This Solicitation opportunity from Texas was posted on November 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Texas Workforce Commission is soliciting proposals for the Mopac Print Shop Upgrades at 12312 North MoPac Expressway in Austin, Texas. The project involves the renovation of an 8,903 square foot facility, specifically requiring the installation of a heating, ventilation and air conditioning Energy Recovery Ventilator, ceiling tiles, flooring tiles, and necessary ductwork modifications. All work must comply with 2021 ICC codes, NFPA National Electric Code, Texas Accessibility Standards, and ADA Title II. Proposals are due by January 5, 2026, and will be evaluated based on cost, past project performance, project milestone schedule, and pre-proposal conference attendance, with several pass/fail requirements including a financial questionnaire and a letter of bonding capacity.
Contractors must adhere to strict compliance standards, including maintaining umbrella liability insurance equal to 100 percent of the contract sum and accepting liquidated damages of 660 dollars per calendar day. A significant emphasis is placed on Historically Underutilized Business goals, with a target of 32.9 percent for special trade construction contracts and a requirement for monthly Progress Assessment Reports. Additional mandates include criminal background checks for key personnel, E-Verify compliance, and adherence to the Texas Public Information Act. Deliveries are designated as F.O.B. Destination, and all iron or steel products used must be produced in the United States.
DOCX, High priority: read this firstevaluation-scoring-matrix
HighAI Summary for 3202600107 Mopac Print Shop Upgrades Evaluation Scoring Matrix: This document is Attachment 3 for the 3202600107 Mopac Print Shop Upgrades Services procurement. It provides the evaluation scoring matrix used to assess proposals. The matrix allocates points across criteria including Cost (40 points), Past Project Performance (30 points), Project Milestone Schedule (20 points), and Pre-Proposal Conference Attendance (10 points). Additional pass/fail criteria include Financial Questionnaire, HUB Subcontracting Plan, Execution of Response, Written Narrative of Qualifications, and Letter of Bonding Capacity. The total possible score is 100 points.
PDF
PDF, High priority: read this firstpre-bid-conference-presentation
HighAI Summary for 3202600107 Pre-Bid Conference Presentation - HUB Subcontracting Plan Overview: This document is a Pre-Bid Conference Presentation dated for solicitation 3202600107, focusing on the HUB Subcontracting Plan (HSP) requirements. It outlines key notes including the HSP submission deadline, the Texas Workforce Commission's HUB subcontracting goal of 32.9% for special trade construction contracts, and the mandatory nature of submitting an HSP with proposals. The presentation details methods for completing the HSP, including Method A (using only HUB subcontractors) and Method B (notifying multiple HUB vendors and providing justification for non-HUB vendors). It also covers self-performing justifications, monthly compliance reporting requirements (Progress Assessment Report), and the necessity of agency approval for any HSP modifications post-award. Contact information for HUB-related questions is provided.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Addendum 1 for RFP 3202600107 Mopac Print Shop Upgrade Services: This document is Addendum #1 issued on 11/25/25 for the Request for Proposals (RFP) No. 3202600107 concerning Mopac Print Shop Upgrade Services by the Texas Workforce Commission (TWC). It notifies that the Pre-Proposal HSP slides and Sign-in sheet have been posted, providing additional information relevant to the RFP process.
DOCX
DOCX, High priority: read this firstamendment
HighAI Summary for Addendum 2 for RFP 3202600107 Mopac Print Shop Upgrade Services: This document is Addendum #2 issued on 12/9/25 for the Request for Proposals (RFP) No. 3202600107 concerning Mopac Print Shop Upgrade Services. It is issued by the Texas Workforce Commission (TWC) located in Austin, Texas. The addendum serves as a pre-bid notice informing all interested parties that the addendum has been posted, likely containing updates or clarifications to the original solicitation.
PDF
PDF, High priority: read this firsthsp
HighAI Summary for Attachment 10 - HUB Subcontracting Plan Guide for IFB No. 3202xxxxx: This document is the HUB Subcontracting Plan (HSP) Guide associated with IFB No. 3202xxxxx issued by the Texas Workforce Commission. It outlines the mandatory requirements for all proposers, including HUB and non-HUB vendors, to submit a completed HSP as a pass/fail element of the RFP. The guide details notification procedures to certified HUB vendors and trade organizations, subcontractor identification and justification for non-HUB vendors, and includes a quick checklist for completing the HSP form. It references Texas Gov't Code §2161.252 and statewide HUB goals per 34 TAC §20.13, emphasizing good faith efforts to meet or exceed HUB subcontracting goals. The document also provides contact information for HUB assistance and instructions for various subcontracting scenarios.
PDF
PDF, High priority: read this firstprogress-assessment-report
HighAI Summary for Attachment 11 - Overview of Progress Assessment Report (PAR): This document is the Progress Assessment Report (PAR) form required under the Texas Administrative Code for the HUB Subcontracting Plan (HSP). It must be submitted monthly throughout the contract's duration, regardless of subcontracting activity. The report includes instructions for filling out company and contract identifiers, listing subcontractors with payment details, and verifying HUB status using the Texas Centralized Master Bidders List. The form requires signature, date, and title of the signee and submission to the Texas Workforce Commission HUB Office by the 5th of each month. It ensures compliance with subcontracting requirements and tracks payments to HUB and Non-HUB subcontractors.
XLS
XLS, High priority: read this firstprogress-assessment-report
HighAI Summary for Attachment 12 - Prime Contractor Progress Assessment Report: This document is a Prime Contractor Progress Assessment Report used to document compliance with the HUB Subcontracting Plan (HSP). It is a form that must be completed and submitted monthly to the contracting agency. The report includes fields for contract/requisition number, contracting agency/university name, contractor company name, point of contact, reporting period, and payment amounts. It also requires reporting of HUB and non-HUB subcontractor information, including subcontractor names, HUB status, Texas VID or federal EIN, contract amounts, and payments made during the reporting period. The form references the State of Texas’ Centralized Master Bidders List (CMBL) for verifying HUB status. The version of the form is Rev. 10/16.
PDF
PDF, High priority: read this firstterms-and-conditions
HighAI Summary for Attachment 1 - TWC Terms & Conditions Architect & Engineer Version 07-31-25: This document, Attachment 1 - TWC Terms & Conditions Architect & Engineer Version dated 07-31-25, outlines the standard terms and conditions applicable to Texas Workforce Commission (TWC) purchases. It includes solicitation response requirements such as firm pricing, bid alteration, rejection criteria, and tax exemptions. The document also covers general conditions including liability claims, damage responsibility, disclosure of information, and compliance with the Texas Public Information Act. Vendors must agree to these terms by responding to solicitations or fulfilling purchase orders, with any exceptions requiring mutual written agreement.
DOCX
DOCX, High priority: read this firstsupplementary-conditions
HighAI Summary for Attachment 5 - Supplementary General Conditions: This document, titled Attachment 5 - Supplementary General Conditions, outlines additional contractual requirements. It specifies the need for the contractor to maintain umbrella liability insurance equal to 100% of the contract sum, providing coverage that is at least as broad as the primary liability insurance and includes drop down coverage. It also establishes liquidated damages at a rate of $660.00 per calendar day. These conditions supplement the main contract terms and are critical for contract compliance and risk management.
PDF
PDF, High priority: read this firstsow
HighAI Summary for RFP 3202600107 Project Drawings for Texas Workforce Commission: This document is the 100% submission of project drawings dated 11/18/2025 for RFP #3202600107 issued by the Texas Workforce Commission. It includes detailed architectural and construction code compliance information referencing the 2021 ICC codes, NFPA National Electric Code, Texas Accessibility Standards, and ADA Title II. The project involves renovation of an 8,903 square foot building located at 12312 N. Mopac Expressway, Austin, TX. The drawings provide essential technical specifications and code summaries necessary for the construction and renovation work under this solicitation.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Solicitation 3202600107 Mopac Print Shop Upgrades Services RFP: This document is a Request for Proposals (RFP) for Mopac Print Shop Upgrades Services issued by the Texas Workforce Commission (TWC) with Solicitation No. 3202600107. Released on November 19, 2025, the RFP outlines the purpose, scope of work, general information, proposal process, evaluation criteria, and required proposal information. It includes detailed definitions, terms and conditions, contract award and execution procedures, and submission instructions. The document specifies the schedule of events, evaluation process, and HUB subcontracting requirements. Responses are due by January 5, 2026, at 10:00 a.m. Central Time. The RFP covers various service categories including electrical cable and wire, acoustical ceilings and walls, HVAC maintenance, demolition, and tile and marble work. The document serves as the primary solicitation for vendors to submit proposals for the specified services.
PDF
PDF, High priority: read this firstuniform-general-conditions
HighAI Summary for Texas Workforce Commission Uniform General Conditions v9-24-2024: This document is the Texas Workforce Commission Uniform General Conditions, version dated 9/24/2024. It provides comprehensive terms and conditions governing construction contracts, including definitions, laws, contract documents, administration, responsibilities, changes, payments, schedules, project completion, warranties, dispute resolution, and miscellaneous provisions. It serves as a foundational contract document outlining the rights, duties, and obligations of the contractor and the Texas Workforce Commission for construction projects.
DOCX
DOCX, Low prioritychecklist
LowAI Summary for Attachment 4 - Proposal Submission Checklist: This document is Attachment 4, a Proposal Submission Checklist designed to assist respondents in preparing a responsive proposal. It lists required documents and forms such as the Written Narrative of Qualifications, Past Project Performance Sheets, Financial Questionnaire, Executions of Response, HUB Subcontracting Plan, Cost Proposal, Title Page, Letter of Bonding Capacity, Substitute W9 and Direct Deposit Form, and Public Information Act redacted copies if applicable. The checklist is advisory and not mandatory to attach to the proposal.
PDF
PDF, Low priorityinstructions
LowAI Summary for Texas Workforce Commission Substitute W-9 and Direct Deposit Form Instructions: This document provides detailed instructions for completing the Texas Workforce Commission Substitute W-9 and Direct Deposit Form. It explains each box on the form, including legal name, DBA, tax information mailing address, payment address, taxpayer identification number, federal tax classification, profit status, corporation information, sole ownership info, general partnership info, exemption from backup withholding, new and existing account information for direct deposit, international payments verification, and certification instructions. The instructions reference IRS guidelines and emphasize the importance of accurate information for tax and payment processing purposes.
TXT
TXT
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseAwarded
Posted
Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The Texas Workforce Commission (TWC) is accepting proposals to provide and install a heating, ventilation and air conditioning (HVAC) Energy Recovery Ventilator (ERV), ceiling tiles, flooring tiles, and perform ductwork modifications at the TWC Mopac Building located at 12312 North MoPac Expressway, Austin, Texas 78758.
More opportunities from Texas Workforce Commission