Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on October 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

5W Pulse Tube CryoCooler

Closed
Federal
Submission Closed
Solicitation #
RFP_387931RLP

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Fermi Forward Discovery Group, LLC (FFDG) is soliciting firm-fixed price proposals for the procurement of one 5W Pulse Tube Cryocooler to support the Illinois Accelerator Research Center at Fermilab. The system is intended to provide conduction cooling for a Niobium-Tin coated superconducting RF cavity to reach temperatures of 4.2K. To minimize vibrations, a pulse-tube configuration is specifically required. The complete assembly must include a cold head, compressor, gas lines, vibration dampening bellows, and all necessary instrumentation and power cables. Technical constraints include a maximum power consumption of 30kW, a mounting flange diameter of 10 inches maximum, and specific height limits for the room temperature side (30 inches max) and cold side (20 inches max), with compressor dimensions not exceeding 6ft x 6ft x 4ft. The solicitation is a best value source selection, defined as the lowest price from technically acceptable and responsible offerors. Proposals are due by October 28, 2026, and must include a formal quote on company letterhead, a completed RFP form, Subcontractor Annual Representations and Certifications, and Proposal Certifications. Delivery is required F.O.B. Fermilab to the receiving warehouse in Batavia, Illinois, with all freight charges included in the quote. Awardees must comply with various federal regulations, including the Buy American Act, E-Verify enrollment, U.S. export control laws, and provisions combating trafficking in persons.

General Info

FFDG seeks proposals for one 5W Pulse Tube Cryocooler for Fermilab by 2026.

NAICS

339999 - All Other Miscellaneous Manufacturing

Place of Performance

Batavia, IL, 60510, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstsupporting-documents
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityrepresentations-and-certifications
Low

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

20 mandatory

21 requirements in 6 areas

  • Submission8 · 7 must
    001

    Submission of Proposal Certifications

    Contract notice
  • Eligibility6 · 6 must
    009

    Entity Ownership Disclosure

  • Technical3 · 3 must
    018

    Pulse-Tube Configuration Requirement

  • 18 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 21 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Military-Grade Packaging and MarkingOpen now, due in 8 days
  • Seal Assembly Fabrication and SupplyOpen now, due in 15 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Fermilab - DOE Contractor
Contacts1 person available
OfficeBatavia, IL, 60510, USA

Full Description

Show more

Please provide proposal for the attached request for proposals (RFP 387931RLP) for project “5W PULSE TUBE CRYOCOOLER” by the due date to allow proper documentation completion.


Proposal packages must include


  1. Formal quote on company letterhead with description/specification of product(s)
  2. Completed RFP form
  3. Completed Subcontractor Annual Representations and Certifications
  4. Completed Proposal Certifications

Answers to questions may be posted during proposal opening time, viewers should be aware of any changes.

More opportunities from Department Of Energy → Fermilab - DOE Contractor

Same awarding agency

NAICS: 236220
New
Federal
Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade
Solicitation # 385515GMK
Fermilab has issued solicitation 385515GMK for the fire rating and mechanical upgrade of the Electric and Elevator Machine Rooms located on Floor 16 of Wilson Hall in Batavia, Illinois. The scope of work includes the installation of 2-hour rated walls and ceilings using Type X gypsum wallboard, sealing all penetrations between 1/4 inch and 6 inches, and the installation of a new AC-5 condenser on the East observation deck roof. The project requires the use of medium-weight CMU for fire-rated infill and adheres to strict technical standards, including TMS 602/ACI 530.1/ASCE 6 for masonry and AWS D1.1/D1.1M for structural welding. This is a Small Business Set Aside - Total. The procurement process includes a site visit and a series of amendments that have updated the project exhibits and Q&A logs. Proposals must be submitted electronically to Gina M. Kern by 3:00 pm CST on December 9, 2026. Key requirements include a two-year labor warranty from the date of substantial completion and the use of a professional engineer licensed in the State of Illinois for delegated design and PE-sealed submittals. Additionally, the contractor must engage the manufacturer's service representative to witness testing and inspect the Variable Refrigerant Flow HVAC system installations.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 10 days
View Details
NAICS: 236210
Federal
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Solicitation # RFP-376508-CD
The Central Utility Building (CUB) Addition and Renovation project, designated as UIP Subproject 1-CUB, involves the expansion and revitalization of the CUB at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the construction of a building addition to accommodate new chillers, selective demolition of existing infrastructure, and comprehensive upgrades to the heating hot water, chilled water, and electrical systems, including the installation of medium voltage switches and transformers. The project is critical to Fermilab's mission as the CUB provides essential utility services to various lab buildings. This is a firm-fixed-price contract with no set-aside used. Construction is strictly constrained by the accelerator shutdown window, with on-site efforts anticipated to start on January 1, 2028, and conclude by January 1, 2030, with a final completion deadline of October 1, 2029. Key milestones include the issuance of the Notice to Proceed by December 30, 2027, and the completion of the CUB extension and upgrades by September 28, 2029. Award selection is based on a best-value tradeoff method where technical factors are significantly more important than price. Offerors must meet stringent pass-fail requirements, including a minimum current ratio of 1.20, an aggregate bonding capacity of at least $100 million, and the provision of audited financial statements for the past three fiscal years.
Industrial Building Construction

POSTED

10 days ago

DEADLINE

in 18 days
View Details
NAICS: 332999
Federal
WFE Solenoid/Corrector Magnet Spares
Solicitation # 389116swk
Fermilab, managed by the Fermi Forward Discovery Group (FFDG) for the Department of Energy, is soliciting proposals for the design, manufacturing, fabrication, and delivery of two solenoid magnets with integrated dipole corrector magnets. These components are critical for steering, focusing, and matching a 30 keV H+ beam from an ion source into a Radio Frequency Quadrupole accelerator. The scope of work includes comprehensive quality control, magnetic testing, and the provision of detailed documentation such as final design reports, material certifications, and QC fabrication and inspection plans. Deliverables must be shipped F.O.B. Fermilab in a single batch, with strict packaging requirements to prevent corrosion and structural damage, including the use of shock indicators for loads exceeding 10 G. The procurement utilizes a best value trade-off source selection process, where technical proposals, infrastructure capabilities, schedule (via Gantt chart), and past experience are weighted as significantly more important than cost. Proposals are due by January 5, 2027, at 5pm Central, with a prior question deadline of November 30, 2026. Awardees must undergo a series of program reviews, including an initial kickoff, a Preliminary Design Review at 50% maturity, and a Final Design Review at 90-100% maturity before production begins. There is no specified set-aside status for this solicitation.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

12 days ago

DEADLINE

in about 1 month
View Details
NAICS: 23822
Federal
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
Solicitation # 378854_MR
This project involves the fabrication and installation of a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room at the Fermi National Accelerator Laboratory in Batavia, Illinois. The scope of work includes the installation of two 50 hp centrifugal pumps, a shell and tube heat exchanger, a 250-gallon expansion reservoir tank, and various process loop equipment such as a deionization skid, particulate filter, and dissolved oxygen removal skid. The contractor is responsible for providing all piping, hardware, process instrumentation, structural supports, and foundation bases, as well as performing electrical installations. The project is unrestricted and will be awarded based on a lowest price-technically acceptable (LPTA) selection process. The period of performance is 180 calendar days from the receipt of the Notice-to-Proceed. Key technical requirements include compliance with ASME B31.3 and B31.9, as well as Fermilab's specific pressure testing and piping manuals. Contractors must provide a project-specific quality control plan and adhere to strict safety standards, including 10 CFR 851 and FESHM Chapter 7010. Proposals must be submitted in two separate parts—technical and business/price—by December 3, 2026, at 2:00 p.m. CDT. Required certifications include the Buy American Act, DEI discrimination compliance, and the provision of performance and payment bonds. Access to the secured DOE site requires U.S. citizenship, a REAL ID, and an access request submitted at least seven days in advance.

POSTED

13 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS