725-6RW-0777- Water and Electrical
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the installation of a 12-inch steel water mainline spanning 526 feet, along with associated water services, a fire hydrant, and an air and vacuum assembly to ensure proper system function. On the electrical side, the scope includes 665 feet of 5-inch diameter DB100 conduit and 390 feet of 3-inch diameter DB100 conduit, supplemented by 17-by-30-inch handholes and a 3-by-5-foot pullbox to facilitate maintenance and cable management, along with a dedicated transformer pad to support power distribution infrastructure. All work is targeted for Malibu, California, under the oversight of Caltrans District 7, with primary coordination handled by Senior Environmental Scientist Mojgan Abbassi, who can be reached via phone or email for project inquiries. The contract was posted as a forecast on November 12, 2025, and is part of a larger transportation and utility enhancement initiative by the California Department of Transportation.
General Info
Agency
NAICS
Place of Performance
Malibu, CASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
