This Solicitation opportunity from Virginia was posted on August 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26225 - Drainage Maintenance IDQ FY27

Closed
26225State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The City of Norfolk Department of Public Works is soliciting sealed electronic bids for solicitation 26225, a unit-priced indefinite delivery quantity (IDQ) contract for stormwater drainage maintenance for fiscal year 2027. The contract features a twelve-month base period with two additional twelve-month option periods, with work executed through individual work orders. The scope of work includes the installation and maintenance of reinforced concrete, high-density polyethylene, and ductile iron piping, as well as asphalt and concrete paving, soil preparation, and specialized services such as commercial diving and dredging. All work must adhere to the AIA A201-2017 General Conditions, VDOT Road and Bridge Standards, and Norfolk City Design Standards. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a Virginia Contractor Class and Number, a City of Norfolk Business License, and project references for at least three completed stormwater network projects. Bids must be submitted electronically via the OpenGov portal by October 14, 2026, with original bid guarantees mailed to the City of Norfolk. Requests for Information must be submitted by September 15, 2026. Key requirements include the potential use of off-duty Norfolk Police Officers for traffic control and strict adherence to ASTM standards for materials and grading tolerances.

General Info

Norfolk, Virginia seeks drainage maintenance proposals for project 26225 by October 14, 2026.

Documents

2

26225 Drainage Maintenance IDQ FY27 Invitation for Bids

PDF, High priority: read this firstifb
High

Drainage Maintenance IDQ FY27 Technical Specifications

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia → Public Works (D&C)
Contacts2 people available
OfficeNorfolk, VA, 23501, USA
Organization / AgencyVirginia → Public Works (D&C)
Office AddressNorfolk, VA, 23501, USA
Contacts
Molly LandonCivil Engineer II
Ken PeacockDesign & Construction Contracting Specialist

Interested Companies (17)

East West ConstructionVirginia Beach, VA
ConstructConnectCincinnati, OH

See All 17 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
All Requests for Information (RFIs) shall be submitted no later than Tuesday, September 15, 2026 4:00 pm through the Questions portal at https://procurement.opengov.com/portal/norfolk/projects/290281 . Any RFI submitted after this date cannot be guaranteed a response by the City.

More opportunities from Virginia → Public Works (D&C)

Same awarding agency

NAICS: 237990
New
SLED
CSRM Phase 1A Floodwall Construction - Preload & Wick Drains
Solicitation # 27012
Project 27012, titled CSRM Phase 1A Floodwall Construction - Preload and Wick Drains, is a solicitation issued by the City of Norfolk Department of Public Works for ground improvement work along Water Street, extending from Berkley Bridge to the proposed Harbor Park Pump Station. The primary objective is to mitigate risks associated with compressible clay soils by installing prefabricated vertical wick drains and a surcharge preload embankment to accelerate soil settlement, creating a stable foundation for a future permanent floodwall. The scope of work also includes the installation of permanent sheet piling, temporary sheet piling, grading, and stormwater controls. The U.S. Army Corps of Engineers serves as the Designer of Record, while the City of Norfolk acts as the sole contracting agency responsible for administration, quality assurance, and field inspection. Bids are due by 4:00 PM on November 05, 2026, via the OpenGov portal, with the contract being awarded to the lowest responsive and responsible bidder. Submissions must include a bid bond for 5 percent of the total bid, a vendor questionnaire, and details regarding the firm's Virginia contractor license and Norfolk business license. The project is subject to federal requirements for cost-shared projects with the USACE, including the Buy American Act, the Davis-Bacon Act for prevailing wage rates, and specific hazardous materials packaging and marking standards per 49 CFR. Performance is measured from the acknowledgment of the Notice to Proceed through the completion of all physical work and deliverables. Key administrative requirements include a mandatory partnering session within 45 days of award and the provision of a site-based Quality Control Manager.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
Virginia Beach Blvd Over NS RR Bridge Rehabilitation
Solicitation # 23192 RB
The City of Norfolk Department of Public Works is soliciting bids for the Virginia Beach Blvd Over NS RR Bridge Rehabilitation project, identified as solicitation 23192 RB. The scope of work involves comprehensive bridge rehabilitation, including the installation and maintenance of traffic controls, epoxy bridge deck overlay, cleaning and painting of bearings, silicone joint sealant application, and beam seat reconstruction. All work must be completed within 180 calendar days and adhere to standards set by VDOT, OSHA, the Manual of Uniform Traffic Control Devices, and the Illuminating Engineering Society. The project is governed by modified AIA A201-2017 General Conditions and requires the contractor to implement a Contractor Quality Control Plan for engineer approval within 10 days of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder based on the Base Bid total, though Additive Bid Alternate No. 1 may be included if pricing is reasonable and within budget. Bidders must submit their responses electronically by November 16, 2026, and provide a 5% bid guarantee. Successful awardees are required to furnish performance and payment bonds each totaling 100% of the construction cost. Additionally, the City encourages the participation of small, minority, and women-owned businesses and requests information regarding the employment of Norfolk residents. Bidders must also provide their Virginia Contractor Registration Class and Number as part of the submission process.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in 20 days
View Details
NAICS: 237110
SLED
St. Paul's Blue-Greenway - Stormwater Phase
Solicitation # 19263
The St. Paul's Blue-Greenway Stormwater Phase project, solicitation number 19263, is a unit price bid contract issued by the City of Norfolk Department of Public Works. The scope of work involves the daylighting of approximately 1,200 linear feet of existing box culvert excavation and active-flow management, with a performance period of 360 calendar days. Key technical requirements include earthwork, dewatering, the installation of prestressed concrete and steel H-piles, and the coating of waterfront steel structures. All work must adhere to specific engineering standards, including AWS D1.1 for welding and various ASTM standards for steel materials, while adhesive anchor installations must be performed by ACGRIS-certified installers. This project is partially funded by the National Park Service Land and Water Conservation Fund and is subject to the Build America, Buy America Act (BABAA) and OMB Memorandum M-22-11, requiring that iron, steel, manufactured products, and construction materials be produced in the United States unless a waiver is granted. Bidders must provide a bid guarantee of 5% of the total bid and, upon award, furnish performance and payment bonds for at least 100% of the construction cost. Compliance with the City of Norfolk's drug-free workplace and ethics in public contracting codes is mandatory. The response deadline is December 14, 2026, with requests for information due by November 13, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

13 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS