Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Bridge Structural Modification & Deck Replacement

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract focuses on bridge structural modifications and deck replacements for prime contractors operating within Caltrans District 7, specifically serving the Los Angeles and Long Beach areas. The scope of work involves the modification of bridge structures and the full replacement of decks, utilizing specialized bridge demolition equipment, structural steel, and reinforced concrete. All activities must be performed in strict accordance with Caltrans Standard Specifications to ensure the successful delivery of modified and replaced bridge components. The project falls under NAICS code 237310 and is managed under the jurisdiction of the State of California.

General Info

Subcontract for bridge structural modifications and deck replacements in Caltrans District 7.

Documents

This scope was carved out of 2023120015.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SR-110 Bridge Replacement & Railing Upgrade Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural modifications to bridge components and replaces bridge decks for prime contractors on Caltrans District 7 projects in Los Angeles and Long Beach. Modifies bridge structures and replaces decks per Caltrans Standard Specifications using bridge demolition equipment, reinforced concrete, and structural steel. Delivers modified and replaced bridge structures and decks.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and cathodic protection; site work including land surveying, clearing, shoring, and subsurface investigation; and surface improvements such as asphalt paving, landscaping, and the installation of traffic signals and lighting. Additional requirements encompass storm water pollution prevention (SWPPP), the supply of precast concrete and ready mix, and various specialized services like welding and concrete saw cutting. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must be invited through the Building Connected electronic system, with a bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
SLED
ADA Improvements at Cannonsburgh Village
Solicitation # ITB-10-2027
The City of Murfreesboro, Tennessee, is soliciting sealed bids for the ADA Improvements at Cannonsburgh Village project, managed by the Parks and Recreation department. The scope of work involves establishing an accessible path to the visitors center toilets from adjacent buildings, which includes hardscape improvements from the street to new accessible parking spaces, the installation of accessible ramps and handrails, and minor interior toilet facility upgrades such as adding ADA grab bars and adjusting fixtures and countertops. All work must adhere to strict quality standards, including ACI 301 and ACI 347-04 for concrete, and requires the use of authorized testing laboratories within the State of Tennessee. Bids are due electronically via the OpenGov portal by 2:00 p.m. local time on November 10, 2026, and will be opened publicly via Zoom. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and accepted alternates. Submission requirements include a 5% bid security, a 60-day bid validity period, and various certifications, including compliance with Tennessee Licensing Law, the Iran Divestment Act, and Non-Boycott of Israel regulations. The successful contractor must provide performance and payment bonds for 100% of the contract sum and is subject to liquidated damages of $500 per calendar day for failure to achieve substantial completion by the date stipulated in the Notice to Proceed.
Parks and Recreation

POSTED

about 10 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
RR-26-2067_JaneAddamsMemTlwy(I-90)Rdwy_Bridge_Rehab_PlzImprvmnts_RocktonRdtoRockCutParkRd_MP2.6-10.3
Solicitation # RR-26-2067
Solicitation RR-26-2067 is a construction project issued by the Illinois State Toll Highway Authority for roadway and bridge rehabilitation and plaza improvements on the Jane Addams Memorial Tollway (I-90). The scope of work covers the area from Rockton Road to Rock Cut Park Road, specifically between Milepost 2.6 and Milepost 10.3. The project involves various infrastructure tasks, including the installation of stone matrix warm mix asphalt, bridge cleaning and painting, pipe underdrain removal, and the deployment of fiber optic network equipment. Work must be performed in accordance with IDOT Standard Specifications, Tollway Supplemental Specifications, and specific contract plans. The contract is awarded to the lowest most responsible and responsive bidder based on an award criteria figure, calculated as the base bid minus applicable bid credits, with a bid credit cap of $325,000.00. The performance period begins upon the issuance of a Notice to Proceed and continues until November 17, 2028, with an expiration date of November 17, 2030, and options for further renewal. Bidders must submit electronic proposals via BidBuy by December 17, 2026, including a bid guaranty of 5% of the total bid amount. Contractors are required to comply with the Illinois Prevailing Wage Act and provide various bonds, including performance and payment bonds. Administrative requirements include the electronic submission of weekly payroll reports via the LCPTracker system to avoid payment delays. The solicitation also emphasizes socioeconomic goals, requiring detailed participation and utilization plans for Disadvantaged Business Enterprises (DBE) and Veteran Small Businesses (VOSB). All supplies and services must meet strict quality standards, remaining free from defects for at least twelve months following acceptance.
ENGCONSTRUCT557 - Engineering - Construction

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Caltrans, District 7 - Los Angeles

Same awarding agency

NAICS: 237310
SLED
I-405 from Wilmington Avenue to Main Street Improvements ProjectThe Los Angeles County Metropolitan Transportation Authority, in cooperation with Caltrans District 7 and the South Bay Cities Council of Governments, is implementing the I-405 from Wilmington Avenue to Main Street Improvements Project in Carson, California. The project focuses on enhancing freeway operations and safety between postmile 9.6 and 12.6 by adding auxiliary lanes to improve weaving, merging, and diverging operations. Additionally, the project will incorporate Transportation System Management and Transportation Demand Management elements to create a Complete Streets environment that improves mobility, accessibility, and connectivity for all transportation modes. The project is currently in the environmental review phase, utilizing a joint NEPA and CEQA compliance process. Key deliverables include the development of a Transportation Management Plan, the relocation of disturbed utility lines, and strict adherence to stormwater pollution prevention and hazardous materials handling protocols. Contractors must comply with Caltrans Standard Specifications and South Coast Air Quality Management District rules, including the use of Tier 4 emissions-compliant engines for off-road equipment. Environmental oversight is managed by Caltrans District 7, with Rocky Rojas serving as a primary point of contact. Public comments and submissions regarding the draft environmental reports are due by September 21, 2026.
Highway, Street, and Bridge Construction

POSTED

3 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS