Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 11, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

4-Ton Air Conditioners

Closed
RAKOWSKIF2UT512178A002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333415
New
DIBBS
COOLING COIL, AIR, DUCT
Solicitation # SPE7M0-27-T-0178
Solicitation SPE7M0-27-T-0178 is issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for the procurement of one duct type air cooling coil, identified by NSN 4130011916131 and part number 19-80-2979M. The requirement is classified under NAICS code 333415 and is set aside for small businesses, with a specific price evaluation preference for HUBZone concerns. The original required delivery date is October 1, 2026, with a delivery window of five days after receipt of order. Delivery is FOB Origin, and both inspection and acceptance will occur at the destination, specifically the Puget Sound Naval Shipyard IMF in Bremerton, Washington. The contract mandates strict adherence to technical and quality requirements via the DLA Master List and specifies packaging and marking standards according to MIL-STD-2073-1E and MIL-STD-129. Special restrictions are in place regarding the use of mercury and the removal of government identification from non-accepted supplies. Administrative requirements include electronic invoicing through the Wide Area WorkFlow system and submission of all quotes via the DLA Internet Bid Board System by October 19, 2026. Key regulatory clauses apply, including the Buy American and Balance of Payments Program, NIST SP 800-171 assessment requirements, and safeguarding of covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

about 19 hours ago

DEADLINE

in 2 days

General Info

NAICS

333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

Place of Performance

Luke AFB, LUKE AFB, AZ, 85309, USA

Set-Aside

SBA

Documents

2

Letter.pdf

PDF

SPECS.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts1 person available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

about 24 hours ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS