Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

28--NOZZLE ASSEMBLY,TUR

Active
SPRPA126RYC77Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the procurement of 29 units of a 28-Nozzle Assembly, Turbine, identified by NSN 0R-2840-017000351-B8 and reference number 5154T29G03, with delivery terms set at FOB Origin. This component is classified as a Critical Safety Item, underscoring its essential role in operational safety and system integrity. The part’s design is currently unstable, with engineering, manufacturing, and performance characteristics failing to meet required objectives. Ongoing testing and service use have revealed marginal performance and low process yield, prompting plans for significant design revisions that will render the current configuration obsolete. Limited procurement and repair of existing units are permitted only until the revised design is implemented and approved. The solicitation, numbered SPRPA126RYC77, was posted on July 23, 2026, with a response deadline of August 17, 2026, and is flagged as a presolicitation, indicating preparatory activity prior to a formal acquisition process. The contracting office is the Department of Defense, specifically the Defense Logistics Agency Aviation based in Philadelphia, Pennsylvania. Primary point of contact for inquiries is Kenneth Lauber, reachable via email at KENNETH.LAUBER@DLA.MIL, with phone and fax details provided. No specific place of performance or set-aside classification is designated, and the NAICS code is not listed. The nature of the item and its safety-critical status necessitate urgent attention to design stability and transition planning.

General Info

Procure 29 unstable 28-nozzle turbine assemblies until design overhaul, FOB Origin, DLA Aviation, presolicitation.

Agency

Department Of Defense → Pa DLA Aviation At PhiladelphiaView Agency

NAICS

333611 - Turbine and Turbine Generator Set Units ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Pa DLA Aviation At Philadelphia
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Pa DLA Aviation At Philadelphia
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
NSN 0R-2840-017000351-B8, REF NR 5154T29G03, QTY 29 EA, DELIVERY FOB ORIGIN. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved. Major changes are contemplated because the part has a low process yield or has demonstrated marginal performance during tests or service use. These changes will render the present part obsolete and unusable in its present configuration. Limited acquisition/repair from the present source is anticipated pending configuration changes. THIS IS A CRITICAL SAFETY ITEM (CSI).

Similar Contracts

Same NAICS industry code

NAICS: 333611
New
DIBBS
SEAL RING, EXHAUSTThe contract solicits a SEAL RING, EXHAUST with part number 759J037-41, manufactured by Northrop Grumman Systems Corporation, identified by NSN 2825-00-296-0801, for a quantity of two AY units under solicitation SPE4A6-26-T-06YD. This is a total small business set-aside under NAICS code 333611, with a requirement that all offerings must be produced using conventional manufacturing methods—additive manufacturing is expressly prohibited and disqualifies offers. The item is designated as a critical application item, subject to stringent quality and technical requirements incorporated by reference from the DLA Master List of Technical and Quality Requirements, with all attributes assigned verification levels or AQLs as per MIL-STD-1916 or comparable zero-based sampling plans. Inspections and acceptance occur at the destination under FAR 52.246-2, with sampling requirements mandating zero non-conformances for acceptance unless otherwise specified. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129 for marking, with no special marking required, and palletization must adhere to DLA packaging guidelines. Delivery is FOB origin with a 140-day delivery window following order receipt, to be shipped to the DLA Distribution facility in New Cumberland, Pennsylvania, by June 9, 2026, with an original delivery deadline of December 26, 2026. The contractor must comply with extensive cybersecurity and compliance obligations, including CMMC Level 2 self-assessment, safeguarding covered defense information per FAR 252.204-7012, and adherence to NIST SP 800-171 DOD assessment requirements. Prohibitions on hazardous materials are strict: mercury and mercury compounds are forbidden except in specific exempted applications such as certain batteries or sensors, with portable mercury-containing devices requiring shockproof construction and secondary containment in line with NAVSEA standards. Hexavalent chromium is banned, and all hazardous materials must be labeled in accordance with the Hazard Communication Standard unless covered by other federal statutes. The contractor is required to maintain current representations in SAM, certify small business status, and comply with whistleblower protections, anti-trafficking, and employment verification mandates. Payment must be processed through Wide Area Workflow with electronic invoicing and receiving
ASC COMMODITIES DIVISION

POSTED

about 16 hours ago

DEADLINE

in 4 days
View Details
NAICS: 333611
New
SLED
40HP Surface Drive Outboard Motor SupplyThe contract requires the supply of a new, commercially available 40HP surface drive outboard motor designed specifically for shallow-water mud boat operations, ensuring suitability for demanding environments where traditional propeller systems are ineffective. The motor must be an OEM product with full manufacturer warranty and accompanying documentation to verify authenticity, performance specifications, and compliance with operational standards. It is intended for integration into a custom-built aluminum boat, necessitating compatibility with the vessel’s mounting system, fuel delivery, and control interfaces without requiring major modifications. This is a subcontract under the agency jurisdiction of the Texas Parks and Wildlife Department, with a posting date of July 24, 2026, and a response deadline of August 7, 2026. The North American Industry Classification System code 333611 confirms the scope as related to boat building and repair. The motor must be delivered and ready for immediate installation, with all necessary technical and warranty materials provided in a format acceptable for federal and state procurement compliance. Performance is expected to meet or exceed industry standards for durability, fuel efficiency, and reliability in muddy, high-obstacle water conditions, and all components must be new, unmodified, and sourced from a recognized and reputable manufacturer.
Parks and Wildlife Department

POSTED

about 18 hours ago

DEADLINE

in 13 days
View Details
NAICS: 333611
New
Federal
J059--Preventative Maintenance-Emergency Generators | Follow on Base+4 | Start: 9/30/26This procurement is a base and four option years contract for preventive maintenance of emergency and standby generators at the Chillicothe VA Medical Center in Ohio, with performance scheduled to begin on September 30, 2026. The scope includes annual and semi-annual servicing of ten emergency generators, three standby generators, and three mobile generators, along with annual load banking for the emergency and mobile units, and annual oil and fuel sampling. All labor, equipment, materials, and incidentals must be provided by the contractor, who must ensure all work complies with OSHA and NFPA codes while maintaining uninterrupted safety and access for patients, staff, and visitors on the medical center campus. Contractors and their employees must adhere to VA security protocols, including obtaining prior approval from VA police, displaying proper identification tied to the project and employer, and strictly avoiding unauthorized access to restricted areas. The contract is a 100 percent set-aside exclusively for Service-Disabled Veteran-Owned Small Businesses under Public Law 109-461, with the NAICS code 333611. To be eligible for award, offerors must be registered and actively verified in both SAM.gov and VETcert.gov, with all registrations remaining accurate, complete, and current through the proposal due date. Solicitation documents, including specifications and drawings, are available electronically through SAM.gov, and interested parties must register on the site to receive updates, amendments, and notifications automatically. No paper copies or direct mailing of amendments will be provided, and offerors bear full responsibility for monitoring the portal and acknowledging all changes. All questions must be submitted in writing to the Contracting Officer at stanley.burdine@va.gov with the specified subject line, and phone inquiries are prohibited. The proposal deadline is June 19, 2026, and failure to submit timely responses or comply with registration and amendment requirements will disqualify a submission. A single site visit will be scheduled, with details provided in the official solicitation package, and no other communication or assistance beyond the designated electronic channel will be provided by the contracting office.
250-NETWORK Contract Office 10 (36C250)

POSTED

about 21 hours ago

DEADLINE

in 23 days
View Details
NAICS: 333611
New
DIBBS
SEAL RING ASSEMBLY,The contract pertains to the supply of one SEAL RING ASSEMBLY with NSN 2825-01-062-9323 and part number 1388F01H02, manufactured to meet Northrop Grumman Systems Corporation’s technical drawing revision A dated 02/20/1975. Delivery is required within 601 days from the contract date, with shipment FOB origin and final inspection and acceptance occurring at the destination facility in New Cumberland, Pennsylvania. The item is classified as a critical application part and must conform to stringent packaging, preservation, and marking standards outlined in MIL-STD-2073-1E and MIL-STD-129. Labyrinth packing rings or dirt and oil deflectors must be immediately preserved with P-2 preservative per MIL-C-16173 Grade 2 upon cleaning and drying, with ferrous components only requiring treatment. Each segment must be individually bagged with quarter-inch thick cushioning per PPP-C-850 Type II Class 1, separated by ASTM D4727 fiberboard, and enclosed in a unit container padded with at least one inch of approved cushioning material. Sets under 40 pounds may be packaged in ASTM D5118 fiberboard boxes, while those 40 pounds or more require overseas-style wood boxes per ASTM D6251 or PPP-B-621, secured with flat steel strapping conforming to ASTM D3953 Finish C. Mercury and mercury-containing compounds are strictly prohibited unless specifically exempted for functional components like batteries, lights, or sensors as defined by NAVSEA, with portable devices requiring shockproof construction and secondary containment per NAVSEA 5100-003D. Sampling must follow MIL-STD-1916 or ASQ H1331 Table 1, with zero non-conformances required unless otherwise specified. All packaging must meet DLA’s procurement requirements, and item marking must comply with MIL-STD-129 without unique identification, as per DFARS 252.211-7003(c)(1)(i). The solicitation number is SPE4A6-26-T-09JD, with responses due by July 31, 2026, and the primary point of contact is Charleen Weber at DLA.
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 333611
New
DIBBS
SEAL RING, INLETThis contract is for the procurement of a SEAL RING, INLET with NSN 2825-00-296-0741 and part number 759J037A35, supplied by NORTHROP GRUMMAN SYSTEMS CORPORATION, under solicitation SPE4A6-26-T-06UB. The requirement is for four units to be delivered FOB DESTINATION to the DLA Distribution facility in New Cumberland, Pennsylvania, with a delivery window of 372 days from the order date, targeting a ship date of July 31, 2027. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, with no special marking required. Item-level identification is not mandated under DFARS 252.211-7003, but physical bare item marking per RQ017 is required. Sampling must comply with MIL-STD-1916 or ASQ H1331 Table 1 using a zero-defect acceptance criterion; critical, major, and minor attributes must be verified at levels VII, IV, and II with AQLs of 0.1, 1.0, and 4.0 respectively, with unspecified attributes treated as major. Mercury and mercury-containing compounds are strictly prohibited from contacting the hardware unless used in exempted applications such as batteries, sensors, or instruments under NAVSEA 5100-003D, which requires shock-proof design and a secondary containment barrier. The item is classified as a critical application item and must comply with all applicable technical and quality requirements referenced in the DLA Master List of Technical and Quality Requirements. The contractor must implement a CMMC Level 2 Self-Assessment for cybersecurity compliance and adhere to DFARS 252.204-7012 for safeguarding covered defense information and reporting cyber incidents. The contract includes multiple FAR and DFARS clauses governing equal opportunity, trafficking in persons, employment verification, sustainable products, hazardous material safety, inspection at destination, contract type, small business representation, subcontracting, and prohibitions on covered telecommunications equipment and unauthorized obligations. Payment is to be processed through WAWF, and all invoices for this fixed-price item must be submitted with an invoice and receiving report. The contract prohibits the use of mandated arbitration agreements and requires compliance with hazard communication standards under DFARS 2
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333611
New
DIBBS
RETAINING RING, GLANThe contract is for the procurement of two retaining rings, gland, exhaust, identified by NSN 2825-01-096-3595, under solicitation SPE4A6-26-T-06UX, issued as a total small business set-aside under FAR 19.5. Delivery is due within 170 days of contract award, with FOB origin delivery to the DLA Distribution facility in New Cumberland, Pennsylvania. The item is classified as a commercial item with no shelf life requirement, and Item Unique Identification is not required per DFARS 252.211-7003(c)(1)(i). The contract mandates strict adherence to DLA packaging standards (RP001), MIL-STD-2073-1E for preservation and packaging, and MIL-STD-129 for marking, with no special marking required. Sampling for acceptance must follow MIL-STD-1916 or ASQ H1331 Table 1 with zero non-conformances unless otherwise specified; critical, major, and minor attributes are assigned verification levels VII, IV, and II or AQLs of 0.1, 1.0, and 4.0 respectively. Manufactured items must comply with QA Provision 140A dated March 1, 1983, and quality requirements outlined in the DLA Master List of Technical and Quality Requirements. Mercury and mercury-containing compounds are strictly prohibited from direct contact with the hardware except for approved exemptions like batteries, fluorescent lamps, sensors, or weapon systems, with portable mercury-containing devices requiring shockproof design and secondary containment as per NAVSEA 5100-003D. Inspection and acceptance are to occur at origin, with the Government retaining full right to verify compliance before delivery. Transportation and shipping are governed by DLA procedural notes, and invoicing must be submitted electronically through WAWF. Contractors must comply with all applicable FAR and DFARS clauses including those on employment equity, trafficking in persons, cybersecurity safeguards, subcontracting for commercial items, and protection of covered defense information. The contract includes clauses for changes, termination, payment acceleration to small business subcontractors, and prohibition of certain internal confidentiality agreements. Pricing is listed as $2.00 total for two units, though the unit price of $0.000 suggests placeholder data; the contract value remains unverified due to inconsistent or incomplete financial information. All
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 3 days
View Details
NAICS: 333611
New
DIBBS
ROTOR, TURBINE, NONAIThe contract pertains to a turbine rotor, designated as NONAI, with part number 3206499000 and NSN 2835-01-643-7341, supplied by Geiger Pump and Equipment Company under solicitation SPE4A6-26-T-09EF. The item is to be delivered in a single unit with a firm fixed price and zero variance in quantity, due within 20 days of contract award, delivered FOB destination. Packaging must comply with MIL-STD-2073-1E and DLA packaging requirements, with marking per MIL-STD-129 and no special marking code applied. The rotor is not required to have item unique identification, and no shelf life restrictions apply. The delivery address is a vessel shipment to USS MICHAEL MONSOOR DDG 1001 at APO AP 96694, with specific transport instructions prohibiting parcel post and mandating the fastest traceable means under DLA procedural notes. The item is subject to technical and quality requirements referenced from the DLA Master List, including sampling protocols per MIL-STD-1916 or ASQ H1331 with zero non-conformances required unless otherwise stated. Mercury and mercury-containing compounds are strictly prohibited in or on the hardware except for specific functional uses defined by NAVSEA, and any portable devices containing mercury must include a secondary containment as per NAVSEA 5100-003D. Inspection and acceptance occur at the destination, and the contract is subject to federal acquisition regulations with no set-aside type specified.
ASC COMMODITIES DIVISION

POSTED

3 days ago

DEADLINE

in 5 days
View Details

More opportunities from Department Of Defense → Pa DLA Aviation At Philadelphia

Same awarding agency

NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract, solicitation SPRPA126RVC05, issued by the Department of Defense through DLA Aviation at Philadelphia, pertains to the supply of shipping and storage containers governed by Drawing 838E001, Revision Latest, and referenced specifications including MIL-I-45208. The containers must be manufactured using rotational molding with polyethylene shell material and meet stringent quality and compliance requirements, including adherence to AWS welding standards for steel, aluminum, and stainless steel, and use of electrodeposited alkaline Zinc-Nickel Alloy finishes in place of cadmium plating. Each container must be affixed with a Unique Identification (UID) marking in data matrix format per MIL-STD-130, and a serial number formatted as “contract#_no_dashes-000X.” A First Article Test (FAT) is mandatory unless waived for previously approved suppliers who can demonstrate identical prior production within three years at the same facility using identical processes and without waivers or rejections. The contractor must submit one unit for FAT within 120 calendar days of contract award, and the government will conduct rigorous testing including dimensional inspection, initial and final leak tests at 0.25±0.05 PSIG, an 18-inch free-fall drop test, and form-and-fit verification using government-provided items. The cost of FAT testing, estimated at $12,000, is borne by the contractor, and any failure to comply may result in contract default. All testing components, including shipping and disposal, are the contractor’s responsibility, and rejected units must be corrected and resubmitted at the contractor’s expense. The contract imposes strict controls on materials and manufacturing processes: welding must follow specific filler alloys for aluminum (4043 or 5356/5556), and work stations must maintain clean, controlled environments to prevent contamination. Contaminants such as oils and waxes must be removed through approved cleaning methods, and chemical deoxidizing must occur no more than 10 days prior to welding (reduced to 3 days outdoors), followed immediately by mechanical cleaning using approved stainless steel tools to prevent galvanic corrosion. Desiccant in accordance with MIL-D-3464 must be included at one-third unit per cubic foot of interior volume, and packaging must comply with MIL-STD-2073. The contract mandates use of the Workflow Pro Mod Assist Module, requires adherence to Buy American provisions
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 19 days
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract encompasses the procurement of specialized shipping and storage containers under solicitation SPRPA126RVB95, issued by the Defense Logistics Agency Aviation at Philadelphia, with a closing date extended to August 27, 2026. The containers must be manufactured to exacting specifications outlined in Container Research Corporation drawing number 05259, revision latest, with aluminum shell material and strict adherence to AWS welding standards for aluminum, steel, and stainless steel. Critical requirements include compliance with MIL-STD-130 for Unique Identification (UID) marking in data matrix format, with each unit assigned a serial number following the format “contract#_no_dashes-000X”. Welding processes must be controlled, documented, and inspected with visual and potential non-destructive testing, while sealing crevices and applying electrodeposited zinc-nickel alloy finishes are mandatory. Materials and processes are tightly regulated, including deoxidizing procedures limited to 10 days prior to welding and prohibited use of certain cleaning agents. Quality assurance is rigorous, requiring a First Article Test (FAT) for new manufacturers, with one unit submitted for comprehensive testing within 120 calendar days of contract award. Testing includes dimensional checks, a 18-inch free-fall drop test, pneumatic leak detection (with pressure loss thresholds strictly defined), form and fit verification, and coating inspections. The contractor bears all costs related to FAT submission, shipping, and rework if disapproved, and must provide operating and maintenance instructions. Approved paint systems and coating thicknesses are mandated per federal and military standards, with restrictions on ozone-depleting substances. A waiver to FAT is available only to prior suppliers who can prove identical production under the same facility, processes, and within three years, and must submit dual pricing. All containers require desiccant, sealed joints, and nameplates with UID marks, with the Naval Inventory Control Point Philadelphia acting as the contact for serial number assignment and test scheduling. Packaging must conform to MIL-STD-2073, and the contract includes provisions for security, Buy American compliance, small business set-asides, and equal opportunity, reflecting a comprehensive framework for defense-critical supply chain integrity.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract solicits the manufacture of containers meeting strict technical and quality standards, with the primary item identified by drawing number 05259-657E001, Revision Latest, produced via rotomolding using plastic shell material. Each container must be uniquely identified with a UID marking in data matrix format per MIL-STD-130, with serial numbers following the format contract#_no_dashes-000X, and must include a nameplate with approved alphanumeric serial numbering obtained from NAVICP. A First Article Test is mandatory unless waived under specific conditions for prior approved suppliers who meet stringent criteria including identical production location, processes, and no prior rejections or deviations. The First Article submission requires one unit delivered within 120 days of contract award to a government-designated test site, with comprehensive testing including dimensional verification, 18-inch free-fall drop testing, and pneumatic leak tests under defined pressure parameters, where any pressure loss over 0.05 psi or deformation exceeding three-quarters of an inch results in disapproval. The contractor bears all costs related to First Article testing, including shipping, repairs, and additional submissions if failed, and must certify that production occurs at the same facility as the First Article. Compliance with ASTM B 841 for zinc-nickel plating, AWS D1.2 for welding, and MIL-C-5541 for cleaning is required, along with one-third unit of desiccant per cubic foot of internal volume. The contract mandates 100% production leak testing using Method 5009 of Federal Test Method Standard 101C, with a threshold pressure loss of 0.025 PSIG after temperature and barometric adjustments. All tooling and manufacturing aids are the contractor’s responsibility, and no Government-furnished equipment applies. Packaging must follow MIL-STD-2073. The closing date for submissions has been extended to August 31, 2026. The solicitation includes multiple regulatory clauses such as Buy American, Equal Opportunity, Security Prohibitions, and Mandatory Use of Workflow Pro, and enforces strict liability limitations and compliance with National Defense priority ratings. Offers must clearly state whether they are submitted with or without waiver of First Article requirements, and failure to comply may result in contract default.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThe contract pertains to the procurement of containers manufactured to stringent military specifications, with primary reference to Container Research Corporation drawing number 05259, 530E001-501, latest revision, and associated technical requirements. The container shell is to be made of aluminum, with all manufacturing, testing, and inspection strictly adhering to the referenced drawings, specifications, and contract clauses. Key prohibitions include the use of MIL-W-81381 wire, which must be replaced with SAE-AS22759, and cadmium plating, which is replaced with electrodeposited alkaline Zinc-Nickel Alloy per ASTM B841. Welding must comply with AWS standards for the respective metals, with specific filler materials required for aluminum alloys, and all welds must undergo visual inspection with 5x magnification where necessary, with potential additional non-destructive testing such as dye penetrant as directed by the government. Strict cleaning and deoxidizing procedures must be followed prior to welding, including chemical treatments with approved acids and mechanical cleaning methods that avoid iron-based abrasives to prevent corrosion. Each container must be marked with a Unique Identification (UID) in data matrix format on a nameplate, per MIL-STD-130, and assigned a sequential serial number starting from 0001. A First Article Test (FAT) is mandatory for new manufacturers, requiring submission of one unit for comprehensive testing at a designated government facility in Colts Neck, NJ, within 60 calendar days of contract award. FAT includes dimensional checks, leak testing under 1.00 ± 0.05 psig pressure for 30 minutes, an 18-inch free fall drop test on concrete, form and fit verification with government-supplied components, and final leak retest. The contractor bears all costs related to FAT preparation, shipping, and retesting if disapproved. Approved FAT samples may be counted toward contract quantity if undamaged, but unapproved samples are destroyed. For experienced suppliers, a waiver of FAT may be considered if identical units were produced within the last three years at the same facility without deviations or rejections, provided certification is submitted. All production units must undergo 100% drop testing under the same conditions as FAT. Packaging must comply with MIL-STD-2073, and the contract includes multiple mandatory clauses related to Buy American standards, security exclusions, equal opportunity, warranty limitations, and adherence to the latest
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 17 days
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract, issued by the Defense Logistics Agency Aviation at Philadelphia, solicits the manufacturing of a plastic container shell using vacuum forming, governed by Naval Air Systems Command drawing 3321AS600 Revision LATEST and associated sub-drawings. The item is a multi-application container requiring strict adherence to quality and production standards, including compliance with AWS welding specifications for steel, aluminum, and stainless steel, and adherence to deoxidizing, cleaning, and material control procedures outlined in MIL-C-5541 and ASTM standards. All units must be marked with a Unique Identification (UID) in data matrix format per MIL-STD-130, and each container must include one-third a unit of desiccant per cubic foot of interior volume. Engineering source approval is mandatory for new manufacturers, and only approved shock mounts may be used, with HA KING SHOCK MOUNT (13008) 7900 listed as an authorized alternative. The contract prohibits chromate conversion coatings containing hexavalent chromium due to RoHS compliance, and the waterproof test per ASTM-D-951 has been deleted, replaced by visual inspection of closures and rivets. A First Article Test (FAT) is required for new suppliers, with one unit to be delivered within 120 calendar days for extensive dimensional, functional, and environmental testing including four 18-inch free-fall drops, initial and final leak tests at 1.00 ± 0.05 psig, and form-fit validation. The contractor bears all costs related to FAT shipment, testing, and rework if disapproved, and any additional submissions must meet government-specified deadlines. Approved First Article units may be counted toward contract delivery if undamaged and not destroyed during testing. Production inspections require sampling of at least one unit per lot, subject to drop and waterproof tests witnessed by government representatives, with rework permitted only once per defective unit. The contract mandates compliance with Buy American and small business set-aside provisions, along with security restrictions and mandatory use of Workflow Pro. Performance is set to conclude by August 31, 2026, and all communications, including drawing requests and UID number assignments, must be directed to the buyer at the designated email address. All tooling, fixtures, and test equipment are the contractor’s sole responsibility unless otherwise specified.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract, solicitation SPRPA126RVC19, issued by the Department of Defense through the Defense Logistics Agency Aviation office in Philadelphia, pertains to the procurement of shipping and storage containers governed by Container Research Corp drawing number 05259-934E001, with the latest revision. The contract mandates strict compliance with technical specifications including aluminum construction, electrodeposited alkaline Zinc-Nickel Alloy finish per ASTM B841, and welding standards per AWS D1.1, D1.2, D1.3, and D1.6 depending on material, with specific filler metals required for 6061 and 5000 series aluminum alloys. Each container must bear a Unique Identification (UID) in data matrix format on a nameplate, following MIL-STD-130, and be assigned a serial number in the format contract#_no_dashes-000X. A First Article Test (FAT) is required unless waived for qualified prior suppliers, with strict submission deadlines, test procedures including air pressure leak tests, 18-inch drop tests, and form and fit evaluations, all at the contractor’s expense. The contractor must provide test samples unpainted with light preservative, ensure welding and cleaning processes adhere to precise chemical deoxidizing and mechanical cleaning protocols, and seal crevices with MIL-S-81733 sealant. Each unit must contain one-third cubic foot of desiccant per interior volume, and all welding and process controls must be documented and visible at workstations. The Government will conduct FAT testing with an estimated cost of $20,000, and samples will not be returned unless refurbishment is possible and approved. Only the specified shock mount is approved, and substitutions are prohibited without written authorization. The contract includes Buy American, security, small business set-aside, and quality assurance clauses, and the offer deadline is September 9, 2026. Engineering source approval is mandatory for new manufacturers, and all drawing requests must be directed to the designated buyer.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract, issued under solicitation number SPRPA126RVC07 by the Department of Defense through DLA Aviation at Philadelphia, extends through August 31, 2026, to promote competition for the supply of rotating molded polyethylene containers conforming to Drawing No. 861E001 Revision Latest, as controlled by Container Research Corporation. The item must be manufactured using rotational molding with specific material and finish requirements, including replacement of cadmium plating with electrodeposited alkaline Zinc-Nickel Alloy per ASTM B841. Each container requires a Unique Identification (UID) marking in data matrix format on a nameplate, following MIL-STD-130, with a serial number formatted as contract#_no_dashes-000X. A mandatory First Article Test (FAT) is required for new suppliers, involving dimensional, functional, fit, and leak tests under Federal Test Method Standard 101C, including a 18-inch drop test and pressure retention evaluation, with failure thresholds strictly defined. The contractor is responsible for all FAT sample submission, testing costs, repair, and disposal, with the government estimating $12,000 in testing expenses to be factored into offers. Existing qualified suppliers may request a waiver of the FAT requirement if they can prove identical prior production within the last three years from the same facility without deviations or rejections. Packaging must comply with MIL-STD-2073, and each container must include one-third unit of desiccant per cubic foot of internal volume. All manufacturing must occur in a single facility, and production cannot initiate before FAT approval, with associated costs borne solely by the contractor. The contract enforces Buy American provisions, security exclusions, integrity of unit pricing, and mandatory compliance with WFP Mod Assist and other federal mandates. Communication regarding drawings, UID numbering, FAT arrangements, and nameplate details must be directed exclusively to the designated buyer point of contact via email.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--NRP,SHIPPING AND STThis contract, identified by solicitation number SPRPA126RVC02 and issued by the Department of Defense’s DLA Aviation at Philadelphia, pertains to the procurement of plastic containers manufactured via rotomolding to drawing number 05259-829E001, revision latest, with strict compliance to military and technical specifications. Each container must be equipped with a Unique Identification (UID) marking in data matrix format as mandated by MIL-STD-130, and affixed with a nameplate containing a contract-specific serial number format. The contract requires adherence to stringent quality controls, including a First Article Test (FAT) with mandatory submission of one unit within 120 calendar days for dimensional, functional, and leak integrity testing, though waivers may be considered for prior approved suppliers who meet specific criteria such as identical production history within the past three years and use of the same facility and processes. All containers undergo 100% production leak testing using pneumatic pressure methods per Federal Test Method Standard 101C, with rejection thresholds for pressure loss and shell deformation, as well as an 18-inch drop test to verify structural integrity. The use of electrodeposited alkaline Zinc-Nickel Alloy finish replaces cadmium plating, and each unit must include one third of a cubic foot of non-dusting desiccant per interior volume. The contractor is solely responsible for procuring all tooling, testing equipment, and shipping costs for FAT samples, none of which will be returned unless approved and refurbished; destroyed samples are irrecoverable. The contract includes mandatory compliance with Buy American provisions, security exclusions, small business set-asides, and prohibitions against unauthorized use of restricted technologies. Payment and invoicing follow Wide Area Workflow instructions, with delivery and shipping coordinated through designated Navy contacts. The solicitation closes on August 31, 2026, and includes a clause allowing contract extension to promote competition. Engineering source approval is required for new manufacturers, and all inquiries regarding drawings, UID numbering, or FAT coordination must be directed exclusively to the designated buyer email provided on the contract’s first page.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract, solicitation SPRPA126RVB92, issued by the Defense Logistics Agency Aviation at Philadelphia, seeks suppliers for a specialized shipping and storage container conforming to drawing number 05259, 828E001, latest revision, with an aluminum shell. The item requires strict adherence to military and industry standards including AWS D1.2 for aluminum welding, ASTM B 841 for Zinc-Nickel alloy finish replacing cadmium, and MIL-STD-130 for Unique Identification (UID) marking in data matrix format on a nameplate. The UID serial number must follow the format “contract#_no_dashes-000X” and is to be obtained from the buyer. All containers must include one third of a unit of MIL-D-3464 Type II desiccant per cubic foot of internal volume and sealed at crevices using MIL-S-81733 sealing compound. Welding procedures, material controls, and pre-weld cleaning require rigorous documentation, with deoxidizing limited to ten days prior to welding and mechanical cleaning immediately before welding using approved non-iron abrasives. A First Article Test (FAT) is mandatory unless waived for previous approved suppliers who meet strict criteria, including identical production within the last three years at the same facility without deviations or rejections. The contractor must submit one unit for FAT within 120 calendar days of contract award to a government-specified location, bearing explicit labeling and shipping documentation. The government will perform dimensional, functional, and leak testing, including a free-fall drop test from 18 inches and a 30-minute pressure retention test requiring no more than 0.05 PSIG loss. All FAT costs, including shipping, are borne by the contractor, and samples are typically destroyed during testing. Packaging must follow MIL-STD-2073, and the container must be unpainted with only a light preservative on corrosive areas. The solicitation closes August 24, 2026, and includes mandatory clauses on Buy American, small business set-aside, security prohibitions, workflow compliance, and integrity of unit pricing, with an estimated $10,000 government testing cost factored into bids.
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract governs the supply of specialized shipping and storage containers manufactured to precise engineering specifications under drawing number 05259-808E001, with the latest revision required. The containers, constructed from aluminum, must undergo rigorous manufacturing, inspection, and testing protocols, including strict adherence to welding standards such as AWS D1.2 for aluminum, proper deoxidizing and cleaning procedures, and the use of approved filler materials like 4043 and 5356 alloys. Each unit must be equipped with a Unique Identification (UID) marking in data matrix format as mandated by MIL-STD-130, and a nameplate providing serial numbers formatted per the contract’s convention. Compliance with environmental and surface treatment requirements is critical, including glass bead blasting with specified media, replacement of cadmium plating with zinc-nickel alloy finish per ASTM B841, and sealing of crevices using MIL-S-81733. A one-third unit of MIL-D-3464 Type II desiccant must be installed per cubic foot of interior volume. The contract mandates a First Article Test (FAT) for new manufacturers, requiring submission of one unit to designated government test facilities in Lakehurst and Picatinny, NJ, where it undergoes dimensional verification, a 18-inch free-fall drop test, and a rigorous 30-minute pneumatic leak test with pressure thresholds set at 1.0 ± 0.1 PSIG. Failure to pass results in mandatory re-submission at the contractor’s expense, and all costs associated with shipping, testing, and refurbishment of FAT samples are the contractor’s responsibility. The contractor must also maintain full control over materials, tooling, and work processes, with no government-furnished equipment permitted. Production units are subject to a 100% leak test using a lower pressure threshold of 0.50 ± 0.025 PSIG, where a pressure loss exceeding 25% of the stabilized level or more than three-quarters of an inch of deformation during pressurization will result in rejection. The contract enforces Buy American provisions, security prohibitions, and small business set-asides with active compliance dates through February 2026, and includes provisions for waiver of FAT requirements for qualified prior suppliers who meet strict criteria regarding recent production history and identical manufacturing conditions. The solicitation deadline is August 27, 2026, and all deliveries must comply with
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 335999
New
Federal
70--CONVERTER,ANALOG TOThe solicitation seeks a converter, analog to digital, under NAICS code 335999, issued by the Department of Defense through the Defense Logistics Agency Aviation office in Philadelphia. The proposal must be submitted by July 27, 2026, and includes a wide array of contractual clauses covering critical compliance areas such as Buy American requirements, royalty disclosures, security prohibitions, transportation by sea, and annual representations and certifications. Specific provisions mandate adherence to government payment instructions, integrity of unit pricing, restrictions on liability for high-value items, and protocols for the release of offeror information under the AbilityOne program. Additional directives address equal opportunity for workers with disabilities, value engineering initiatives, and the use of facsimile proposals, while special attention is given to national defense priorities and emergency preparedness through priority rating notifications. The contract also incorporates deviations and updated certifications effective through 2026, requiring strict compliance with evolving federal acquisition standards. The point of contact for inquiries is Gregory Koch, reachable via email and telephone, with the place of performance unspecified but likely tied to DLA’s operational footprint. All submissions must align with the mandated representation and certification requirements, including those tied to free trade agreements and balance of payments programs, and must comply with the most recent security exclusions and facility-level restrictions imposed by the government. The solicitation is open to all eligible contractors with no designated set-aside, and responses must be submitted through the designated SAM.gov portal prior to the deadline. Any failure to adhere to the listed clauses could result in disqualification or contract penalties.
All Other Miscellaneous Electrical Equipment and Component Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 2 days
View Details
NAICS: 332439
New
Federal
81--SHIPPING AND STORAGThis contract pertains to the procurement of specialized containers governed by stringent quality, manufacturing, and testing requirements, with the primary identification drawing number 583E001, Revision Latest, issued by Container Research Corporation. The containers must be fabricated from aluminum shell material, with welding performed in strict compliance with AWS standards depending on the base metal—AWS D1.1 for steel, AWS D1.2 or MIL-W-22248 Class 4 for aluminum, and others for stainless and sheet steel. Filler metals are prescribed specifically for each alloy: 4043 for 6061, and 5356 or 5556 for 5000 series alloys. All welding areas require meticulous preparation, including chemical deoxidization using approved acid solutions within ten days of welding (reduced to three days if exposed outdoors) and immediate mechanical cleaning prior to welding using stainless steel wire brushes only, avoiding iron-based abrasives. Surface finishing requires glass bead blasting with #8 media at 50–70 PSIG to achieve a uniform matte finish, with media strictly segregated from contamination with other metals. Each container must bear a Unique Identification (UID) in data matrix format per MIL-STD-130, with serial numbers formatted as contract#_no_dashes-000X, and must include a nameplate with the assigned alphanumeric serial number obtained from the designated buyer contact. A mandatory first article test (FAT) is required for new manufacturers, involving dimensional, functional, leak, and free-fall drop tests with the container subjected to a 18-inch drop onto concrete, pressurized to 1.00 ± 0.05 psig, and monitored for pressure loss exceeding 0.05 psi over 30 minutes. The contractor bears all costs associated with FAT, including shipment, rework, and additional submissions if rejected, with the government reserving right to adjust contract terms for delays. A waiver may be granted to previously qualified suppliers who can prove identical production under the same processes and facility within the last three years, but such waivers require dual pricing submission and strict certification. All containers must contain one-third cubic foot of desiccant per interior volume and seal crevices with MIL-S-81733. The contract mandates compliance with Buy American provisions, strict material control, welding inspections using 5X magnification and nondestructive testing as directed, and adherence to Navy-specific protocols for transportation,
Other Metal Container Manufacturing

POSTED

about 21 hours ago

DEADLINE

in 23 days
View Details