Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

760 Reservoir Management System Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 760 Reservoir Management System Installation project, managed by the Santa Margarita Water District, involves the installation of a chlorine residual control system at the 760 Zone 2 Reservoir in San Juan Capistrano, California. The primary objective of the project is to monitor and maintain total chlorine residual levels within the drinking water supply. The scope of work includes the replacement of equipment and the installation of conduits within the property boundary, utilizing existing buildings to facilitate the upgrades. The project is located at 27271 Calle Delgado and is classified under NAICS code 237110. According to the Notice of Exemption filed on May 29, 2024, the project is exempt from CEQA requirements under Class 1 for Existing Facilities, as all work is contained within the district property line. Tricia Butler, the Chief Engineer, serves as the primary point of contact for the agency.

General Info

Santa Margarita Water District installing chlorine residual control system at 760 Zone 2 Reservoir.

Agency

California → Santa Margarita Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

27271 Calle Delgado, San Juan Capistrano, CA

Set-Aside

NONE

Documents

(1)

NOE 24-85000470 760 Reservoir Management System Installation

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Installation of chlorine residual control system at 760 Zone 2 Reservoir to monitor and maintain total chlorine residual within drinking water. Project utilizes existing buildings but requires equipment replacement and conduits within property boundary. Beneficiary is Santa Margarita Water District.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 13 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 13 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves of various diameters, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified entities, with a bid response deadline of September 29, 2026. James W. Fowler Co. is actively encouraging M/W/DBE participation and offering support for bonding, insurance, and material procurement to qualified subcontractors.
James W. Fowler Co.

POSTED

about 13 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS