The contractor is required to supply two new, non-refurbished three-phase power supply test systems to the Defense Supply Center Columbus, including an 18kVA system and a 1kVA system, both capable of delivering DC, single-phase, and three-phase power from DC to 5kHz in sinusoidal, square wave, and arbitrary waveforms. Both systems must meet strict performance criteria, including an accuracy of at least 0.15%, harmonic distortion under 0.3% at 50/60Hz and under 1% above, a power factor no lower than 0.98, and a voltage resolution of no less than 0.1V. Each system must come with NIST-traceable and ISO 17025 accredited calibration certificates, detailed operating manuals, all necessary cables and accessories, and be mounted on a wheeled frame designed to fit through standard commercial double doors. The 18kVA system must operate from a single 480V three-phase hard-wired disconnect, while the 1kVA system must plug into a standard 120V single-phase 20A outlet. The contract also mandates the inclusion of GPIB, Ethernet, and USB interfaces, two Windows 11 PCs with all required peripherals, software, and permanent licenses for system control, and eight hours of on-site training and setup. The equipment must be delivered within 30 days of award to the designated lab at Building 11-7 within the DLA Product Test Center in Columbus, Ohio, with all shipping costs covered by the contractor. The contractor must notify the government when the systems are ready for delivery and must offer an optional extended warranty and multi-year service contract. The systems must be fully functional, tested, and documented prior to delivery to ensure seamless integration into the testing environment.
General Info
Agency
NAICS
Place of Performance
Columbus, OH, 43213, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The contractor shall provide all labor, materials, tools, transportation, supplies, supervision, etc. (except as noted), necessary to provide all components for a 18kVA 3Φ Power Supply Test System and 1kVA 3Φ Power Supply Test System to the Defense Supply Center Columbus (DSCC), Columbus, Ohio. The salient characteristics of the 3Φ Power Supply Test Systems are as listed below:
A. DC, 1Φ and 3Φ power system with support equipment with the following salient characteristics:
1.Shall be new, not refurbished.
2.Shall be supplied with Operating manual.
3.First system shall be capable of supplying: DC, 1Φ and 3Φ power from DC to 5kHz (sinusoidal, square wave, and arbitrary waveform) rated to 18kVA
4.Second system shall be capable of supplying: DC, 1Φ and 3Φ power from DC to 5kHz (sinusoidal, square wave, and arbitrary waveform) rated to 1kVA
5.Shall have accuracy of at least 0.15%.
6.Shall have no more than 0.3% distortion at 50/60Hz and no more than 1% distortion above these frequencies.
7.Shall have no less than 0.98 power factor.
8.Shall have resolution of no less than 0.1V.
9.Optional extended warranty and multi-year service contract must be offered.
10.Shall have: NIST Traceable Calibration Certificate and ISO 17025 accredited calibration certificate with data and uncertainties.
11.Shall include all the cables, sub-equipment and accessories for the system to reliably operate.
12.Shall be on a wheeled frame for easy movement.
13.Shall be able to fit through standard commercial double door (approximately 83”H x 70”W).
14.First system shall work as a single system to only require one 480V/3φ delta hard-wired disconnect for the entire system. Seconds system shall work as a single system to only require standard 120V/1φ 20A outlet.
B. Required Upgrades and Accessories - Brand Name or Equal:
1.GPIB, ethernet, USB Interfaces.
2.2 Windows 11 PCs with all necessary peripherals, hardware, ports, et cetera with software and permanent license to reliably control system.
3.8 hours of on-site training and setup.
C. Place of Performance
The instrument shall be delivered to:
Defense Supply Center Columbus
300 North James Road, Bldg 17-3
Mark for: DLA Product Test Center, Bldg 11-7 (TE Lab)
Columbus, Ohio 43213
Other Requirements:
1.Delivery: 30 days from date of the award.
2.Contractor shall give notification when the instrument is ready to be delivered.
3.All shipping costs are to be included in the contracted price.
More opportunities from Department Of Defense → DCSO-COLUMBUS-DIVISION-2
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS