Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

6111,6131, 6135 West Mulholland Highway (ENV-2024-6289-CE)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project, identified as case ENV-2024-6289-CE, involves the addition of 2,038 square feet to an existing 1,995 square-foot single-family residence located at 6111, 6131, and 6135 West Mulholland Highway in Los Angeles, California. Situated within the Hollywood Community Plan and Hollywoodland Specific Plan, the project will increase the dwelling height from 16 feet to 29 feet 7 inches on an approximately 15,244 square-foot lot. The scope includes 280 cubic yards of cut and 270 cubic yards of export, with no protected trees being removed. The City of Los Angeles Department of City Planning has issued a Notice of Exemption under CEQA Guidelines Section 15303 for small structures. The project is subject to rigorous regulatory compliance measures due to its location in a Very High Severity Zone and a hillside area. Key requirements include adherence to the Baseline Hillside Ordinance, California Building Code seismic standards, and Fire Code brush clearance requirements. The applicant, DSH Real Estate Holding, LLC, must submit geotechnical reports from a registered civil engineer or certified engineering geologist to the Department of Building and Safety to address landslide risks, subsidence, and expansive soils. Additionally, the project requires approvals from the Los Angeles Fire Department for fire safety and access, as well as compliance with Bureau of Engineering and Bureau of Sanitation standards for drainage and sewer availability.

General Info

DSH Real Estate Holding LLC adding 2,038 square feet to Los Angeles residence.

Agency

California → City of Los Angeles

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Yasmin DiazPlanning Assistant
Derrick FlynnRepresentative

Full Description

Show more
The proposed project is for the addition of 2,038 square-feet to an existing 1,995 square-foot single-family dwelling with an attached garage and pool on an approximately 15,244 square-foot lot. The project site is located at 6111, 6131, and 6135 West Mulholland Highway within the Hollywood Community Plan and the Hollywoodland Specific Plan. The project proposes a change in height from the existing 16 feet to 29 feet and seven (7) inches. The subject site is an irregularly shaped lot accessed by Mulholland Highway. Mulholland Highway is a substandard hillside limited street with a roadway width of 20 feet and a right-of-way width of 48 feet. The project proposes the following approximate grading quantities: 280 cubic yards of cut, 10 cubic yards of fill, 0 cubic yards of import, and 270 cubic yards of export in total. The project does not propose the removal of any protected trees.

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
SLED
solicitation A10-05-26-9215- Bid 2- Housing Rehab- Nowata County
Solicitation # A10-05-26-9215
Solicitation A10-05-26-9215 is a request for bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a residential property located at 506 N Maple St in Nowata County, Oklahoma. The scope of work includes carpentry, drywall, electrical, flooring, paint, and plumbing, with specific tasks such as interior wall framing in a bathroom, metal fascia installation, and the construction of a wheelchair ramp and pressure-treated wood decking. The project must be completed within 45 working days, with work commencing within two weeks of notification. A liquidated damages fee of 100 dollars per working day will be applied for extensions beyond the contract end date. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit a completed Mandatory Bid Response sheet, a bid breakdown sheet, and a work write-up by October 23, 2026. Required documentation includes HUD Form 5369-A, a previous participation certificate, a non-collusive affidavit, and a drug and tobacco-free workplace statement. Preference is given to TERO-certified Indian organizations. Because the home has tested positive for lead-based paint, contractors must follow safe work practices and provide RRP certifications where applicable. Compliance requirements include adherence to Davis-Bacon Wage Rate OK20260005 and the Buy American Recovery Act for iron, steel, and manufactured goods. The successful contractor must provide a certificate of insurance and a one-year warranty against faulty materials or workmanship. Payment is structured in two installments: a minimum of 50 percent upon an inspection report and the final balance upon the submission of a Statement of Completion and approval by the HACN Inspector.
Cherokee Nation Housing Authority

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 236118
New
SLED
Solicitation A10-10-26-9659- Housing Rehab- Adair County
Solicitation # A10-10-26-9659
Solicitation A10-10-26-9659 is a request for bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of a single residential unit built in 1972 located in Adair County, Oklahoma. The comprehensive scope of work includes carpentry, drywall, electrical, flooring, HVAC, plumbing, roofing, paint, and thermal protection. The project must be initiated within two weeks of notification and completed within 45 working days from the issuance of the Notice to Proceed. Failure to meet the completion deadline will result in liquidated damages of 100 dollars per working day. The contract will be awarded to the lowest responsive and responsible bidder. Essential submission requirements include a completed Mandatory Bid Response sheet, a Bid break down sheet, a Work Write-Up, and Form HUD-5369-A. Preference is given to TERO certified bidders. The project is subject to the Davis-Bacon Act and Buy American provisions, requiring all iron, steel, and manufactured goods to be produced in the United States. Because the home tested positive for Asbestos Containing Material, contractors must adhere to EPA NESHAP and OSHA safety standards. Payment is structured with a minimum 50 percent payment upon an initial inspection report and final payment upon 100 percent completion and acceptance by the HACN Inspector. Bidders must provide proof of Workers Compensation, Commercial General Liability, and Automobile Liability insurance. Performance and payment bonds are required, either as a single bond for 100 percent of the contract price or separate bonds of at least 50 percent each. All bids must be submitted via email or hand delivery by October 21, 2026, at 5:00 P.M.
Cherokee Nation Housing Authority

POSTED

2 days ago

DEADLINE

in 17 days
View Details
NAICS: 236118
New
SLED
Solicitation A10-10-26-9663- Housing Rehab- Sequoyah County
Solicitation # A10-10-26-9663
Solicitation A10-10-26-9663 is a Request for Bids issued by the Housing Authority of the Cherokee Nation for the rehabilitation of one home located in Sequoyah County, Oklahoma. The scope of work encompasses carpentry, drywall and finish, flooring, paint and finish, and plumbing. The project must be completed within 14 working days, with work commencing within two weeks of notification. Failure to meet the completion deadline will result in liquidated damages of 100 dollars per working day. Payment will be issued as a single lump sum of 100 percent upon the submission of all closing documents and the formal acceptance of work by an HACN inspector. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including the bidder's current project load, history of on-time completion, quality of previous work, and any outstanding warranty issues. Bidders must submit a completed Mandatory Bid Response form, a non-collusive affidavit, and a drug and tobacco-free workplace statement by October 21, 2026. Preference is given to TERO-certified bidders. Compliance requirements include adherence to Tribal rules, OSHA safety standards, the Davis-Bacon Act for contracts over 2,000 dollars, and Buy American provisions for iron, steel, and manufactured goods. Awarded contractors must provide insurance certificates, a core crew list, and special trade licenses within three days of notification.
Cherokee Nation Housing Authority

POSTED

2 days ago

DEADLINE

in 17 days
View Details
NAICS: 236118
New
SLED
Solicitation A10-09-26-9570- Bid 2- Housing Rehab- Adair County
Solicitation # A10-09-26-9570
The Housing Authority of the Cherokee Nation is soliciting bids for the carpentry and roofing rehabilitation of a single-family home located in Adair County, Oklahoma. The project scope includes structural repairs to ceiling joists and rafters, as well as the installation of shingles, sheathing, drip edges, and fascia. All work must be completed within 20 working days, with a requirement to commence within two weeks of notification. Failure to meet the completion deadline will result in liquidated damages of $100.00 per working day. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including the contractor's current project load, history of on-time completion, quality of previous work, and any outstanding warranty issues. Bidders must submit a fully completed Mandatory Bid Response sheet, a Work Write Up, and HUD Form 5369-A by October 23, 2026, at 5:00 P.M. To be considered responsive, a site visit with the inspector is required. Preference will be given to bidders who provide proof of certification from the Cherokee Nation Tribal Employment Rights Office (TERO). The successful contractor must comply with Tribal rules, HUD general conditions, and the Buy American Recovery Act, ensuring all iron, steel, and manufactured goods are produced in the United States. Additionally, the project is subject to Davis-Bacon Act prevailing wage rates under determination OK20260005 and requires comprehensive insurance coverage, including Workers' Compensation, Commercial General Liability, and Automobile Liability.
Cherokee Nation Housing Authority

POSTED

2 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS