69--Answers to Questions from Industry

Active
M6785407R8005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract addresses the provision of underwater egress and surface water survival training services across four government sites, with a base period beginning January 1, 2009, initially including a one-month mobilization phase followed by service periods of up to twelve months for various tasks. The scope encompasses multiple specialized training programs including SWET (Surface Water Egress Training), MAET (Modular Amphibious Egress Trainer), and SVET, as well as repairs and refurbishments of training devices such as IPHABDs and sea modules. The contractor is responsible for supplying personnel, training, maintenance, and technical support, with some government-provided facilities and equipment. Several contract line items (CLINs) were clarified or revised to properly reflect periods of performance, pricing units, and scope of work, such as distinguishing between training offered at different sites, specifying quantities for equipment panels, and eliminating surge personnel CLINs. Key administrative and procedural details are outlined, including the requirement for revised final RFP provisions on contract start dates, proposal submission deadlines, and small business participation plans aligning with the total small business set-aside status. The contract requires contractor adaptability to modify or expand the training curriculum in coordination with government-approved subject matter experts, while government documents and technical data packages pertinent to the training devices will be provided with the final RFP. Clarifications were also made regarding personnel qualifications, including the necessity for certain certifications and experience levels, with adjustments planned to avoid unfair limitations linked to incumbent vendor-specific certifications. The contractor will not be responsible for facility maintenance such as pool upkeep or hazardous material resources, and no overtime will be authorized for modifications installation. Oversight and review meetings will be held at all training sites, and the government retains responsibility for approval authority relating to curriculum and modifications.

General Info

Underwater egress and survival training services at four sites with equipment maintenance and government oversight.

NAICS

611512 - Flight Training

Place of Performance

VA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

9 updates
PhasePresolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline added: Jun 27, 2008. The notice title changed. NAICS code added: 611512. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The response deadline was removed. The notice title changed. Set-aside removed. The notice description changed.

Notice updated

The notice title changed. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Commander
ContactsNo contacts available
OfficeQUANTICO, VA, 22134-6050, USA
Office AddressQUANTICO, VA, 22134-6050, USA
ContactsNo contact information available

Full Description

Show more
Provided below is a list of questions from industry and answers provided by the government. Please note that the Government shall not be held liable or accountable for answers to questions or direction given unless directed by the Contracting Officer through the RFP or RFP Amendments. Question 1 CLIN 0001, MOBILIZATION, for all four sites. Both Section F and the SOW state that the period of performance for the mobilization effort is one month, 1 Jan 2009 through 31 Jan 2009. However, each of CLINs 0002 through 0011 calls for 12 months of services to be supplied. Section F also shows the period of performance to include the month of January 2009. Should this quantity/period of performance be 11 months since mobilization occurs during January 2009? Should the Contract Start Date (CSD) then be identified as 1 February 2009? ANS. The period of performance for the Mobilization and the Contract will be revised in the final RFP. Question 2 CLIN 0005 and CLIN 0006 are for SWET and MAET training, respectively, at Camp Lejeune. However, no MAET facility or equipment is currently located at Camp Lejeune so only SWET training is presently being conducted there (CLIN 0005 structure). CLIN 0005 is the only CLIN that separately calls out and separately prices SWET training. CLIN 0006 is representative of the other three bases, which train both MAET and SWET requirements. Based on this structure, we assume that CLINs 0005 and 0006 are mutually exclusive. Is this assumption correct? If the Camp Lejeune MAET facility is not ready by 1 January 2009, will the Government exercise CLIN 0005 only for the period that the facility is not ready? How much notice will the Government provide when transitioning from CLIN 0005 to CLIN 0006? ANS. the CLIN will be revised in the final RFP. Question 3 CLIN 0011 calls for IPHABD Repairs and Refurbishment. This CLIN does not distinguish between sites. Is this CLIN intended to capture the repair and replacement costs for all contract sites? Is this CLIN intended to account for all costs associated with the IPHABDs; i.e., labor, supply support, and other direct costs? ANS. In the final RFP there will be additional CLINs to cover each site for IPHABD repair and refurbishment. CLIN is all inclusive. Question 4 CLIN 0014 calls for Sea Repair and Refurbishment. This CLIN does not distinguish between sites. Is this CLIN intended to capture the repair and replacement costs for all contract sites? Is this CLIN intended to account for all costs associated with Sea; i.e., labor, supply support, and other direct costs? ANS. Refer to answer on question 3. Question 5 CLINs 0015 through 0030 deal with the acquisition of MAET Reconfigurable Panels. The QUANTITY and UNIT identified in these CLINS are 1 and EACH respectively. Does 1 EACH identify one set of panels for the MAET or one individual panel? ANS. One set. CLIN 0030 identifies the UNIT as LOT, but the other panel-related CLINs identify the unit as EACH. Should the unit be EACH? If not, please explain LOT. ANS. The CLIN will be revised to read Each Question 6 CLIN 0032, TRAVEL. We assume this FFP CLIN is intended to fund the twice yearly Site Manager Conferences. Where will these conferences be held? ANS. At any of the four sites. Question 7 CLIN 0231, SURGE PERSONNEL, is the first occurrence of the requirement to price a Surge requirement. The UNIT for this CLIN is LOT. Does the Government require the capability to exercise surge personnel prior to Year 3 of this contract? Please explain LOT. Since this CLIN is not site specific, does the Government request a single contract surge rate or a rate by site? What is the difference between the Surge Personnel CLIN and the Over & Above requirement CLIN? ANS. In the final RFP, there will be no Surge Personnel CLIN. SECTION C Question 8 Section C.1, STATEMENT OF WORK, states, The Contractor shall furnish the necessary services, supplies, facilities, and materials . . . Since all of the efforts associated with this contract are conducted on Government-provided facilities, what facilities does the Government expect the contractor to supply? ANS. None Government provides facilities. SOW will be revised. SECTION F Question 9 Section F.1, CONTRACT PERIOD OF PERFORMANCE, does not indentify the CSD in Lot I. Since the mobilization period is identified as 1 Jan 31 Jan 2009, it is assumed that CSD is 1 February 2009. Is this correct? ANS. Refer to answer on Question 1. SECTION H Question 10 Section H.1, OVER AND ABOVE WORK REQUESTS, paragraph (a) states that this clause may only be used to support requirements that fall outside the total labor hours for one or more sites. Please clarify, what are the total labor hour requirements for each site? ANS. the paragraph will be revised to say, outside the operational hours in the final RFP. SECTION I Question 11 Clause 252.217-7001, SURGE OPTION, paragraph (a) (1) calls for an increase of supplies or services under the contract by no more than [ ] percent. Please identify the percent increase of supplies or services that the Government expects under the surge option clause. ANS. The Clause will be changed to 252.217-7001, para. (a)(2). SECTION L Question 12 Section L.1, ANTICIPATED AWARD DATE, identifies the anticipated award date as 1 January 2009. This date is also the mobilization start date. 1 January 2009 is also a federal holiday. Please clarify the expected contract award date. ANS. The contract award date will be identified in the final RFP. Question 13 Section L.5, TIME, DATE AND PLACE FOR RECEIPT OF SUBMITTALS, paragraph (a) indicates that final proposals will be due on 5 September 2008 at 1600 hrs EST. Is this the correct date and time for final proposal submittals? ANS. The due date for final proposals will be identified in the final RFP. Question 14 Section L.6.1, ORGANIZATION AND CONTENT, VOLUME I, FACTOR 1, states that the offeror shall provide resumes of key personnel as described in SOW Paragraph 3.4. The referenced SOW paragraph only implies that the Site Manager is the key employee. At the same time, Paragraph 3.4 references the qualification requirements of site personnel as delineated in Appendix C. However, Appendix C does not identify any key personnel. Please identify which employees are key personnel? ANS. All employees at each of the traininig sites are key personnel. See SOW para 3.4, and appendix C. See SOW parAns. 3.2.1. Question 15 Section L.6.1, ORGANIZATION AND CONTENT, VOLUME I, FACTOR 3: PROGRAM MANAGEMENT, SUBFACTOR 3.2: SMALL BUSINESS PARTICIPATION PLAN, establishes a requirement for the contractor to identify and document its commitment to small business organizations. This acquisition is identified as a small business set-aside. By definition, the prime contractor must perform at least 51% of the labor effort associated with the program. Is the government requesting a small business participation plan that quantifies small business participation beyond the efforts that will be accomplished by the prime contractor? ANS. this will be removed from Section L. Question 16 Section L.6.1, ORGANIZATION AND CONTENT, VOLUME I, FACTOR 4: PANEL REPLACEMENT PROGRAM, reference to SOW paragraph 3.6 should instead reference SOW paragraph 3.9. ANS. Will revise. Question 17 Section L.6.1, ORGANIZATION AND CONTENT, VOLUME III: PRICE, provides an example of how panel costs will be evaluated. The CLINs referenced in the example, CLINs 0108, 0109, and 0110, are incorrect. The example CLINs should be 0115, 0119, 0123, and 0127. ANS. Will revise. Question 18 Section L.11, LESS THAN FIVE PERCENT SMALL DISADVANTAGE BUSINESS SUBCONTRACTING GOAL. Is an SDB subcontracting goal associated with this acquisition? ANS. This will be removed from Section L. STATEMENT OF WORK (SOW) Question 19 Paragraph 1, SCOPE, the third paragraph, first sentence states: Additionally, the Contractor shall provide a source for optional panels for the MAET (configurations such as MV-22) and variations of the MAET (SVET) and shall adapt training to meet the requirements for training with those panels. What is meant by adapting training to meet the requirements with the new panels? PM will change to shall modify/adapt training and/or curricula as required to include additions/modifications/panels, etc. to the training device. Is the contractor required to make curriculum changes to the MAET course of instruction?Yes. Who is the USMC MAET curriculum approval authority? TECOM. Will the Government provide the contractor the government-approved MAET course of instruction with this RFP? No Question 20 Paragraph 1, SCOPE, in the first paragraph the initial period is identified as 1 January 2008 through 31 December 2008. Dates should be 2009. ANS. Will revise. Question 21 Paragraph 1.3.1, BASIC LOTS, identifies three contract options. Section F identifies four contract options. We assume the reference in paragraph 1.3.1 should be to four contract options. ANS. Four contract option years. Question 22 Paragraph 1.3.3, CONTINGENCY PLANS, and Paragraph 1.3.4, SURGE CAPABILITY. What is the contractual or performance difference between the two plans referenced in these paragraphs? Both paragraphs require the submittal of plans to handle doubling the number of courses for the two-day curriculAns. Paragraph 1.3.4 also references paragraph 3.9 for the definition of the surge period. This reference is incorrect. ANS. Paragraph 1.3.3 is an overall contingency plan in case of an emergency which will be delivered as a CDRL. Paragraph 1.3.4, Surge Capability, will be required on a case by case basis when the government actually experiences a surge of personnel. Reference of para. 3.9 will be corrected. Question 23 Section 2, APPLICABLE DOCUMENTS, there is no reference to the MAET Technical Data Package (TDP). What constitutes the MAET TDP and where is it located? When will it be provided to the bidders, as indicated in SOW Paragraphs 3.1.9 and 3.2.6. Also in Section 2, and in Appendix B of the SOW, reference is made to MCO 1510.25, Individual Training Standards for Marine Combat Water Survival Training (reference only). Does this document contain the Government-approved training performance requirements and associated curricula? When will this document be provided to the bidders? ANS. These paragraphs are being revised. Paragraph 2.2, NON-GOVERNMENT DOCUMENTS, the two referenced documents were not included with the draft RFP package. When will these documents be provided to the bidders? ANS. Will post the two ITSs with the final RFP. Question 24 Paragraph 3.1.4.1, PRE-CSD MEETING, the 30-days-prior-to-CSD requirement to conduct this meeting does not align with the stated contract award date, mobilization date, or implied CSD. Please clarify when the Government expects to conduct the pre-CSD meeting? Ans. Will be clarified in the final RFP. Question 25 Paragraph 3.1.4.3, SITE MANAGERS/PROGRAM MANAGER REVIEW MEETINGS, where will these meetings be held? Ans. At all of the four training sites. Question 26 Paragraph 3.1.5.1, CONTRACTOR INSTALLED MODIFICATIONS. This paragraph states that it is within the scope of the contract for the contractor to install any and all COR/Government-approved modifications. As it is written, this is an unbounded requirement, as there are no identified limits of what systems or components this requirement applies to. For example, there may be costs for providing necessary skilled labor that exceeds the capabilities of the MAET on-site staff. There may be subcontractor or ODC costs. There is an inherent assumption that the installation of these modifications will not impact training; therefore, it is feasible that overtime will be needed in order to accomplish the installation. Please provide definitization of the requirement. ANS. The COR cannot make any changes to the contract, only the Contracting Officer. This para. Will be revised. No overtime will be allowed. Question 27 Paragraph 3.1.7.1, SUPPLY SUPPORT REQUIREMENTS, states that the contractor is not required to provide replacement items for GFE/GFM items associated with each training device. We assume that this statement is indirectly referencing Appendix D of the SOW. That is, the contractor is not responsible for replacing any of the items that are listed in Appendix D. Is this correct? ANS. That is correct. Question 28 Paragraph 3.1.7.3.1, REPLENISHMENT LIABILITY LIMITATION, there is no liability cost limit established in Section H. Please clarify. ANS. Clarification will be provided in the final RFP. Question 29 Paragraph 3.1.7.6, HAZARDOUS MATERIALS. Can the contractor use base HAZMAT resources? ANS. Contractor shall not rely on government HAZMAT resources. Question 30 Paragraph 3.1.8.1, PROVISIONING, there are no training devices listed in the SOW. Please clarify. ANS. See para. 1.1 Question 31 Paragraph 3.1.9, TECHNICAL DOCUMENTATION, there is no Technical Documentation (TD) listed in the respective appendices for the training devices. Please clarify what TD will be provided for each of the training devices and all its support equipment. ANS. See answer to question 23. Question 32 Paragraph 3.1.9.3, CLEANING, please clarify that the contractor is not responsible for maintaining the facility pools. There are no training system/device appendices provided in the SOW. Can the Government provide facility floor plans that identify the contractor spaces and what areas they are required to maintain? ANS. Government is in charge of pool maintenance. The PM will consider providing facility floor plans that identify the contractor spaces and what areas they are required to maintain. Question 33 Paragraph 3.1.9.11, CONTINUOUS IMPROVEMENT, does this requirement include a continuous review of the MAET curriculum? ANS. Yes Question 34 Paragraph 3.2.1, TASK 1, states: The contractor shall provide the necessary personnel: to deliver appropriate SWET, MAET, SVET, IPHABD and SEA underwater egress training as well as surface water survival training . . .. Paragraph 1, SCOPE, second paragraph states: . . . the Contractor shall provide a program which focuses on the capability of training Marines who may or may not be strong swimmers in the same setting as strong swimmers without any remedial swim training. Paragraph 1 states that remedial swim training is not required, but Paragraph 3.2.1 states that surface water survival training is required. All surface water survival training courses entail some degree of remedial swim training. Please clarify to what extent the contractor is responsible for remedial/surface water survival training as part of this contract. ANS. This is egress-centric training. See para. 1 Scope. Question 35 Paragraph 3.2.1, TASK 1, we assume that the term MAET, as used in this draft RFP and SOW, is a generic term used to describe the USMC Modular Amphibious Egress Trainer (MAET) requirement and not the XXXXXX industry trademark that they have associated with their product. Subparagraph d. of 3.2.1 identifies a Certified OEM Level III Technician-MAET/SVET Maintenance & Operation. Neither the SOW nor the draft RFP provides any explanation of why an OEM-certified Level III Technician is required or what the professional qualifications of this individual are. Since XXXXXX is the incumbent, it is not reasonably to be expected that they will freely provide information clarifying what this certification entails, why it is unique, or how long and what it costs to certify personnel to operate the XXXXXX MAET training device. The MAET training device and associated control station are a run-of-the-mill gantry system with some routine cable system controls to lower and rotate the system in the water. Please clarify why the MAET operator must be OEM certified. If the position must be manned by an XXXXXX-certified technician, please identify the certification requirements and the length of time and costs required to certify personnel to meet the stated requirement. Subparagraph c and e of Paragraph 3.2.1 use the word trained relative to instructors and safety divers. We assume that trained refers to individuals who have experience and training in egress from submerged aircraft and submerged vehicles, and not to specific training or certification from XXXXXX. Is this correct? ANS. The PM will revise. Question 36 Paragraph 3.2.6. TECHNICAL DOCUMENTATION/TRAINING MATERIALS, when will the Government make available copies of the MAET TDP and training materials? ANS. These documents will be made available with the final RFP. All will be provided on the NECO website on or around 8/18/2008. Question 37 Paragraph 3.3, COURSE CURRICULA, this paragraph states . . . The Government will furnish all approved curricula and materials including lesson plans, slides, films, and exams. The Contractor shall demonstrate a proven capacity to expand the training curriculum to include training in the MAET/SVET with full personnel equipment and gear. To what standards must the new or modified curricula material be developed? To the current standards per the PM. Is this development considered in scope of this contract? Yes. How many lessons or hours of deliver training are deemed in scope? Two-Day training, minimum 16 hours. Who is to provide the Subject Matter Experts (SMEs) to evaluate the curricula changes? The Government. Question 38 Paragraph 3.6, MAINTENANCE REQUIREMENTS, states that the Government shall provide all the special tools for the MAET/SVET for all sites. Please provide a list of these tools. ANS. Will provide. Question 39 Paragraph 3.9, FUTURE PLANNED PANELS/MODULES REFURBISHMENT OF SYSTEM, will the Government provide specifications for the existing panels? Will the Government provide specifications for the new panels? (Note: Reference the earlier question associated with paragraph 3.3 and demonstrated capability to expand the training curriculum. The same question applies to the last sentence of paragraph 3.9.) ANS. The current system is a COTS system. Panels are also COTS. Question 40 Appendix C Personnel/Instructor Qualification for Egress/Dunker Training We assume that the term MAET, as used in this draft RFP and SOW, is a generic term used to describe the USMC Modular Amphibious Egress Trainer (MAET) requirement and not the XXXXXX industry trademark that they have associated with their product. Otherwise, the specificity of MAET OEM (XXXXXX) certifications and training in the Appendix C qualifications lends itself to limiting competition as it pertains to this acquisition. ANS. The PM will revise Appendix. Egress training is presently provided by a number of organizations other than XXXXXX. One of the largest underwater egress programs in the world is run by the US Navy (NOMI). This program is highly successful and has numerous personnel who are highly qualified MAET instructors, safety divers, EMTs, and system operators. The specificity of OEM-only certifications in this case XXXXXX, who is also the incumbent contractor in Appendix C would deem these more than qualified US Navy and civilian professionals as unacceptable to work on this program because they do not have the XXXXXX certification or experience. The following questions point to some specific qualifications questions: Paragraph 1. a.1)C)states that the Supervising Instructor must hold a valid certificate in Surface Water Survival. What organization(s) certify the Supervising Instructor as Surface Water Survival competent? What are the professional requirements for Surface Water Survival certification? Paragraph 1.a.1)D) states that the Supervising Instructor must hold a valid certificate in MAET/SVET instruction. What organization(s) certify the Supervising Instructor as MAET/SVET instruction competent? What are the professional requirements for MAET/SVET instruction certification? Paragraph 1.a.1E) states that the Supervising Instructor must have a minimum of 2 years experience in MAET Operations for passengers. Is this experience requirement limited to USMC MAET experience? Paragraphs 1.a.2, PRIMARY INSTRUCTOR and Paragraph 1.Ans.3, ASSISTANT/SECONDARY INSTRUCTOR, have similar certification and experience requirements. The questions above are also relevant to these positions. Paragraph 1.a.4) C), SAFETY DIVER, states that this individual must hold a valid certificate in MAET/SVET Safety Diving. What organization(s) certify the Safety Diver as MAET/SVET Safety Diving competent? What are the professional requirements for MAET/SVET Safety Diving certification? Paragraph 1.a.5) C) states that the Medical Staff must be trained and qualified and/or certified as a Nationally Registered Emergency Medical Technician. Please clarify the differences between trained and qualified EMT and certified EMT? Paragraph 1.a.6) A) states that the Simulator Operator must hold a valid OEM Level III Technician certificate. Neither the SOW nor the draft RFP provides any explanation of why an OEM-certified Level III Technician is required or what the professional qualifications of this individual are. Since XXXXXX is the incumbent, it is not reasonably to be expected that they will freely provide information clarifying what this certification entails, why it is unique, or how long and what it costs to certify personnel to operate the XXXXXX MAET training device. The MAET training device and associated control station are a run-of-the-mill gantry system with some routine cable system controls to lower and rotate the system in the water. Please clarify why the MAET operator must be OEM certified. If the position must be manned by an XXXXXX-certified technician, please identify the certification requirements and the length of time and costs required to certify personnel to meet the stated requirement. ANS. The PM will revise the SOW in terms of level of training and certs required.

Similar Contracts

Same NAICS industry code

NAICS: 611512
New
SLED
Pilot Certification and Training Services
Solicitation # IFB-060-3152603-CF
The County of Orange, through the Sheriff-Coroner agency, is soliciting competitive electronic bids for Pilot Certification and Training Services under solicitation number IFB-060-3152603-CF. The selected contractor must be an FAA-certified Part 61 and/or Part 141 flight school with at least ten years of business experience. The scope of work includes providing all classroom, airtime, ground, and simulator instruction, as well as all necessary course materials and examiner fees. Instructors must be CFIs and CFIIs with three to five years of experience. The contract is intended to run for three calendar years from the date of execution, with services performed at 4011 W. Commonwealth Ave. in Fullerton, California. Award will be granted to the lowest responsive and responsible bidder based on price, capability, past performance, and acceptance of the County's terms. Bidders must provide a valid UEI number, D-U-N-S number, and a SAM.gov confirmation dated within seven days of the bid deadline. Required documentation includes a certification regarding debarment, a W-9 form, and an active certificate from the California Secretary of State. The contract mandates compliance with various federal and state regulations, including the Clean Air Act for agreements exceeding 150,000 dollars, the Davis-Bacon Act, and the Americans with Disabilities Act. Payment will be made in arrears on a net thirty-day basis following written acceptance of services by the County.
Sheriff-Coroner

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → Commander

Same awarding agency

NAICS: 532490
New
Federal
Request For Information - Visual Information Systems Modernization (VISM)
Solicitation # M67854-27-I-2002
The Program Acquisition Executive Marine Corps, through the Program Manager Tactical Communications and Electromagnetic Warfare Systems, is conducting market research via solicitation M67854-27-I-2002 to identify vendors capable of providing commercial-off-the-shelf tactical camera systems, lenses, and accessories. This initiative aims to establish a sustainable, multi-year evergreen technology refresh cycle for the Visual Information Acquisition System Family of Systems using a Hardware-as-a-Service operating lease model. The selected vendor will be responsible for providing latest-generation equipment, managing the technology lifecycle, and executing a mandatory 36-month hardware refresh for all leased components. Key technical requirements include full Trade Agreements Act compliance for all hardware and native or certified compatibility with the Canon RF lens mount standard. The scope of work involves custom kitting, staging, and integration of multi-component systems, including the integration of Government Furnished Equipment laptops, with delivery in government-specified transit cases such as foam-cut Pelican cases. Additionally, the vendor must manage end-of-lease services, including physical return and verified data sanitization of storage media. Interested respondents must provide their business size under NAICS code 532490, details on held government contract vehicles, and cybersecurity compliance information such as CMMC levels. Submissions are required to be sent via DoD SAFE by December 4, 2026, and must include a cover sheet with CAGE and UEI/DUNS information. The government is requesting rough order of magnitude pricing based on an assumed three-year base period.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 313310
New
Federal
Multispectral Camouflage Overgarment
Solicitation # M6785426R5407
The Department of the Navy, United States Marine Corps, through the Portfolio Acquisition Executive Marine Corps, is seeking a small business contractor under NAICS code 313310 and PSC Code 8415 for the manufacture, testing, and delivery of Multi-Spectral Camouflage Overgarments. This procurement will be conducted using FAR Part 15 negotiated procedures for non-commercial supplies. The effort is a 100 percent small business set-aside, with the primary place of performance located in Quantico, Virginia. Due to the presence of Controlled Unclassified Information and Controlled Technical Information, the Statement of Work and Purchase Description are restricted and not available on SAM.gov. To access these documents, prospective offerors must undergo a rigorous vetting process, which includes submitting a formal request with CAGE and UEI details, providing proof of an active Joint Certification Program certification via DD Form 2345, verifying NIST SP 800-171 self-assessment scores in the Supplier Performance Risk System, and executing a Government-furnished Non-Disclosure Agreement. Once verified, documents will be distributed exclusively via DoD SAFE. The contract mandates strict adherence to cybersecurity and data handling standards, including DFARS 252.204-7012, NIST SP 800-171, 32 CFR Part 2002, and DoD Impact Level 5 requirements. Additionally, materials may be subject to ITAR and EAR export controls. Prime contractors are prohibited from sharing restricted materials with subcontractors or partners without prior written approval from the Contracting Officer and the execution of a Tri-Party Non-Disclosure Agreement. Questions regarding this pre-solicitation must be submitted using the provided template by 1600 hours Eastern on November 6, 2026.
Textile and Fabric Finishing Mills

POSTED

2 days ago

DEADLINE

in 8 days
View Details
NAICS: 334220
New
Federal
Request For Information M67854-26-I-2023: Own Force Monitoring at Echelon (OFM-E) Electromagnetic Spectrum Sensing
Solicitation # M67854-26-I-2023
The Program Acquisition Executive Marine Corps, through the Program Manager Tactical Communications and Electromagnetic Warfare Systems, has issued Request for Information M67854-26-I-2023 to conduct market research for Own Force Monitoring/Sensing (OFM/S) capabilities. This effort specifically focuses on Own Force Monitoring at Echelon (OFM-E), seeking vehicle- or command post-mounted systems that provide real-time awareness, passive analysis, and monitoring of electromagnetic spectrum signatures. The goal is to enable Marine Corps units to establish baseline emissions, detect anomalies, and enforce emission control and signature management measures to enhance operational security and survivability in contested environments. The Marine Corps is seeking Commercial Off-The-Shelf (COTS) or Non-Developmental Item (NDI) solutions with a Technology Readiness Level of 8 or 9 that align with the Sensor Open Systems Architecture (SOSA) and feature improved size, weight, and power attributes. Interested businesses under NAICS code 334220 must submit a response package by November 5, 2026, including a specification compliance matrix, technical readiness assessments, and details regarding Technical Data Package rights. This RFI is for informational and planning purposes only and does not constitute a solicitation for bids or a commitment by the government to award a contract.
Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 541513
Federal
Marine Corps Cyberspace Environment (MCCE) Operational Support Services (OSS) and Enterprise Artificial Intelligence (AI) Integration
Solicitation # M6785426I4208
The Marine Corps Systems Command (MARCORSYSCOM) is conducting market research via Request for Information M67854-26-I-4208 to identify commercial partners for the Marine Corps Cyberspace Environment (MCCE) Operational Support Services (OSS) and Enterprise Artificial Intelligence (AI) Integration. The primary objective is to secure skilled, professional IT touch-labor services under a Government-Owned, Government-Operated, Contractor-Supported (GOGOCS) model. While the focus remains on providing DCWF-certified personnel, the government is seeking innovative ways to integrate AI and automation as embedded components of the service delivery model to increase operational efficiency and reduce manual labor costs over time. The government is specifically exploring service-based ordering models, such as procuring hours of service or specific outcomes rather than individual labor categories. For pricing purposes, any contractor-provided proprietary tooling costs must be included within fully burdened labor rates, as this is a services acquisition. Interested respondents must submit a capabilities narrative limited to five pages, a vendor comment matrix in Excel format with a 300-word limit per cell, and optional supplementary materials not exceeding fifteen pages. The current response deadline is November 3, 2026, at 1:00 P.M.
Computer Facilities Management Services

POSTED

7 days ago

DEADLINE

in 5 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS