Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

H259-- ELECTRICAL 5-YEAR ARC FLASH STUDY (VA-27-00002938)

Active
36C25227Q0050Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of Veterans Affairs is seeking a firm fixed price contract modification for a comprehensive Arc Flash Hazard Analysis at the Iron Mountain VAMC. The project requires a Registered Professional Electrical Engineer with at least five years of experience to oversee the study, which must comply with NFPA 70E, NFPA 70, and IEEE 1584 standards. The scope encompasses all significant electrical distribution locations from the utility supply down to 208V systems, including switchgear, motor control centers, and panelboards. The contractor will perform data gathering and field verification, a three-phase bolted fault short-circuit study, a protective device coordination study, and the calculation of incident energy and flash protection boundaries. Key deliverables include the installation of machine-printed arc flash warning labels, the adjustment of protective devices, and a final comprehensive report featuring time-current curves, fault current calculations, and updated electrical one-line diagrams in AutoCAD and PDF formats. The contractor must also conduct an exit briefing for facility staff to discuss hazard areas and NEC violations. All work must be completed within 180 days of the notice to proceed, with onsite activities performed during normal business hours. This procurement is intended as a sole source award to SDV Services Inc. under 41 U.S.C. 1901 simplified acquisition procedures to ensure consistency with ongoing electrical testing at the facility.

General Info

Sole source contract for Arc Flash Hazard Analysis at Iron Mountain VAMC.

NAICS

541350 - Building Inspection Services

Place of Performance

WI

Set-Aside

NONE

Documents

1

Electrical 5-Year Arc Flash Study (36C25227Q0050)

DOCX, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)
Contacts1 person available
OfficeMILWAUKEE, WI, 53214, USA
Office AddressMILWAUKEE, WI, 53214, USA
Contacts
Derrick PaquetteDerrick Paquette

Full Description

Show more

Arc Flash Hazard Analyses Scope of Work
General
Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements
The Arc Flash Hazard Analyses will consist of the following phases or requirements:
Data Gathering and Field Verification
Contractor shall:
Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable):
Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length
Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal.
Data collection requires the removal and/or opening of equipment to field verify data.
Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc.
Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included:
Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard.
The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available.
A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study
Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report.
Arc Flash Hazard Analyses
Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings
Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work
Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include:
Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance
Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study.
Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing
Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include:
Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations.
Submittals
Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following:
Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections:
Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats.
SKM Compatible Data Import Files.
Supplemental Report:
Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications
All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies.
Project Duration Contractor shall complete all work within 180 days of notice to proceed.
Scheduling
Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date.

Similar Contracts

Same NAICS industry code

NAICS: 541350
New
Federal
H399--36C242-27-AP-0524| 528-27-1-6893-0009 Elevator Inspections, Base (4) Canandaigua VA Medical Center (VAMC) & Bath VA Medical Center (VAMC)
Solicitation # 36C24227Q0041
The Department of Veterans Affairs, Network Contracting Office 2, is soliciting quotes for third-party elevator inspection services at the Canandaigua and Bath VA Medical Centers in New York. This SDVOSB set-aside contract requires a Qualification of Elevator Inspectors (QEI)-Certified Inspector to witness and document semi-annual safety inspections, annual pressure and no-load tests, and five-year full-load tests. All work must comply with the most current editions of ASME A17.1 and ANSI/ASME 17.2 standards. Results must be documented using VA Form 10-6166, and the contractor is responsible for verifying that maintenance check charts are current and correctly annotated. The period of performance consists of a base year running from November 1, 2026, to October 31, 2027, with four subsequent 12-month option years, with services typically performed in April and October. Award decisions will be based on technical capability, past performance, and price, with the government reserving the right to use a trade-off process for additional benefits. Offerors must submit a technical capability statement of no more than 10 pages and a statement of acceptance regarding the solicitation terms and conditions by October 29, 2026. The contract incorporates various FAR and VA clauses, including specific requirements for electronic payment, personnel vetting, and supplemental insurance.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 13 hours ago

DEADLINE

in about 17 hours
View Details
NAICS: 541350
New
Federal
Aviation Operations Center (AOC)- Building Engineer Report (BER)
Solicitation # 15DDHQ27R00000001
Solicitation 15DDHQ27R00000001 is a request for proposals from the Department of Justice, Drug Enforcement Administration, to obtain a Building Engineer Report (BER) for the Aviation Operations Center (AOC) located at Alliance Airport in Fort Worth, Texas. This is a 100% small business set-aside procurement conducted under FAR Part 12 for commercial services, with the government intending to issue a single firm fixed price purchase order. The scope of work requires a comprehensive inspection of the building's interior, exterior, and grounds, covering structural elements, HVAC, plumbing, electrical, life safety, and force protection. Key deliverables include a summarized BER based on a Building Condition Assessment with cost estimates and photographs, a detailed scheduled operations and maintenance plan, and a list of potential energy conservation improvements. Proposals must be submitted electronically to Jose Marin by November 30, 2026, and must be divided into a technical volume and a business volume. The technical volume is limited to 20 pages and will be evaluated based on technical capability, key personnel qualifications, and past performance. These non-price factors are significantly more important than price, although price will be evaluated for reasonableness. Award will be based on the best value to the government. Contractors must comply with strict security requirements, including the submission of Facility Access Request forms, execution of non-disclosure agreements, and completion of mandatory cybersecurity and privacy training. Performance is structured across several tasks, with the final BER due two weeks after the review meeting.
Office Acquisition Management

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541350
New
SLED
HSR26-26 Re-Bid #2 Fresno Building Inspection
Solicitation # HSR26-26
The California High-Speed Rail Authority is soliciting informal bids under solicitation HSR26-26 Re-Bid #2 for a comprehensive on-site building inspection and repair recommendation project for its Fresno Office located at 11111 H Street, Fresno, CA 93721. The selected contractor will be responsible for evaluating all major building systems, including plumbing, sewer, drainage, electrical, HVAC, roofing, security, the building envelope, and life-safety and structural components. Key deliverables include a comprehensive written inspection report with supporting photographs, an executive summary of critical risks, a prioritized list of corrective actions, and rough order-of-magnitude cost estimates for all recommended repairs. The project requires personnel knowledgeable in federal, state, and local building codes, as well as current safety and accessibility standards. The response deadline is November 6, 2026, and the solicitation is categorized under NAICS code 541350. Bidders must provide a valid Class A or Class B license from the California Contractors State License Board and submit several required documents, including a cost sheet, payee data record, and bidder certifications. Evaluation is based on cost reasonableness and past performance, with a 3% to 5% incentive applied for Disabled Veteran Business Enterprise participation. The contract includes strict compliance requirements regarding the Authority's Conflict of Interest Code, the Americans with Disabilities Act, and a ten-year confidentiality survival period. Invoicing is permitted monthly in arrears, and the final report is due five business days after the Authority provides feedback on the initial draft.
California High-Speed Rail Authority

POSTED

about 13 hours ago

DEADLINE

in 9 days
View Details
NAICS: 541350
New
SLED
Operation and Management of the Building Department
Solicitation # AD-26-01
The City of Pembroke Pines is soliciting proposals under RFP AD-26-01 for the operation and management of its Building Department. The project utilizes a City-Provided Leadership Model, where the City retains the Chief Building Official and Building Department Operations Manager, while the contractor provides all other necessary administrative, clerical, and technical staff, including Assistant Building Officials, Trade Chiefs, Plan Reviewers, and Inspectors. The selected firm will be responsible for issuing permits, performing inspections, and executing statutory duties in accordance with the Florida Building Code and Broward County Amendments. The contract is for an initial five-year term with one five-year renewal option. Proposals are due by 2:00 pm on November 10, 2026, and must be submitted electronically via the City's e-Procurement Portal. Pricing is based on a proposed percentage of gross revenue derived from building permit fees, with specific daily rates established for key roles such as Assistant Building Officials at 1,500 dollars and Trade Chiefs at 1,000 dollars. Award decisions will be based on the most responsive and advantageous proposal, with preference points available for local Pembroke Pines vendors, Broward County vendors, and Veteran-Owned Small Businesses. Contractors must ensure all personnel have at least three years of relevant experience and hold required state and county certifications. Strict vehicle marking standards are required, including uniform colors and specific City of Pembroke Pines identification. The contractor must also implement a comprehensive Quality Assurance program to track performance metrics such as turnaround times and error rates. Required submittals include a Letter of Intent and a sworn Affidavit of Accuracy.
City Manager's Office

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 541350
New
SLED
OER Solar Quality Assurance Study and Report
Solicitation # RFP27007093
The State of Rhode Island Office of Energy Resources is soliciting a consultant under RFP27007093 to conduct a Quality Assurance Study and Report for the Renewable Energy Growth Program installations from the 2026-2028 program years. The selected consultant will perform on-site assessments by licensed electricians to ensure systems are safe, high quality, and compliant with NEC and state specifications. Key deliverables include a sampling memo for OER approval, standardized inspection reports for installers and homeowners, a customer feedback survey, and a final report presented in person to the DG Board. The initial contract term is three years starting approximately January 1, 2027, with the possibility of two additional 12-month renewals. Award decisions are based on a weighted scoring system of 106 points, requiring a minimum technical score of 55 points to proceed to cost evaluation. Bidders must provide a detailed cost proposal broken down by specific tasks, ranging from small-scale PV inspections to larger wind and hydropower projects. Mandatory requirements include a Supplemental Bidder Attestation regarding conflicts of interest, an ISBE participation plan for MBE, WBE, or Disability Business Enterprises, and professional certifications such as NABCEP. The consultant must also maintain significant insurance coverage, including 2 million dollars in professional liability and 1 million dollars in commercial general liability and automobile liability.
State of Rhode Island

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 541350
New
International
PARK VIEW HEALTH AND WELLBEING CENTRE BUILDING SUPERVISOR SERVICES
Solicitation # CAV-FTS-64586
The Cardiff and Vale University Health Board is seeking a qualified consultant for the provision of Building Supervisor Services for the Park View Health and Wellbeing Centre in Ely, Cardiff. Under solicitation CAV-FTS-64586, the appointed supervisor will act as the Health Board's independent representative on-site, providing quality assurance, compliance monitoring, and reporting throughout the construction, commissioning, and handover phases. Key responsibilities include monitoring workmanship and materials against contract documents, inspecting high-risk and concealed work, and maintaining a detailed quality observation and non-conformance log. The contract is estimated at 140,000 GBP excluding VAT and is scheduled as a 90-week appointment, with an assumed 12-month defects period. The successful tenderer will be appointed under an NEC PSC contract and must adhere to strict reporting timelines, including issuing site visit reports within one working day and escalating urgent safety concerns within two hours. Evaluation for the award is based on a Most Economically Advantageous Tender approach, weighted 60 percent for commercial cost and 40 percent for technical quality. Mandatory insurance requirements include 5 million GBP for Professional Indemnity and Public Liability, and 10 million GBP for Employers Liability. The submission deadline for this open procedure is November 16, 2026, with a particular suitability noted for small and medium-sized enterprises.
Cardiff and Vale University Health Board

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 541350
New
SLED
Third Party Elevator Inspections
Solicitation # 2026-23
The City of Newark, New Jersey, through the Division of Central Purchasing, is soliciting proposals under solicitation number 2026-23 for a Private On-Site Inspection Agency to provide third-party elevator subcode enforcement services. The selected contractor must be authorized by the New Jersey Department of Community Affairs and operate in accordance with N.J.A.C. 5:23-4.14 and the NJBIC. The scope of work requires the agency to provide on-call inspectors under the guidance of the City Construction Code Official, with a minimum staffing requirement of one Elevator Sub-Code Official and at least two full-time elevator inspectors assigned to Newark. The agency must maintain an office staffed at least 40 hours per week and conduct monthly performance review meetings with City representatives to monitor service quality and workload. The contract is for an initial term of three years, with the possibility of two additional one-year renewal terms, totaling a maximum of five years. Proposals must be submitted electronically via the OpenGov e-Procurement Portal by November 24, 2026, at 2:00 pm. Submissions must be divided into a separate technical proposal and cost proposal, accompanied by various certifications, including W-9, Federal Debarment, and disclosures regarding Iran and Russia-Belarus activities. Award decisions will be based on the most advantageous offering that best meets the City's needs, with a focus on responsiveness and the standards of responsibility. Failure to provide required information or submitting inadequate pricing may result in a proposal being deemed non-responsive.
Division of Central Purchasing

POSTED

2 days ago

DEADLINE

in 27 days
View Details
NAICS: 541350
New
International
Depot Fire Break & Void Detection Surveys
Solicitation # ocds-h6vhtk-079033
Thameslink Southern Great Northern Limited (TSGN) is seeking a contractor to address fire safety non-compliances across several depots. The project focuses on reviewing existing fire prevention measures within ceiling voids, including fire stopping and fire breaks. The primary deliverable is a comprehensive scope of works for roof void fire protection, which must include fire breaks, fire stopping for existing walls, and a detailed review of void protection aligned with the current fire alarm system. The contract is divided into three geographical lots: Lot 1 covers Bedford, Peterborough, Letchworth, and Welwyn; Lot 2 covers Selhurst, Battersea, Hornsey, Streatham Hill, and Cricklewood; and Lot 3 covers Brighton, Bognor Regis, Hove, Littlehampton, and Horsham. The total estimated value of the project is 540,000 GBP including VAT, with individual lot estimates ranging from 168,000 GBP to 204,000 GBP. The estimated period of performance is one year, from April 26, 2027, to April 25, 2028. Award decisions will be based on a competitive flexible procedure, with evaluation weighted at 60 percent for technical quality and 40 percent for the commercial pricing proposal across all lots. The opportunity is open to small and medium-sized enterprises (SME), and all submissions must be made in English via the electronic portal.
Thameslink Southern Great Northern Limited (TSGN)

POSTED

2 days ago

DEADLINE

N/A
View Details

More opportunities from Department Of Veterans Affairs → 252-NETWORK Contract Office 12 (36C252)

Same awarding agency

NAICS: 333415
New
Federal
36C25227Q0048 - COOLERS AND FREEZER
Solicitation # 36C25227Q00480001
Solicitation 36C25227Q0048 is a combined supply contract issued by the Department of Veterans Affairs, Great Lakes Acquisition Center, for the provision and on-grade installation of an indoor walk-in cooler and freezer system at the Captain James A. Lovell Federal Health Care Center in North Chicago, Illinois. The required unit measures 44 feet 6 3/4 inches by 31 feet 7 inches by 8 feet 6 inches, featuring specific panel thicknesses of 5 1/2 inches for freezer walls and ceilings and 4 inches for cooler walls and ceilings. The system must be constructed with 2021 IEC C403.11 compliant wood frame panels and include various accessories such as vapor proof lights, heated vents, dial flush thermometers, and an exterior ramp. This procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Eligible offerors must be listed in the SBA certification database and comply with strict limitations on subcontracting, ensuring that no more than 50 percent of the contract value is paid to firms that are not certified SDVOSBs or VOSBs. The solicitation has undergone three modifications to add technical drawings, incorporate site visit and Q&A details, and extend the final response deadline to November 6, 2026, at 10:00 a.m. CT. Offerors are required to certify their status as either a domestic manufacturer or a nonmanufacturer supplying a domestic small business product to be considered for award.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

about 13 hours ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS