Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on June 18, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

54--Supply and Deliver to the Ives Run Recreation Area and Tompkins Campground a Floating Mooring Dock System and a Boat Launch Floating Dock with Gangway for Tioga Hammond/Cowanesque Lake Facility, Tioga, PA

Closed
W912DR-07-T-0073Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This presolicitation involves the supply and delivery of a floating mooring dock system and a boat launch floating dock with a gangway for the Tioga Hammond/Cowanesque Lake Facility, specifically serving the Ives Run Recreation Area and Tompkins Campground in Tioga, Pennsylvania. The project is managed by the Department of Defense through the W2SD Endist Baltimore office. The opportunity is designated as a total small business set-aside under NAICS code 444190. It is important to note that the original announcement was cancelled due to a clerical error regarding the Request for Quotations number, which was incorrectly listed as W912DR-07-T-0073 and corrected to W912DR-08-T-0073.

General Info

Small business contract for floating mooring docks and boat launches in Tioga, Pennsylvania.

NAICS

444190 - Other Building Material Dealers

Place of Performance

US Army Corps of Engineers, Baltimore (FOR) Tioga Hammond/Cowanesque Lake Facility 10 South Howard Street, Baltimore MD 21203 , MD

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 4:00 PM UTC on Jun 30, 2008. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
ContactsNo contacts available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
ContactsNo contact information available

Full Description

Show more
54-The previous FBO announcement is hereby cancelled because the Request for Quotations number was erroneously recorded as W912DR-07-T-0073 and should have been W912DR-08-T-0073. The request for quotations bid package will be posted correctly again.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
The Mid-Bay James Island Restoration Phase 2 is a firm fixed price construction project managed by the U.S. Army Corps of Engineers, Baltimore District. Located in Dorchester County, Maryland, this ecosystem restoration effort takes place in a remote area of the middle Chesapeake Bay accessible only by boat. The project has an estimated magnitude of construction between 150 million and 250 million dollars, with an anticipated period of performance of 1095 calendar days from the date of the Notice to Proceed. The scope of work involves three primary features: the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand; the excavation and stockpiling of approximately 650,000 cubic yards of sand from a local borrow area; and the installation of spillway structures for controlled water release. Key material requirements include various weights of armor stone ranging from 450 to 3300 pounds. The contractor is responsible for all labor, equipment, and transportation, and must maintain a Quality Control Manager on-site at all times. Administrative requirements include the submission of bids via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Award evaluations include a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to safety and environmental regulations, including EPA 40 CFR 112 for POL products and EM 385-1-1 for safety and health. Additionally, the contractor must conduct formal partnering sessions within 35 to 45 days of the award and provide necessary performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS