Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

760179_Group_Aera_UIC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Aera Energy LLC is seeking regulatory approval from the California Department of Conservation, Geologic Energy Management Division (CalGEM) to rework eight existing oil and gas wells in the South Belridge Oil Field located in Kern County, California. The project involves downhole modifications including adding perforations, installing wire-wrapped screens, and gravel packing to enhance well integrity and production efficiency without expanding surface facilities or altering existing infrastructure. The specific wells targeted for rework are identified by their API numbers: 0403069394 (WD26-2), 0403069369 (WD33-11), 0403069375 (WD33-3), 0403069404 (WD38-2), 0403069391 (WD53-11), 0403069379 (WD54-3), 0403069382 (WD55-3), and 0403069451 (WD75-3). The proposed activities fall under categorical exemptions under the California Environmental Quality Act (CEQA), specifically Class 1 for maintenance of existing facilities, Class 2 for replacement or reconstruction, and Class 4 for minor land alterations, as outlined in 14 CCR §§ 15301, 15302, and 15304, along with CalGEM-specific provisions in 14 CCR §§ 1684.1 and 1684.2. CalGEM has certified that the project meets exemption criteria due to negligible expansion of use and minor alterations to existing infrastructure. The work will be performed at the existing well sites within the South Belridge Oil Field, with regulatory approval serving as the primary acceptance mechanism. There is no disclosed contract value, payment terms, invoicing method, or traditional procurement structure, as this is an environmental permitting action rather than a federally funded contract. The California Department of Conservation, through CalGEM, serves as the regulatory oversight agency, with general contact information provided for administrative inquiries. No FAR clauses, federal acquisition requirements, small business certifications, or contract administration details are applicable, as the process is governed solely by state environmental regulations. Permits are pending formal approval, and no performance schedule, delivery timeline, or subcontracting obligations are

General Info

Aera Energy seeks CalGEM approval to rework eight existing wells in South Belridge Oil Field with minor downhole upgrades.

Agency

California Conservation, Department of

NAICS

213111 - Drilling Oil and Gas WellsView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

760179_Group_Aera_UIC CEQA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Conservation, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Catherine CalantasOffice Technician

Full Description

Show more
Aera proposes to rework a total of eight existing Oil and Gas wells in the existing and heavily developed South Belridge Oil Field to continue oil and gas resource development. The project will involve adding perforations, running and gravel packing a wire wrapped screen. The proposed project consists of the California Department of Conservation, Geologic Energy Management Division (CalGEM) approving eight permits for Aera to rework the well listed below, in the South Belridge Oil Field. API # Well Name 0403069394 WD26-2 0403069369 WD33-11 0403069375 WD33-3 0403069404 WD38-2 0403069391 WD53-11 0403069379 WD54-3 0403069382 WD55-3 0403069451 WD75-3

Similar Contracts

Same NAICS industry code

NAICS: 213111
New
Construction of the Monitoring Well AR-MW-04 IEUA 1158 Reservoir Site
Solicitation # construction-monitoring-well-ar-mw-04-ieua-1158-reservoir-site
The Inland Empire Utilities Agency is seeking qualified subcontractors to support the construction of a nested monitoring well designated AR-MW-04 at the 1158 Reservoir Site in California. The scope of work involves furnishing, installing, commissioning, and starting up a single borehole containing three 4-inch diameter monitoring well casings nested within one another, extending to a depth of approximately 1,000 feet. This project is designed to support environmental monitoring efforts and requires precise technical execution to ensure proper well construction and functionality in accordance with regulatory and operational standards. The solicitation is reserved exclusively for small business concerns under various SBA-designated categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business. The North American Industry Classification System code is 213111, indicating it falls under oil and gas drilling services. Proposals must be submitted by September 9, 2026, and all inquiries should be directed to Jordan Villalobos at the provided contact information. Performance of the work is required at the specified reservoir site in California, and interested parties are expected to demonstrate capacity to meet technical, safety, and scheduling requirements for subsurface well construction.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 213111
New
Federal
Well Drilling and Casing InstallationThe contract requires the drilling of a water well to a specified depth, including the installation of suitable casing and screens to ensure structural integrity and water quality. Pump installation must be completed, followed by comprehensive pump testing to verify performance and flow rates under operational conditions. All work must adhere strictly to ASTM D1785 and D2241 standards for polyvinyl chloride piping and pressure ratings, as well as the California Plumbing Code to meet regulatory and safety requirements. Upon completion, the contractor must submit detailed as-built reports and official test results documenting the well’s construction, materials used, and performance metrics. This is a small business set-aside subcontract under NAICS code 213111 for water well drilling services, issued by the USDA Forest Service through its CSA Southwest 6 office. The solicitation was posted on August 7, 2026, with a response deadline of September 1, 2026, at 6:00 PM. The place of performance and specific location details are not provided in the data, but the project is governed by federal procurement regulations and requires full compliance with state and national technical standards. Participation is restricted to certified small businesses as defined by the SBA, and all deliverables must be submitted in a timely and accurate manner to fulfill contractual obligations.
Csa Southwest 6 Usda-Fs

POSTED

about 24 hours ago

DEADLINE

in 24 days
View Details
NAICS: 213111
New
SLED
Sentinel Peak Resources California LLC, Midway Sunset (Band Lease), CalGEM PFID 785461Sentinel Peak Resources California LLC plans to drill a single exploratory oil and gas well on BLM-administered public lands within the Midway Sunset Oilfield, approximately 2.5 miles northwest of Fellows, California, alongside Highway 33 between Sunrise Cogen Road and Mocal Road. The project entails minimal surface disturbance, involving the grading of a 200-foot by 100-foot well pad, resulting in only 0.50 acres of permanent land impact. No additional infrastructure such as flowlines or production facilities will be constructed, as this is strictly an exploratory effort. The entire project is scheduled to be completed in ten days, with two days of grading using 10-hour workdays, six consecutive days of 24-hour drilling operations, and two final days of completion work at 10 hours per day. The project is being managed under the California Department of Conservation, with primary oversight and environmental coordination handled by the agency through its California Energy and Geology Division. The project is associated with CalGEM PFID 785461 and has been posted as a forecast on August 7, 2026. Point of contact for environmental planning and regulatory matters is Mikayla Vaba at the Department of Conservation, while Thomas Cruise of Sentinel Peak Resources serves as the company agent. The Bureau of Land Management is also involved through its California office, ensuring compliance with federal land use requirements. All activities are confined to the established well pad footprint and do not extend beyond the scope of exploratory drilling, with no long-term operational impacts anticipated.
California Conservation, Department of

POSTED

1 day ago

DEADLINE

N/A
View Details