5th, 6th, 7th Street Decoupling

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 5th, 6th, 7th Street Decoupling project is a forecast for the design and construction of infrastructure upgrades and roadway improvements for the City of Long Beach, California. Managed by the Department of Public Works, the project is located within the public right-of-way, specifically covering 5th Street from Golden to Alamitos, as well as 6th and 7th Streets from Daisy to Alamitos. The scope of work includes the installation of Portland cement concrete pavement, asphalt pavement, crushed base, curbs, gutters, and sidewalks. Additional deliverables involve the construction of driveways, alley entrances, bus pads, and bulbouts, along with roadway resurfacing and the restoration of traffic striping and markings. The project also encompasses significant drainage and safety enhancements, including storm drain system upgrades, the installation of biofilters, and the reconstruction of manhole frames and curb drains. Signal modifications and general safety upgrades are required to bring all existing facilities up to the latest code requirements. This project is classified under NAICS code 237310 and has been granted a CEQA Notice of Exemption as it focuses on the maintenance and restoration of existing infrastructure without expanding its use or capacity. Primary points of contact for the project include Planner Manraj Guliani Bhatia and Senior Civil Engineer Alireza Vatanshenas.

General Info

Long Beach to upgrade 5th-7th Streets infrastructure with pavement, sidewalks, storm drains, and signal improvements under CEQA exemptions.

Agency

California → City of Long Beach

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Long Beach, CA, 90802

Set-Aside

NONE

Documents

(1)

CEQA Notice of Exemption for 5th, 6th, 7th Street Decoupling Project

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Long Beach
Office AddressN/A
Contacts
Manraj Guliani BhatiaPlanner
Alireza VatanshenasSenior Civil Engineer

Full Description

Show more
Roadway improvements include the design and construction of infrastructure upgrades such as sidewalks, curbs, gutters, driveways, alley entrances, bus pads, and roadway resurfacing. The work typically involves installing Portland cement concrete pavement, curbs, gutters, sidewalks, asphalt pavement, and crushed base, along with grading and surface removal. Additional tasks include adjusting or reconstructing manhole frames, curb drains, and storm drain connector pipes, as well as restoring traffic striping and markings, include storm drain system upgrade, striping and safety upgrades, signal modifications, bulbout, biofilter etc.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS