Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

I-405 from Wilmington Avenue to Main Street Improvements Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Los Angeles County Metropolitan Transportation Authority, in cooperation with Caltrans District 7 and the South Bay Cities Council of Governments, is implementing the I-405 from Wilmington Avenue to Main Street Improvements Project in Carson, California. The project focuses on enhancing freeway operations and safety between postmile 9.6 and 12.6 by adding auxiliary lanes to improve weaving, merging, and diverging operations. Additionally, the project will incorporate Transportation System Management and Transportation Demand Management elements to create a Complete Streets environment that improves mobility, accessibility, and connectivity for all transportation modes. The project is currently in the environmental review phase, utilizing a joint NEPA and CEQA compliance process. Key deliverables include the development of a Transportation Management Plan, the relocation of disturbed utility lines, and strict adherence to stormwater pollution prevention and hazardous materials handling protocols. Contractors must comply with Caltrans Standard Specifications and South Coast Air Quality Management District rules, including the use of Tier 4 emissions-compliant engines for off-road equipment. Environmental oversight is managed by Caltrans District 7, with Rocky Rojas serving as a primary point of contact. Public comments and submissions regarding the draft environmental reports are due by September 21, 2026.

General Info

I-405 freeway improvements in Carson to add lanes and enhance safety for all transportation modes.

Place of Performance

Wilmington Avenue and Main Street, Carson, CA, 90745

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Rocky RojasEnvironmental Scientist
Angie KungPrincipal Environmental Planner

Interested Companies (1)

EGP ConsultingIrvine, CA

Full Description

Show more
The Los Angeles County Metropolitan Transportation Authority (Metro), in cooperation with the California Department of Transportation (Caltrans) and the South Bay Cities Council of Governments (SBCCOG), proposes to improve freeway operations and safety along both directions of Interstate 405 (I-405) from Wilmington Avenue (Postmile [PM] 9.6) to Main Street (PM 12.6) in the City of Carson (City), Los Angeles County, California. The I-405 from Wilmington Avenue to Main Street Improvements Project (Project) proposes to add auxiliary lanes between on- and off-ramps between PM 9.6 and 12.6 to improve weaving, merging, and diverging operations and/or the implementation of Transportation System Management (TSM) and Transportation Demand Management (TDM) elements. The proposed Project would provide improvements to facilitate an integrated approach for all modes of transportation to enhance mobility, accessibility, and connectivity in a Complete Streets environment for all communities along the existing corridor.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and cathodic protection; site work including land surveying, clearing, shoring, and subsurface investigation; and surface improvements such as asphalt paving, landscaping, and the installation of traffic signals and lighting. Additional requirements encompass storm water pollution prevention (SWPPP), the supply of precast concrete and ready mix, and various specialized services like welding and concrete saw cutting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must be invited through the Building Connected electronic system, with a bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for the ADA Improvements at Cannonsburgh Village project, managed by the Parks and Recreation department. The scope of work involves establishing an accessible path to the visitors center toilets from adjacent buildings, which includes hardscape improvements from the street to new accessible parking spaces, the installation of accessible ramps and handrails, and minor interior toilet facility upgrades such as adding ADA grab bars and adjusting fixtures and countertops. All work must adhere to strict quality standards, including ACI 301 and ACI 347-04 for concrete, and requires the use of authorized testing laboratories within the State of Tennessee. Bids are due electronically via the OpenGov portal by 2:00 p.m. local time on November 10, 2026, and will be opened publicly via Zoom. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Submission requirements include a 5% bid security, a 60-day bid validity period, and various certifications, including compliance with Tennessee Licensing Law, the Iran Divestment Act, and Non-Boycott of Israel regulations. The successful contractor must provide performance and payment bonds for 100% of the contract sum and is subject to liquidated damages of $500 per calendar day for failure to achieve substantial completion by the date stipulated in the Notice to Proceed.
Parks and Recreation

POSTED

about 10 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → Caltrans, District 7 - Los Angeles

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS