - Page 48.jpg

JPG

Specs - Page 68.jpg

JPG

Addendum #2 - Page 1.jpg

JPG

Specs - Page 196.jpg

JPG

Specs - Page 175.jpg

JPG

Specs - Page 63.jpg

JPG

Plans - Page 39.jpg

JPG

Specs - Page 204.jpg

JPG

Specs - Page 165.jpg

JPG

Plans - Page 34.jpg

JPG

Specs - Page 109.jpg

JPG

Addendum #2 - Page 2.jpg

JPG

Specs - Page 39.jpg

JPG

Plans - Page 1.jpg

JPG

Specs - Page 66.jpg

JPG

Specs - Page 167.jpg

JPG

Specs - Page 33.jpg

JPG

Specs - Page 51.jpg

JPG

Specs - Page 21.jpg

JPG

Specs - Page 37.jpg

JPG

Specs - Page 105.jpg

JPG

Plans - Page 37.jpg

JPG

Specs - Page 142.jpg

JPG

Specs - Page 192.jpg

JPG

Specs - Page 46.jpg

JPG

Specs - Page 185.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 210.jpg

JPG

Specs - Page 78.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Covington Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
Washington → Covington Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Interested Companies (17)

Show more
Mountain, Inc. dba Mounta
Lakewood, WA
CDK Construction
Duvall, WA
Oak Hills Construction
Milton, WA

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work to be performed within 120 Calendar Days from date of commencement under this contract shall include, the renovation of portions of the Covington Water District Administration Building, including selective demolition; replacement of interior finishes in the public restrooms, women's locker room, lunchroom, and second-floor office area; renovation of the lunchroom kitchen to provide an ADA-compliant layout; addition of one urinal in the men's restroom; minor modifications to non-load-bearing interior walls; replacement of lighting with new LED fixtures; installation of skylights; and associated architectural, mechanical, electrical, and plumbing work, as shown in the Contract Documents. The Work also includes Bid Alternates for new secondfloor window blinds, refinishing of existing stairs, and furnishing mobile kitchen islands.
Pre-Bid Meeting: 8/14 @ 1:00 pm at Building A, 18631 SE 300th Place, Covington, WA 98042

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS