61--REPLACE MELROSE BACKUP GENERATOR
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This is a total small business set-aside opportunity for the Department of the Interior to replace the backup generator at Melrose. The current contract, held by Collins Power Systems Inc. with a value of 76,515 dollars, is expected to end on November 1, 2026. The government is seeking a complete turnkey, firm-fixed-price solution that includes all labor, materials, installation, electrical integration, and commissioning. Materials-only quotes will not be accepted. The scope of work specifically excludes the replacement of the roof structure and the wiring from the building electrical panel to the transfer switch, although contractors must include the cost of temporarily removing and reinstalling the roof if necessary for installation. The contractor is responsible for providing and installing a new generator exhaust that meets all codes and manufacturer requirements. Additionally, the contractor must submit physical color samples for approval to ensure the equipment blends with the historic site context, with specific green tones suggested for consideration. The bid due date has been extended to May 13, 2026.
General Info
Place of Performance
MS, 391203801, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Current Contract: 140P5226P0037 Incumbent: COLLINS POWER SYSTEMS INC. Contract Value: $76,515 Potential End Date: 2026-11-01T00:00:00.000Z Competition: COMPETED UNDER SAP Pricing: FIRM FIXED PRICE Classification: recompete-likely (Confidence: medium - 55/100)
Amendment 0002: Extend Bid due date to May 13,2026 2:00 PM CT.
1. Consider a quote for materials only.
No. The Government will not consider a materials-only quote for this requirement.
The solicitation is for a complete firm-fixed-price generator replacement, including all labor, materials, tools, equipment, supervision, removal of existing equipment, installation, electrical integration, commissioning, load testing, training, and closeout documentation.
Offerors must submit a complete turnkey quote that satisfies the full Statement of Work. Materials-only pricing will not be considered responsive to the solicitation.
All other terms and conditions of the solicitation and Statement of Work remain unchanged.
2. Please advise if replacing the roof structure and new generator exhaust shall be included in the SOW as an alternate.
The existing generator roof/cover structure is not identified in the Statement of Work for replacement. The Government does not intend to add replacement of the roof/cover structure as an alternate at this time.
The existing roof/cover structure is bolted to the supporting steel posts and can be temporarily unbolted and removed, if necessary, to allow removal of the existing generator and installation of the new generator. The contractor shall field-verify existing conditions and determine the means and methods necessary to perform the work. If the contractor determines that temporary removal of the existing roof/cover structure is necessary, the contractor shall include temporary removal and reinstallation of the existing roof/cover structure in its price. If temporarily removed, the existing roof/cover structure shall be protected from damage and reinstalled in its current configuration unless otherwise directed by written solicitation amendment.
Replacement of the roof/cover structure is not included in the current scope.
The new generator exhaust shall be provided and installed in accordance with the generator manufacturer¿s requirements, applicable codes, and the Statement of Work. The contractor may reuse existing exhaust routing/components only if compatible with the new generator, manufacturer requirements, and applicable code. Any required exhaust modifications necessary for a complete, operational, code-compliant installation shall be included in the contractor¿s price.
3. Is there a requirement to replace the wire from the building electrical panel to the transfer switch?
Replacement of the existing wire from the building electrical panel to the transfer switch is not included in the Statement of Work.
The existing underground/building feeder route is located within the historic site context and is not intended to be removed, replaced, or re-routed under this contract. The contractor shall not disturb historic ground or replace the existing building-to-transfer-switch wiring unless specifically directed by written solicitation amendment.
The contractor remains responsible for making the required exterior equipment connections, terminations, grounding/bonding, and code-compliant installation of the new generator and automatic transfer switch using the existing service conditions provided. Any work shall be limited to the generator/ATS replacement scope identified in the Statement of Work.
4. Sherwin-Williams is asking what the exact color number is that the end-user is looking for, if they have a specific manufacturer's color in mind.
The contractor should submit actual color samples or manufacturer color documentation for review before ordering. The color needs to be reviewed in context with the Melrose setting and existing site conditions before final approval.
Of the colors listed, Bottle Green 6007, Moss Green 6005, and Pine Green 6028 appear to be the closest options for consideration. Emerald Green 6001 appears less appropriate based on the name and general color tone, but final determination should be based on actual samples.
The Government is not identifying a specific manufacturer¿s color at this time. Final color approval should remain subject to COR review of submitted color samples/documentation prior to ordering.
Similar Contracts
Same NAICS industry code
More opportunities from Department Of The Interior → Ser WEST(52000)
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS