Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 20, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

5 Year Inspection & Tesing of CHB, CHB UPA and PMB Sprinkler Systems

Closed
WA-FY11-AR-583Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 922160
SLED
2026 Volunteer Fire Capacity Grant
Solicitation # 2139681
The New York State Department of Environmental Conservation is administering the 2026 Volunteer Fire Capacity Grant Program, funded by a federal appropriation of 857,629 dollars. This program provides matching grants to eligible rural fire departments for the purchase of wildland firefighting suppression supplies. To be eligible, departments must be comprised of at least 80 percent volunteer personnel and serve a rural area, defined as a town or village with a population of 10,000 or less based on the 2020 Census. Selected departments can receive a maximum award of 3,500 dollars, which must be matched 50/50 by the recipient. Grant funds must be used for items directly related to wildland firefighting that benefit the local rural community, with a restriction that no individual item exceeds 9,999 dollars. Selection is based on the department's funding history over the previous five years, whether it is a newly formed establishment, and the presence of a Native American community within its jurisdiction. The program operates under federal guidelines from the US Forest Service and the Cooperative Forestry Assistance Act of 1978. Applications are accepted through December 30, 2026. This solicitation does not have specific goals for Service-Disabled Veteran-Owned, Minority, Women, or Disadvantaged Business Enterprises. All inquiries and applications are managed by the Volunteer Fire Capacity Grant Coordinator within the Division of Forest Protection.
NYS Department of Environmental Conservation

POSTED

9 days ago

DEADLINE

in 2 months

General Info

NAICS

922160 - Fire Protection

Place of Performance

3580 Morrisville Road, ANNISTON, AL, 36201, USA

Set-Aside

NONE

Documents

1

RFQ WA-FY11-AR-583: 5 Year Inspection and Testing of CHB, CHB UPA and PMB Sprinkler Systems

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W4MM USA Joint Munitions Command
Contacts1 person available
OfficeANNISTON, AL, 36201-5000, USA
Office AddressANNISTON, AL, 36201-5000, USA
Contacts
Ashley RollinsSubcontract Specialist

Full Description

Show more
1. Disassemble each pre-action valve and replace the rubber seat assembly Viking #02176B, rubber diaphragm Viking #1974, and clapper assembly Viking #05703B. All parts are to be provided by the contractor. - 2. Reassemble each valve and place back in service. These are dry sprinkler systems; if the header contains water, the system shall be drained and left in a dry condition. - 3. Replace all gauges on the CHB, CHB UPA and PMB sprinkler risers and air compressors. - a. 6 each 4" face, 0-300 psi, " NPT bottom fed, water service - b. 3 each 4" face, 0-300 psi, " NPT bottom fed, air service - c. 2 each 0-100 psi, " NPT back fed, air service - 4. The contractor shall at the completion of each test, provide ANCDF with written documentation stating each pre-action valve meets all NFPA requirements and provide documentation stating that all gauges have been replaced. - 5. An inspection card provided by the contractor shall be updated after each inspection and placed at each riser. - 6. ANCDF will provide the contractor with the date each inspection is scheduled. The contractor shall be responsible to have a certified technician on-site for each scheduled inspection. Contractor shall provide WA Subcontract Administrator documentation within (5) days of the inspection and testing results for recordkeeping. Contractor will participate in the pre-job briefings to ensure that good communications are established with ANCDF Subcontracts, Engineering, Maintenance and Operations departments before any work begins. Extreme caution shall be taken to ensure that unplanned outages due not occur.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS