Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

726-6US-2476 - Utility Pole Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Ventura, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Mojgan AbbassiSenior Env. Sci. (Specialist)

Full Description

Show more
Caltrans approves the encroachment permit for Pacific Bell Telephone Company dba AT&T California to replace the existing damaged pole # 581331H located inside Caltrans right-of-way on State Route (SR) 150 at post mile 1.25, in the City and County of Ventura, and to perform temporary traffic control activities. Excavation will have a maximum depth of 42 inches, an average width of 24 inches, and a maximum length of 2 feet. No public utilities will be relocated, and no new right-of-way will be acquired for the project.

More opportunities from California → Caltrans, District 7 - Los Angeles

Same awarding agency

NAICS: 237310
SLED
I-405 from Wilmington Avenue to Main Street Improvements ProjectThe Los Angeles County Metropolitan Transportation Authority, in cooperation with Caltrans District 7 and the South Bay Cities Council of Governments, is implementing the I-405 from Wilmington Avenue to Main Street Improvements Project in Carson, California. The project focuses on enhancing freeway operations and safety between postmile 9.6 and 12.6 by adding auxiliary lanes to improve weaving, merging, and diverging operations. Additionally, the project will incorporate Transportation System Management and Transportation Demand Management elements to create a Complete Streets environment that improves mobility, accessibility, and connectivity for all transportation modes. The project is currently in the environmental review phase, utilizing a joint NEPA and CEQA compliance process. Key deliverables include the development of a Transportation Management Plan, the relocation of disturbed utility lines, and strict adherence to stormwater pollution prevention and hazardous materials handling protocols. Contractors must comply with Caltrans Standard Specifications and South Coast Air Quality Management District rules, including the use of Tier 4 emissions-compliant engines for off-road equipment. Environmental oversight is managed by Caltrans District 7, with Rocky Rojas serving as a primary point of contact. Public comments and submissions regarding the draft environmental reports are due by September 21, 2026.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS