Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on September 10, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

H--FIRE ALARM Inspection services

Awarded
140P5320Q0037Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541350
New
SLED
Escalator and Elevator Inspection Services for Tampa Convention Center
Solicitation # 27-P-00029
Solicitation 27-P-00029 is a Request for Quotes issued by the City of Tampa's Convention and Tourism agency for escalator and elevator inspection services at the Tampa Convention Center. The selected contractor must provide all labor, tools, and technical expertise to perform annual routine physical, mechanical, and operational safety inspections, including Category 1 no-load safety testing for elevators and mandatory operational tests for stair lifts and escalators. All work must comply with ASME A17.1, the National Electrical Code, and local building codes. Key deliverables include detailed inspection reports submitted within five business days and the filing of all necessary documentation with governing authorities to secure operational certificates by the July 31 annual expiration date. The contract is awarded to the lowest responsive and responsible bidder, with the City reserving the right to award by division, line item, or aggregate total. Qualified bidders must possess a valid Florida business license, a state or local Conveyance/Elevator Contractor License, and Certified Elevator Inspector (QEI) credentials. Additionally, contractors must demonstrate at least five years of commercial inspection experience and specific technical proficiency with KONE equipment, such as KCM831, EcoSpace, and MonoSpace systems. Submissions must be made electronically via OpenGov and include itemized flat-rate pricing, hourly rates for consulting or after-hours work, and three active commercial references. Awardees are required to provide proof of insurance and adhere to strict non-discrimination and civil rights compliance standards.
Convention & Tourism

POSTED

about 11 hours ago

DEADLINE

in 13 days
NAICS: 541350
New
Federal
H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Solicitation # 36C24227Q0041
The Department of Veterans Affairs is soliciting quotes for a Qualification of Elevator Inspectors (QEI)-Certified Inspector to serve as a third-party witness for annual and semi-annual safety inspections and testing at the Canandaigua and Bath VA Medical Centers in New York. This service-disabled veteran-owned small business set-aside under NAICS 541350 consists of a 12-month base period starting November 1, 2026, with four additional 12-month option years. The certified inspector is responsible for independent witnessing and reporting using VA Form 10-6167, while a separate maintenance contractor provides the labor and equipment to perform the physical tests. All work must comply with the most current ASME A17.1 and ANSI/ASME 17.2 codes. The scope of work includes semi-annual inspections, annual hydraulic pressure tests, and annual traction no-load tests during the base and final option years, with five-year traction full-load tests scheduled for Bath VAMC in option year one and Canandaigua VAMC in option year two. Services are typically performed in April and October. Award will be based on an evaluation of technical capability, past performance, and total price. Offerors must submit a technical capability statement of no more than 10 pages and adhere to New York State licensing and Service Contract Act wage determinations.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 13 hours ago

DEADLINE

in 4 days
NAICS: 541350
New
Federal
NTX Elevator Inspection
Solicitation # 36C25727Q0031-0001
The Department of Veterans Affairs Network Contracting Office 17 is soliciting elevator and dumbwaiter inspection and testing services for three facilities located in Dallas, Garland, and Bonham, Texas. This requirement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 541350. The scope of work includes annual Category 1 inspections for all conveyances and five-year Category 5 full-load testing for 23 conveyances in Garland and Sam Rayburn, and 47 conveyances in Dallas, including three dumbwaiters. All services must be performed in accordance with A17.1 and A17.2 elevator codes by TDLR-registered and QEI-certified inspectors. The contract will be awarded based on technical capabilities, past performance, and price. Deliverables include inspection reports and regulatory filings submitted to the Texas Department of Licensing and Regulation and the Contracting Officer's Representative. Invoices are to be submitted in arrears upon the completion and acceptance of services. Proposals must be submitted as a single combined PDF by November 9, 2026, at 3:00pm CST, with a 25-page limit for the technical proposal, excluding technical exhibits such as licenses and certifications. Key administrative requirements include compliance with FAR 52.222-42 and 52.222-43 regarding labor standards and the VAAR 852.219-75 certification.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 13 hours ago

DEADLINE

in 11 days
NAICS: 541350
New
SLED
Campus Consulting – Inspector Of Record (IOR) Services
Solicitation # RFP2026-06AM
California State University, Chico is soliciting proposals under RFP2026-06AM for a non-exclusive Task Order Service Agreement to provide on-site Inspector of Record or Construction Inspector services for various campus projects. The selected service provider will be responsible for quality control and ensuring code compliance in accordance with the California Building Code. Qualified inspectors must hold certifications from ICBO/ICC, OSHPD, or DSA, or be a licensed architect or registered engineer in California. The contract features an initial term of two years with the option to renew for two additional two-year terms. Proposals are due by November 12, 2026, and must include a standard fee schedule, detailed experience and staffing information, project history regarding construction costs, and sample inspection documentation. Evaluation will emphasize experience with higher education institutions, specifically within the California State University system. Awarded providers must register with the Department of Industrial Relations and maintain comprehensive insurance coverage, including a 4 million dollar general aggregate and specific workers compensation limits. Payments will be processed monthly in arrears upon submission of invoices in the CSU format and written approval from the project administrator.
California State University, Chico

POSTED

about 16 hours ago

DEADLINE

in 14 days
NAICS: 541350
New
SLED
Districtwide Construction Inspection Services
Solicitation # 2027-07
The Solana Beach School District is soliciting qualifications under RFQ 2027-07 to establish a master agreement for districtwide construction inspection services. The scope of work encompasses both general construction-related consultant services and specialized inspection and materials testing. The District intends to create pools of prequalified firms, short-listing up to five of the most qualified firms per specialty to be assigned work on an as-needed basis via written task orders. The initial term of the agreement is one year, with the possibility of four one-year extensions for a total maximum duration of five years. Selection is based on qualifications rather than the lowest price, utilizing a 100-point scoring scale that emphasizes the depth of the firm's experience and the qualifications of proposed professionals. Minimum requirements include at least ten years of experience with California public K-12 projects, current DIR registration, and specific DSA certifications for project inspectors or laboratory of record status for materials testing. Awarded firms must comply with California prevailing wage laws, non-discrimination policies, and the Drug-Free Workplace Act. Invoicing occurs monthly and requires detailed documentation of time spent and work accomplished. Responses are due by November 10, 2026, and must include four hard copies and one electronic PDF copy on a USB drive for each specialty applied for.
Solana Beach School District

POSTED

about 17 hours ago

DEADLINE

in 12 days
NAICS: 541350
New
SLED
Residential Energy Audit
Solicitation # NSD-RFQu-26-006
The City of Phoenix Neighborhood Services Department is soliciting offers for residential energy audit consulting services under solicitation NSD-RFQu-26-006. The resulting agreement will have a five-year term beginning December 1, 2026, or upon final recording by the City Clerk. The selected contractor will perform various technical assessments, including Manual J, Manual D, Manual S, Appliance, and CO2 audits. Deliverables include detailed electronic audit reports submitted via a secure portal, featuring property photographs and documentation of pre-existing and post-construction conditions. Performance timelines are strict, with standard audits required within two weeks of request and emergency audits scheduled within 24 hours and performed within three business days. Award decisions will be based on the most advantageous offer, with a heavy emphasis on the Statement of Qualification, which requires at least one year of relevant experience and detailed staffing and quality assurance narratives. Contractors must maintain valid professional licenses, adhere to City of Phoenix confidentiality and data protection standards, and ensure all personnel pass Police Department background checks. Compliance requirements include adhering to the Clean Air Act, Federal Water Pollution Control Act, and various nondiscrimination mandates such as Title VI of the Civil Rights Act. Additionally, contractors working outdoors must maintain a written heat safety plan in both English and Spanish. Invoicing is handled electronically in PDF format, with payments issued upon receipt of signed delivery or service tickets.
Neighborhood Services

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 541350
New
Federal
H259-- ELECTRICAL 5-YEAR ARC FLASH STUDY (VA-27-00002938)
Solicitation # 36C25227Q0050
The Department of Veterans Affairs is seeking a firm fixed price contract modification for a comprehensive Arc Flash Hazard Analysis at the Iron Mountain VAMC. The project requires a Registered Professional Electrical Engineer with at least five years of experience to oversee the study, which must comply with NFPA 70E, NFPA 70, and IEEE 1584 standards. The scope encompasses all significant electrical distribution locations from the utility supply down to 208V systems, including switchgear, motor control centers, and panelboards. The contractor will perform data gathering and field verification, a three-phase bolted fault short-circuit study, a protective device coordination study, and the calculation of incident energy and flash protection boundaries. Key deliverables include the installation of machine-printed arc flash warning labels, the adjustment of protective devices, and a final comprehensive report featuring time-current curves, fault current calculations, and updated electrical one-line diagrams in AutoCAD and PDF formats. The contractor must also conduct an exit briefing for facility staff to discuss hazard areas and NEC violations. All work must be completed within 180 days of the notice to proceed, with onsite activities performed during normal business hours. This procurement is intended as a sole source award to SDV Services Inc. under 41 U.S.C. 1901 simplified acquisition procedures to ensure consistency with ongoing electrical testing at the facility.
252-NETWORK Contract Office 12 (36C252)

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 541350
New
Federal
Aviation Operations Center (AOC)- Building Engineer Report (BER)
Solicitation # 15DDHQ27R00000001
Solicitation 15DDHQ27R00000001 is a request for proposals from the Department of Justice, Drug Enforcement Administration, to obtain a Building Engineer Report (BER) for the Aviation Operations Center (AOC) located at Alliance Airport in Fort Worth, Texas. This is a 100% small business set-aside procurement conducted under FAR Part 12 for commercial services, with the government intending to issue a single firm fixed price purchase order. The scope of work requires a comprehensive inspection of the building's interior, exterior, and grounds, covering structural elements, HVAC, plumbing, electrical, life safety, and force protection. Key deliverables include a summarized BER based on a Building Condition Assessment with cost estimates and photographs, a detailed scheduled operations and maintenance plan, and a list of potential energy conservation improvements. Proposals must be submitted electronically to Jose Marin by November 30, 2026, and must be divided into a technical volume and a business volume. The technical volume is limited to 20 pages and will be evaluated based on technical capability, key personnel qualifications, and past performance. These non-price factors are significantly more important than price, although price will be evaluated for reasonableness. Award will be based on the best value to the government. Contractors must comply with strict security requirements, including the submission of Facility Access Request forms, execution of non-disclosure agreements, and completion of mandatory cybersecurity and privacy training. Performance is structured across several tasks, with the final BER due two weeks after the review meeting.
Office Acquisition Management

POSTED

1 day ago

DEADLINE

in about 1 month

General Info

Contract Value

$69,226

NAICS

541350 - Building Inspection Services

Place of Performance

TN

Set-Aside

NONE

Award Issued Date

Documents

6

Alarm+attachment_0002.pdf

PDF

SF+18+SOW+CLAUSES_0001.pdf

PDF

Sol_140P5320Q0037_Amd_0001.pdf

PDF

Sol_140P5320Q0037_Amd_0002.pdf

PDF

Sol_140P5320Q0037_Amd_0003.pdf

PDF

Sol_140P5320Q0037_Amd_0004.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 5, 2020 to Aug 20, 2020. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Ser North Mabo (53000)
Contacts1 person available
OfficeGATLINBURG, TN, 37738, USA
Office AddressGATLINBURG, TN, 37738, USA
Contacts
William Leady

Full Description

Show more
Combined Synopsis/Solicitation for Commercial Items FAR 12.603 General Information Document Type: Combined Solicitation/Synopsis Solicitation Number: Posted Date: 7/15/2020 Original Response Date: 8/14/2020 Current Response Date: 8/14/2020 Product or Service Code: 4210 Set Aside: Total Small Business NAICS Code: 238220 Contracting Office Address Interior Region 2 South Atlantic Gulf DESCRIPTION A. Project: Fire/Intrusion Alarm, Water Based Fire Sprinkler Protection Systems Inspection Contract B. Provide annual NFPA inspection, and testing of 12 dry systems, 4 wet systems, 3 pre action, 1 deluge, 17 back flow preventers, and 1 RPZ which are monitored for fire protection. Inspect and test six RPZ for buildings domestic water supply at five locations Provide annual NFPA inspection and testing for 6 buildings with no sprinkler protection system installed but has fire/intrusions alarm panels that are monitored. The locations are park wide with locations in Manteo NC, Nags Head NC, Kill Devil Hills NC, Buxton NC, Hatteras NC, and Ocracoke NC. 1.01 LOCATION A. Indicate locations. See attached sheet with building name and locations. For information, and directions call Frank Hester +1 (555) 000-0000. 1.02 REFERENCES A. Fire Protection: National Fire Protection Association (NFPA), Current (most recent) edition 1. NFPA 25 - Water based fire protection systems 2. NFPA 72 - National Fire Alarm Code Scope of Work: Automatic Sprinkler System 1.0 GENERAL A. Perform complete code compliant Inspection and Testing on the automatic sprinkler system(s) in the18 buildings. The ITM on the sprinkler system shall be performed based on current National Fire Protection Association (NFPA) 25 and manufacturer requirements. Provide all tools, supplies, equipment, to perform the testing and inspections. B. National Park Service Southeast Regional Structural Fire Manager is the AHJ for the fire protection at this Park. C. Liability: The contractor will be responsible for repairing any damage to the building or contents in the building if the government determines that the damage is a result of poor ITM procedures during the performance of this contract. D. All automatic sprinkler system tests and inspections performed under this contract shall comply with the NFPA 25 including all appendix chapters. E. The Contractor shall leave areas where they perform work neat, clean, and orderly. Spills, dust, debris, material, packaging, etc., caused as a result of the contractor shall be cleaned up or removed by the contractor to the satisfaction of the COR. F. If the inspector encounters equipment that is in a condition that may endanger life or property, the inspector shall immediately notify the CO, COR, and Authority Having Jurisdiction, of the condition requiring immediate action. Within 24 hours the inspector shall provide a written report to the CO, COR, and Authority Having Jurisdiction of the hazardous condition and recommended corrective action. G. Certifications and Qualifications 1. The Contractor shall always have available a enough capable and qualified employees to enable the contractor to properly, adequately, and safely perform all work required under the terms of this contract. 2. Automatic Sprinkler System technicians performing contract work shall hold at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology Inspection and Testing of Water Based Systems. Additionally, the Technician must have experience in the past five years in fire sprinkler system testing, repair, maintenance, installation, and related activities of buildings and equipment comparable to the buildings and equipment covered by this contract. 3. Contractor and subcontractor personnel engaged in the activities specified by this contract shall be required to possess certificates of training, licenses, and permits as required by the state, county, parish, city, and other local jurisdictions when the alarm system is installed in a facility covered by such state, county, parish, city, and other local jurisdictions. 4. The Contractor shall provide to the CO, COR, and Authority Having Jurisdiction documentation of the certificates of training, licenses, and permits for all new employees not later than seven (7) days prior to that person beginning work under the terms of this contract. The Contractor shall insure that all certificates of training, licenses, permits, and bonds are current and valid. All offers must include documentation and proof of the above certifications and qualifications for each employee. 2.0 SCOPE A. The system(s) shall be inspected and tested per current NFPA 25. B. All visits will be made under the direction of the Park Structural Fire Coordinator, or a park designated employee. Scheduling arrangements must be provided at least 1 week in advance. The inspection period normal takes 5 working days to complete. C. No deviations from this SOW shall be made without written authorization from the AHJ. All recommendations are encouraged to be discussed with the Park representatives. D. Before proceeding with any testing, the Contractor shall coordinate the notification of all persons and facilities that receive alarm, supervisory or trouble signals (e.g. COR, facility manager, central station, Fire Department). The Contractor will coordinate with the COTR to ensure that all building occupants are notified. At the conclusion of testing, the Contractor shall notify those previously notified that the testing has been concluded. E. The Contractor is responsible for the fire alarm operation and restoration during the performance of the tests specified in this SOW. F. The Contractor shall ensure that the sprinkler system is always maintained operable except while being tested. It is essential that the contractor carefully schedule with the Building Manager all non-emergency shutdowns of the sprinkler system and that back up fire protection be provided by the contractor any time that the sprinkler system is out of service. In addition, regardless of the duration of the shutdown, the affected portion of the system shall be tested to ensure that the protection has been restored. G. The contractor shall coordinate with the building manager to decide when testing and inspections can be performed. Testing and inspections can be performed during normal business hours when it does not interfere with building operations. When testing and inspections will interfere with building operations; it shall be performed after normal business hours. 3.0 PERFORMANCE A. The service of the fire sprinkler systems will include the points listed below and shall follow NFPA 25 Table 5.1 Summary of Sprinkler System Inspection and Testing. B. As a minimum, Work conducted at annual inspection shall include, but not restricted to: (1) Visual inspection of the general occupancy conditions, environment, and operations related to fire protection. (2) Check for any changes in occupancy status that may affect the performance or reliability of the fire suppression systems. (3) Inspect general storage and stock arrangements in relation to fire sprinkler system effectiveness. (4) Inspect all sprinkler valves for proper position, general condition, accessibility and protection. Test control valves as required to insure satisfactory operation. (5) Inspect control valves. Seal and tag all control valves and clean and lubricate control valve components as required. (6) Inspect priming levels and air pressure on all dry pipe valves. Check and adjust as necessary. (7) Drain and blow out all dry system low points equipped with valve arrangements. (8) Inspect all accelerators and accessories to determine if they are in satisfactory condition. (9) Inspect sprinkler control valve identification signs and security arrangements. (10) Check condition of drain valves, check valve, gauges and related components. (11) Instruct the Park representative on the proper operation, care and maintenance of the fire protection equipment and system as required. (12) Inspect and test 17 back flow preventers and 1 RPZ, (13) Document pass or fail results for each back flow/RPZ (14) Inspect and test six RPZ for building domestic water supply at five locations. (15) Document pass or fail results for each RPZ for each of the six domestic water supply lines. (16) Compile a complete report of the inspection and explain any deficiencies and recommend corrective action to be taken according to recognized care and maintenance standards for each of the six domestic water supply lines. C. As a minimum, work conducted at alarm flow test conducted annual inspections: (1) Inspect and test operation of alarm valves, flow indicators, retard chambers, and accessories for proper operation. (2) Inspect and test all alarm system components for satisfactory condition. Clean and lubricate necessary. D. Work conducted at trip and water flow test conducted once a year as part of the inspection. E. Operations and maintenance manuals, as-built installation drawings, and other system documentation shall be provided by the park to assist in the proper care of the system and its components. (1) Inspect and determine if all portions of the fire sprinkler systems are in service and in satisfactory condition. (2) Inspect all changes or modifications to fire suppression systems ensuring the modifications meet current code requirements. (3) Check the general condition of sprinkler heads. Visually check the heads for any obstructions or coatings that may hinder satisfactory activation and that there is adequate clearance around the heads to allow proper water distribution. (4) Check the general condition of the sprinkler system piping, hangers and related equipment. (5) Inspect fire department connection couplings, caps, threads, clappers, check valves and drain. Lubricate as required. (6) Check the reserve supply of sprinkler heads for proper assortment. (7) Ensure proper fire alarm signaling (supervisory and alarm conditions) (8) Conduct a trip test of all dry valves as described below: - Note location, device number, system and area controlled. - Check for normal air and water pressure prior to test. - Flow tests each system prior to trip to remove obstructive materials from supply piping. - Fully trip and flood each system by utilizing proper test connections. - Check trip point pressures and times to determine satisfactory results. - Check and document the time to flood system and discharge water from proper test outlets. - Inspect the performance of each valve. - Inspect the valve interior, moving parts, rubber facings, seats and other related components. - Clean and reset dry valve, replacing necessary gaskets as required. - Check alarm activation at trip test point. - Drain and dry all low points. - Restore the system back in service. - Check and determine satisfactory operation of accelerators. - Clean, reset and return accelerators to service. - Record the time necessary to re-pressurize the system with air and report any RELATED DEFICIENCIES. 4.0 INSPECTION AND TESTS A. After ITM has been performed on the 20 sprinkler systems and 18 buildings with fire/security alarm panels, the Contractor shall provide for each location: 1. Written certification the equipment has been inspected and tested by a NICET II, Inspection and Testing of Water Based Systems. 2. Written certification the equipment is in proper working order. 3. Completed Record of Inspection and Testing form(s) as outlined in NFPA 25 B. Compile a complete report of the inspection and explain any deficiencies and recommend corrective action to be taken according to recognized care and maintenance standards. Deficiencies shall be noted and accompanied with code citation from NFPA 25. C. One set of hard-copy documents and one electronic copy, for each type of system, will be required at contract completion. D. Document report of site inspections using standard company forms for condition assessment. The report will be used for immediate repairs and future system planning replacement. Scope of Work: Fire Alarm system panels 6.0 GENERAL A. The Statement of Work (SOW) requires the contractor to perform complete code compliant Inspection and Testing on the automatic fire alarm system(s) and intrusion systems in the 24 buildings for 20 sprinkler systems with fire alarm panels and 6 buildings with fire/security alarm panels and no sprinkler protection. The ITM on the fire alarm system shall be performed based on current National Fire Protection Association (NFPA) 72 and manufacturer requirements. The intrusion system shall follow the same testing requirements as the fire alarm requirements. B. In accordance with this SOW and the Task Order, the Contractor shall provide all required site-specific information in the execution of the contract. C. National Park Service Southeast Regional Structural Fire Manager is the AHJ for the fire protection at this Park. D. Liability: The contractor will be responsible for any damages to the building or content if the damage is the result of poor maintenance, or inspection during the performance of this contract. E. The contractor shall provide all tools and supplies necessary to properly perform inspections and tests in accordance with NFPA 72. F. All Fire Alarm Systems tests and inspections performed under this contract shall comply with the most current edition of the NFPA 72 National Fire Alarm Code including all appendix chapters. G. Housekeeping. The Contractor shall leave areas where he performs work neat, clean and orderly. H. Certifications and Qualifications: 1. The Contractor shall always have available a sufficient number of capable and qualified employees to enable the contractor to properly, adequately, and safely perform all work required under the terms of this contract. 2. Fire Alarm Systems technicians performing contract work shall meet NFPA 72's qualifications and hold at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Fire Alarm Systems. Additionally, the Technician must have experience in the past five years in fire alarm system testing, repair, maintenance, installation, and related activities of buildings and equipment comparable to the buildings and equipment covered by this contract. 3. Technicians modifying the fire alarm control panel of systems shall be factory trained and currently certified for the operating system, including software version, of the fire alarm system, and shall provide documentation of this certification per NFPA 72. 4. Contractor and subcontractor personnel engaged in the activities specified by this contract shall be also required to possess certificates of training, licenses, and permits as required by the state, county, parish, city, and other local jurisdictions when the alarm system is installed in a facility covered by such state, county, parish, city, and other local jurisdictions. 5. The Contractor shall provide to the Ordering Official and Authority Having Jurisdiction documentation of the certificates of training, licenses, and permits for all new employees not later than seven (7) days prior to that person beginning work under the terms of this contract. 6. The Contractor shall insure that all certificates of training, licenses, permits, and bonds are current and valid. All offers must include documentation and proof of the above certifications and qualifications for each employee. 7.0 SCOPE A. Services includes the performance inspection and testing of a variety of intrusion, fire alarm and notification systems, equipment and components such as manual alarm devices, smoke and heat detectors, remote and graphic annunciators, main fire alarm panel and components, voice alarm system, speakers and horns and other audible and visual devices, wiring circuits and junctions, all other alarm, detection and control and ancillary devices, and emergency power operations. The system(s) shall be inspected and tested per current NFPA 72 (current edition). B. The Contractor shall ensure that the fire alarm system is always maintained operable except while being tested. It is essential that the contractor carefully schedule with the Building Manager all non-emergency shutdowns of the fire alarm system and that back up protection be provided by the contractor (arrangement of additional personnel stationed at the fire alarm system control panel) any time that the fire alarm system is out of service. In addition, regardless of the duration of the shutdown, the affected portion of the system shall be tested to ensure that the protection has been restored. C. All visits will be made under the direction of the Park Structural Fire Coordinator, or a park designated employee. Scheduling arrangements must be provided at least 1 week in advance. D. No deviations from this SOW shall be made without written authorization from the AHJ. All recommendations are encouraged to be discussed with the Park representatives. E. Before proceeding with any testing, the Contractor shall coordinate the notification of all persons and facilities that receive alarm, supervisory or trouble signals (e.g. COTR, facility manager, central station, Fire Department). The Contractor will coordinate with the COTR to ensure that all building occupants are notified. At the conclusion of testing, the Contractor shall notify those previously notified that the testing has been concluded. F. The contractor shall coordinate with the building manager to decide when testing and inspections can be performed. Testing to be performed during normal business hours when it does not interfere with building operations. When testing interferes with building operations; it shall be performed after normal business hours. G. The Contractor may be required to perform some work, inspections, and tests outside the normal working hours of the building occupants. Any scheduled work that is disruptive to the tenants (testing audible devices, elevator capture, fan shutdown, etc.) shall be performed after the building occupant's normal working hours. The Contractor shall coordinate with the COTR for coordination of after-hours access to the building. H. If the inspector encounters equipment that is in a condition that may endanger life or property, the inspector shall immediately notify the Ordering Official and Authority Having Jurisdiction, of the condition requiring immediate action. Within 24 hours the inspector shall provide a written report to the Ordering Official and Authority Having Jurisdiction of the hazardous condition and recommended corrective action. The Contractor is responsible for the fire alarm operation and restoration during the performance of the tests specified in this SOW. I. Fire Alarm inspection reports shall be submitted to the requesting Park on the - suggested form, as found in NFPA 72 8.0 PERFORMANCE A. The Contractor shall perform a full initial inspection and test of each device on the fire alarm system in accordance with NFPA 72, National Fire Alarm Code. 1. Testing Frequencies from NFPA 72 shall be used. 2. Testing Methods from NFPA 72 shall be used. 9.0 INSPECTION AND TESTS A. Inspection and Testing Records: Within 14 days after completing the inspection and testing, the Contractor will furnish a written record to the COTR that includes the following: 3. Contractor's Inspection and Testing Form that includes all the information required by NFPA 72. 4. Date of manufacture of fire alarm system(s) and whether parts are readily available. 5. The record shall include any problems noted with the system, including inoperable or unsupervised devices or equipment, or devices that cannot be calibrated, tested, or serviced in accordance with the manufacturer's recommendations. 6. A complete system inventory including the intrusion and fire alarm manufacture, number of notification and initiation devices (fire and intrusion) including device type is required. 7. The record shall be provided electronically (by email) if required by the COTR (formatted in Microsoft Word or Excel). B. Compile a complete report of the inspection and explain any deficiencies and recommend corrective action to be taken according to recognized care and maintenance standards. NOTE- any discrepancies found during annual test shall be noted AND accompanied by appropriate code section from NFPA 72 and/or manufacturer's requirements. C. One set of hard-copy documents and one electronic copy, for each type of system, will be required at contract completion. D. Document report of site inspections using standard company forms for condition assessment. The report will be used for immediate repairs and future system planning replacement. 13. Department of Labor Wage Determination- In the performance of this contract the Contractor shall comply with the requirements of U.S. Department of Labor Wage Determination Numbers WD # 2015-4408 DARE&Hyde County which is located online via https://beta.sam.gov/ Award shall be made to the quoter whose quotation the best value to the government, considering technical capability, past performance, and price. The government will evaluate information based on the following evaluation criteria: meeting or exceeding the requirement, past performance, technical capability, and price. The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html. The following solicitation provisions apply to this acquisition: 1. FAR 52.212-1, - Instructions to Offerors'Commercial Items 2. FAR 52.212-2, - Evaluation - Commercial Items 3. FAR 52.212-3, - Offerors Representations and Certifications'Commercial Items Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3, - Offerors Representations and Certifications'Commercial Items. The following contract clauses apply to this acquisition: - FAR 52.212-4, - Contract Terms and Conditions'Commercial Items - FAR 52.212-5, - Contract Terms and Conditions Required to Implement Statutes or Executive Orders The following subparagraphs of FAR 52.212-5 are applicable: 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.222-13, 52.225-13, 52.232-34. Attachment includes a full list of clauses applicable to this solicitation. All quoters shall submit the following: Price quote and specifications. Price shall be broken out for the base and each option year (4) and a total for base and option years. All quotations, shall be emailed to contact@example.gov This is an open-market combined synopsis/solicitation for products as defined herein. The government intends to award a purchase order as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoter shall list exception(s) and rationale for the exception(s). Quoter shall provide lump sum pricing for base and each option year (4). In addition, provide a total for base and option years. Submission shall be received not later than August 14,2020 at 5:00 pm ET. All submissions shall be emailed to contact@example.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the William Leady via email at contact@example.gov. Point of Contact William Leady via email at contact@example.gov

More opportunities from Department Of The Interior → Ser North Mabo (53000)

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS